HillTopper Wind Farm
The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity.[1] The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018.[2]
Detail
The HillTopper complex's 74 wind turbines are each rated at 2.5 mW.[3] The project's overall 185-mW capacity was pre-sold to Bloomberg LP, Danone North America, General Motors, and Starbucks.[1] The complex utilizes leasehold rights to 7,500 acres of land.[2]
References
- "HillTopper Wind Farm, USA". enelgreenpower.com. Enel. Retrieved October 24, 2022.
- Blanchette, David (August 12, 2019). "Wind farm project starting in Mount Pulaski area". State Journal-Register. Springfield, Illinois. Retrieved October 24, 2022.
- "HillTopper (USA)". thewindpower.net. The Windpower. Retrieved October 24, 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.