Line 2 (Changchun Rail Transit)
Line 2 of the Changchun Rail Transit (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun.
| Line 2 | |
|---|---|
|  | |
| .jpg.webp) Line 2 train departing from Jiefang Ave. Station | |
| Overview | |
| Status | Operational | 
| Owner | Changchun | 
| Locale | Changchun, Jilin, China | 
| Termini | 
 | 
| Stations | 21 | 
| Service | |
| Type | Rapid transit | 
| System | Changchun Rail Transit | 
| Services | 1 | 
| Operator(s) | Changchun Rail Transit Corporation | 
| History | |
| Opened | 30 August 2018 | 
| Technical | |
| Line length | 24.9 km (15.47 mi)[1] | 
| Number of tracks | 2 | 
| Character | Underground | 
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | 
History
    
    Phase 1
    
Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.[2]
Opening timeline
    
| Segment | Commencement | Length | Station(s) | Name | 
|---|---|---|---|---|
| Shuangfeng — Dongfang Square | 30 August 2018 | 20.5 km (12.74 mi)[2] | 18 | Phase 1 | 
| Shuangfeng — Qiche Gongyuan | 8 October 2021[1] | 4.36 km (2.71 mi)[3] | 3 | Western extension | 
Service routes
    
- Qiche Gongyuan — Dongfang Square
Stations
    
| Station name | Connections | Distance km | Location | ||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| Qiche Gongyuan | 汽车公园 | Luyuan | |||||
| Jieda Avenue | 捷达大路 | ||||||
| West Lake | 西湖 | ||||||
| Shuangfeng | 双丰 | 2.18 | 2.18 | ||||
| Changchun West Railway Station | 长春西站 | CJ ~ JH  Trams 55  CRT | 1.52 | 3.70 | |||
| Xinglongpu | 兴隆堡 | 2.09 | 5.79 | ||||
| West Ring Road | 西环城路 | 1.41 | 7.20 | ||||
| Heping Street | 和平大街 | 1.14 | 8.34 | ||||
| Wanfu Street | 万福街 |  Trams 54 | 0.82 | 9.16 | |||
| Jingyang Square | 景阳广场 | 0.86 | 10.02 | ||||
| Jiefang Overpass | 解放桥 | 3 | 1.07 | 11.09 | Luyuan / Chaoyang | ||
| Jianshe Square | 建设广场 | 0.80 | 11.89 | Chaoyang | |||
| Wenhua Square | 文化广场 | 0.75 | 12.64 | ||||
| Jiefang Avenue | 解放大路 | 1 | 1.36 | 14.00 | Chaoyang / Nanguan | ||
| Pingyang Street | 平阳街 | 0.78 | 14.78 | Nanguan | |||
| Nanguan | 南关 | 1.12 | 15.90 | ||||
| Jilin Avenue | 吉林大路 | 4 | 1.31 | 17.21 | Erdao | ||
| Dongsheng Street | 东盛大街 | 0.99 | 18.20 | ||||
| East Ring Road | 东环城路 | 1.46 | 19.66 | ||||
| Changqing | 长青 | 1.27 | 20.93 | Erdao / Nanguan | |||
| Dongfang Square | 东方广场 | 1.38 | 22.31 | Erdao | |||
Future Development
    
- Eastern extension
An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.[4] It's scheduled to open in 2025.
References
    
-  10月8日8时 长春轨道交通2号线西延线将开通运营.  新浪吉林 (in Chinese). 2021-10-07. Archived from the original on 2021-10-07. Retrieved 2021-11-28. 2号线运营里程增长4.4公里,达到24.9公里 
- 长春地铁进入换乘时代 2号线8月30日通车. 新华网吉林 (in Chinese). 2018-08-30. Archived from the original on 2019-10-07. Retrieved 2019-10-07.
-  长春地铁2号线西延线预计今年年末开通.  中国新闻网 (in Chinese). 2021-04-07. Archived from the original on 2021-08-08. Retrieved 2021-08-08. 线路全长4.36km,共设车站3座,均为地下站 
- 长春地铁2号线东延工程项目正式开工. 搜狐 (in Chinese). 2019-11-27. Archived from the original on 2021-02-04. Retrieved 2019-11-27.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.

