List of commercial nuclear reactors

This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of April 2023, there are 413 operable power reactors in the world, with a combined electrical capacity of 378.9 GW. Additionally, there are 59 reactors under construction and 103 reactors planned, with a combined capacity of 65 GW and 106 GW, respectively, while 325 more reactors are proposed.[1] For non-power reactors, see List of nuclear research reactors. For fuel plants see List of Nuclear Reprocessing Plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[2]

In the following tables, the net capacity or reference unit power, expressed in megawatt (MW), is the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[3]

Argentina

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Atucha[4]1PHWRSiemens-KWUOperational3351 June 196824 June 1974
2PHWRSiemens-KWUOperational69214 July 198127 June 2014
3PWRHualong OnePlanned[5](1200)
Embalse[6]1PHWRCANDU-6Operational6001 April 197420 January 1984(2049)[7]
CAREM1PWRCAREM25Under construction258 February 2014

Armenia

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Metsamor1PWRVVER-440 V-270Shut down3761 July 19696 October 197725 February 1989
2PWRVVER-440 V-270Operational3751 July 19753 May 1980(2026)[8]

Austria

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Zwentendorf1BWRBWR-69 (KWU)Finished; never entered service878April 19725 November 1978

Bangladesh

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Rooppur1PWRVVER-1200/523Under construction108030 November 2017[9](2024)[10]
2PWRVVER-1200/523Under construction108014 July 2018(2025)

Belarus

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Ostrovets1PWRVVER-1200 V-491Operational11096 November 201310 June 2021[11]
2PWRVVER-1200 V-491Under commissioning110924 April 2014(2023)
Minsk1PWRVVER-1000Unfinished96319831987
2PWRVVER-1000Unfinished96319831987

Belgium

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
SCK•CEN1PWRWestinghouse (WH) BR-3Decommissioned101 November 195710 October 196230 June 1987
Doel1PWRWH 2 loopsOperational4451 July 196915 February 1975(2025)
2PWRWH 2 loopsOperational4451 September 19711 December 1975(2025)
3PWRFramatome 3 loopsShut down10061 January 19751 October 198223 September 2022[12]
4PWRBelgian firms plus WH 3 loopsOperational10391 December 19781 July 1985(2035)[13]
Tihange1PWRFramatome 3 loopsOperational9621 June 19701 October 1975(2025)
2PWRFramatome 3 loopsShut down10081 April 19761 June 198331 January 2023
3PWRBelgian firms plus WH 3 loopsOperational10461 November 19781 September 1985(2035)

Brazil

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Angra1PWRWH 2 loopsOperational6091 May 19711 January 1985
2PWRPre-KonvoiOperational12751 January 19761 February 2001
3PWRPre-KonvoiUnder construction12451 June 2010(2026)[14]

Bulgaria

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Kozloduy1PWRVVER-440/V-230Shut down4081 April 197028 October 197431 December 2002
2PWRVVER-440/V-230Shut down4081 April 197010 November 197531 December 2002
3PWRVVER-440/V-230Shut down4081 October 197320 January 198131 December 2006
4PWRVVER-440/V-230Shut down4081 October 197320 June 198231 December 2006
5PWRVVER-1000/V-320Operational9639 July 198023 December 1988
6PWRVVER-1000/V-320Operational9631 April 198230 December 1993
7PWRTBDPlanned1000
Belene1PWRVVER-1000/V-320
VVER-1000/V-446B
Unfinished
2PWRVVER-1000/V-320
VVER-1000/V-446B
Unfinished

Canada

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Pickering1PHWRCANDU 500AOperational515June 196629 July 1971(2024)
2PHWRCANDU 500AShut down515September 196630 December 19711997
3PHWRCANDU 500AShut down515December 19671 June 19721997
4PHWRCANDU 500AOperational515May 196817 June 1973(2024)
5PHWRCANDU 500BOperational516November 197410 May 1983(2026)
6PHWRCANDU 500BOperational516October 19751 February 1984(2026)
7PHWRCANDU 500BOperational516March 19761 January 1985(2026)
8PHWRCANDU 500BOperational516September 197628 February 1986(2026)[15]
Darlington1PHWRCANDU 850Operational878April 198214 November 1992(2052)
2PHWRCANDU 850Operational878September 19819 October 1990(2050)
3PHWRCANDU 850Operational878September 198414 February 1993(2053)
4PHWRCANDU 850Operational878July 198514 June 1993(2053)
5[16]BWRBWRX-300Planned300(2023)(2028)
6[16]BWRBWRX-300Planned300(2023)(2028)
Bruce1PHWRCANDU 791Operational823June 19711 September 1977(2043)
2PHWRCANDU 791Operational823[17]December 19701 September 1977(2043)
3PHWRCANDU 750AOperational817July 19721 February 1978(2064)[18]
4PHWRCANDU 750AOperational817September 197218 January 1979(2064)
5PHWRCANDU 750BOperational817June 19781 March 1985(2064)
6PHWRCANDU 750BOperational826[19]January 197815 September 1984(2064)
7PHWRCANDU 750BOperational817May 197910 April 1986(2064)
8PHWRCANDU 750BOperational817August 197922 May 1987(2064)
NPD1PHWRCANDUShut down19January 19584 June 19621987
Douglas Point1PHWRCANDU 200Shut down200February 196026 September 19684 May 1984
Gentilly1BWRCANDU BLWR 250Shut down250September 19661 May 19721977
2PHWRCANDU-6Shut down635April 19741 October 198328 December 2012
Point Lepreau1PHWRCANDU-6Operational635May 19751 February 1983(2041)

China

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Bailong1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
ChangjiangI-1PWRCNP-600Operational60125 April 201025 December 2015
I-2PWRCNP-600Operational60121 November 201020 June 2016
I-3[20]PWRHualong OneUnder construction120031 March 2021[21]
I-4[20]PWRHualong OneUnder construction120031 March 2021[21]
II-1PWRACP-100Under construction10013 July 2021
II-2PWRACP-100Planned100
Daya Bay1PWRM-310Operational9447 August 19871 February 1994
2PWRM-310Operational9447 April 19886 May 1994
Fangchenggang1PWRCPR-1000Operational100030 July 201025 October 2015
2PWRCPR-1000Operational100023 December 201015 July 2016
3PWRHualong OneOperational100024 December 201525 March 2023
4PWRHualong OneUnder construction100024 December 2016(2024)
5PWRHualong OnePlanned1117
6PWRHualong OnePlanned1117
Fangjiashan1PWRCPR-1000Operational101226 December 200815 December 2014
2PWRCPR-1000Operational101217 July 200912 February 2015
Fuqing1PWRCPR-1000Operational100021 November 200819 November 2014
2PWRCPR-1000Operational100017 June 200915 October 2015
3PWRCPR-1000Operational100031 December 20107 September 2016
4PWRCPR-1000Operational100017 November 201231 July 2017
5PWRHualong OneOperational100015 April 201530 January 2021[22]
6PWRHualong OneOperational100022 December 201525 March 2022[23]
Haiyang1PWRAP1000Operational117024 September 200923 October 2018[24]
2PWRAP1000Operational117020 June 20109 January 2019[25]
3PWRCAP-1000Under construction11007 July 2022[26]
4PWRCAP-1000Under construction110022 April 2023[27]
Haixing[28]1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
Hongyanhe1PWRCPR-1000Operational106118 August 20076 June 2013
2PWRCPR-1000Operational106128 March 200813 May 2014
3PWRCPR-1000Operational10617 March 200923 March 2015
4PWRCPR-1000Operational106115 August 20091 April 2016
5PWRACPR-1000Operational106129 March 20152 August 2021[29]
6PWRACPR-1000Operational106124 July 201523 June 2022
Lianjiang[30]1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
Ling Ao1PWRM-310Operational95015 May 199728 May 2002
2PWRM-310Operational95028 November 19978 January 2003
3PWRCPR-1000Operational100715 December 200515 September 2010
4PWRCPR-1000Operational100715 June 20067 August 2011
Lufeng1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
3PWRCAP-1000Planned1100
4PWRCAP-1000Planned1100
5PWRHualong OneUnder construction10008 September 2022[31]
6PWRHualong OnePlanned1000
Ningde1PWRCPR-1000Operational101818 February 200815 April 2013
2PWRCPR-1000Operational101812 November 20084 May 2014
3PWRCPR-1000Operational10188 January 201010 June 2015
4PWRCPR-1000Operational101829 September 201029 March 2016
5PWRHualong OnePlanned1080
6PWRHualong OnePlanned1080
Pengze1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
QinshanI-1PWRCNP-300Operational30820 March 19851 April 1994
II-1PWRCNP-600Operational6102 June 199615 April 2002
II-2PWRCNP-600Operational6101 April 19973 May 2004
II-3PWRCNP-600Operational61928 April 20065 October 2010
II-4PWRCNP-600Operational61928 January 200730 December 2011
III-1PHWRCANDU-6Operational6778 June 199831 December 2002
III-2PHWRCANDU-6Operational67725 September 199824 July 2003
San'ao[32] 1PWRHualong OneUnder construction111731 December 2020
2PWRHualong OneUnder construction100030 December 2021[33]
Sanmen1PWRAP1000Operational115719 April 200921 September 2018[34]
2PWRAP1000Operational115715 December 20095 November 2018[35]
3PWRCAP-1000Under construction116328 June 2022[36]
4PWRCAP-1000Under construction110022 March 2023[37]
ShidaowanI-1HTGRHTR-PMOperational2009 December 201220 December 2021[38]
II-1PWRCAP-1400Under construction140019 June 2019
II-2PWRCAP-1400Under construction140021 April 2020
Taipingling1PWRHualong OneUnder construction111626 December 2019
2PWRHualong OneUnder construction111615 October 2020[39]
Taishan1PWREPROperational166018 November 200914 December 2018[40]
2PWREPROperational166015 April 20107 September 2019[41]
3PWREPRPlanned1660
4PWREPRPlanned1660
Taohuajiang1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
3PWRCAP-1000Planned1100
4PWRCAP-1000Planned1100
Tianwan1PWRVVER-1000Operational99020 October 199917 May 2007
2PWRVVER-1000Operational99020 September 200016 August 2007
3PWRVVER-1000Operational104527 December 201214 February 2018
4PWRVVER-1000Operational104527 September 201322 December 2018[42]
5PWRACPR-1000Operational100027 December 20158 September 2020[43]
6PWRACPR-1000Operational10007 September 20163 June 2021
7PWRVVER-1200Under construction115019 May 2021(2027–2028)
8PWRVVER-1200Under construction115025 February 2022[44](2027–2028)
Xianning1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
Xiapu[45]I-1SFRCFR-600Under construction64229 December 2017(2023)[46]
I-2SFRCFR-600Under construction[46]64227 December 2020[46]
II-1PWRCAP-1000Planned1100
II-2PWRCAP-1000Planned1100
II-3PWRCAP-1000Planned1100
II-4PWRCAP-1000Planned1100
Xudabao1PWRCAP-1000Planned1100
2PWRCAP-1000Planned1100
3PWRVVER-1200[30]Under construction115028 July 2021[47](2027)
4PWRVVER-1200[30]Under construction115019 May 2022[48](2028)
Yangjiang1PWRCPR-1000Operational100016 December 200825 March 2014
2PWRCPR-1000Operational10004 June 20098 June 2015
3PWRCPR-1000+Operational100015 November 20101 January 2016
4PWRCPR-1000+Operational100017 November 201215 March 2017
5PWRACPR-1000Operational100018 September 201312 July 2018[49]
6PWRACPR-1000Operational100023 December 201324 July 2019
Zhangzhou1PWRHualong OneUnder construction112616 October 2019[50]
2PWRHualong OneUnder construction11264 September 2020[39]
3PWRHualong OnePlanned1000
4PWRHualong OnePlanned1000

Cuba

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Juragua1PWRVVER-440 V-318Unfinished44019835 September 1992
2PWRVVER-440 V-318Unfinished44019855 September 1992

Czech Republic

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Dukovany1PWRVVER-440 V-213Operational4681 January 19793 May 1985
2PWRVVER-440 V-213Operational4711 January 197921 March 1986
3PWRVVER-440 V-213Operational4681 March 197920 December 1986
4PWRVVER-440 V-213Operational4711 March 197919 July 1987
5PWRTBDPlanned1200
Temelín1PWRVVER-1000Operational10031 February 198710 June 2002
2PWRVVER-1000Operational10031 February 198718 April 2003

Egypt

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
El Dabaa1PWRVVER-1200Under construction120020 July 2022[51](2028)
2PWRVVER-1200Under construction120019 November 2022[52]
3PWRVVER-1200Under construction12003 May 2023[53]
4PWRVVER-1200Planned1200

Finland

Name Unit
No.
Reactor Status Net capacity (MW)[54] Construction start Commercial operation[54] Closure
TypeModel
Hanhikivi1PWRVVER-1200/V-491Never built1200(2023)(2029)2 May 2022[55][56]
Loviisa1PWRVVER-440/V-213Operational5071 May 19719 May 1977
2PWRVVER-440/V-213Operational5071 August 19725 January 1981
Olkiluoto1BWRASEA-III, BWR-2500Operational8901 February 197410 October 1979
2BWRASEA-III, BWR-2500Operational8901 November 197510 July 1982[57]
3PWREPROperational160012 August 20051 May 2023[58]

France

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Belleville1PWRP4 REP 1300Operational13101 May 19801 June 1988
2PWRP4 REP 1300Operational13101 August 19801 January 1989
Blayais1PWRCP1Operational9101 January 19771 December 1981
2PWRCP1Operational9101 January 19771 February 1983
3PWRCP1Operational9101 April 197814 November 1983
4PWRCP1Operational9101 April 19781 October 1983
Brennilis1HWGCRShut down/in decommissioning701 July 19621 June 196831 July 1985
Bugey1GCRUNGGShut down5401 December 19651 July 197227 May 1994
2PWRCP0Operational9101 November 19721 March 1979
3PWRCP0Operational9101 September 19731 March 1979
4PWRCP0Operational8801 June 19741 July 1979
5PWRCP0Operational8801 July 19743 January 1980
Cattenom1PWRP4 REP 1300Operational130029 October 19791 April 1987
2PWRP4 REP 1300Operational130028 July 19801 February 1988
3PWRP4 REP 1300Operational130015 June 19821 February 1991
4PWRP4 REP 1300Operational130028 September 19831 January 1992
ChinonA-1GCRUNGGShut down701 February 19571 February 196416 April 1973
A-2GCRUNGGShut down1801 August 195924 February 196514 June 1985
A-3GCRUNGGShut down3601 March 19614 August 196615 June 1990
B-1PWRCP2Operational9051 March 19771 February 1984
B-2PWRCP2Operational9051 March 19771 August 1984
B-3PWRCP2Operational9051 October 19804 March 1987
B-4PWRCP2Operational9051 February 19811 April 1988
ChoozA-1PWRCHOOZ-ADecommissioned3051 January 196215 April 196730 October 1991
B-1PWRN4 REP 1450Operational15001 January 198415 May 2000
B-2PWRN4 REP 1450Operational15001 January 198415 May 2000
Civaux1PWRN4 REP 1450Operational149515 October 198829 January 2002
2PWRN4 REP 1450Operational14951 April 199123 April 2002
Cruas1PWRCP2Operational9151 August 19782 April 1984
2PWRCP2Operational91515 November 19781 April 1985
3PWRCP2Operational91515 April 197910 September 1984
4PWRCP2Operational9151 October 197911 February 1985
Dampierre1PWRCP1Operational8901 February 197510 September 1980
2PWRCP1Operational8901 April 197516 February 1981
3PWRCP1Operational8901 September 197527 May 1981
4PWRCP1Operational8901 December 197520 November 1981
Fessenheim1PWRCP0Shut down8801 September 19711 January 197822 February 2020
2PWRCP0Shut down8801 February 19721 April 197829 June 2020
Flamanville1PWRP4 REP 1300Operational13301 December 19791 December 1986
2PWRP4 REP 1300Operational13301 May 19809 March 1987
3PWREPRUnder construction16003 December 2007(2024)[59]
Golfech1PWRP4 REP 1300Operational131017 November 19821 February 1991
2PWRP4 REP 1300Operational13101 October 19844 March 1994
Gravelines1PWRCP1Operational9101 February 197525 November 1980
2PWRCP1Operational9101 March 19751 December 1980
3PWRCP1Operational9101 December 19751 June 1981
4PWRCP1Operational9101 April 19761 October 1981
5PWRCP1Operational9101 October 197915 January 1985
6PWRCP1Operational9101 October 197925 October 1985
Phénix1FBRPH-250Shut down1301 November 196814 July 19741 February 2010
Nogent1PWRP4 REP 1300Operational131026 May 198124 February 1988
2PWRP4 REP 1300Operational13101 January 19821 May 1989
Paluel1PWRP4 REP 1300Operational133015 August 19771 December 1985
2PWRP4 REP 1300Operational13301 January 19781 December 1985
3PWRP4 REP 1300Operational13301 February 19791 February 1986
4PWRP4 REP 1300Operational13301 February 19801 June 1986
Penly1PWRP4 REP 1300Operational13301 September 19821 December 1990
2PWRP4 REP 1300Operational13301 August 19841 November 1992
Saint-Alban1PWRP4 REP 1300Operational133529 January 19791 May 1986
2PWRP4 REP 1300Operational133531 July 19791 March 1987
Saint-LaurentA-1GCRUNGGShut down3901 October 19631 June 196918 April 1990
A-2GCRUNGGShut down4651 January 19661 November 197127 May 1992
B-1PWRCP2Operational9151 May 19761 August 1983
B-2PWRCP2Operational9151 July 19761 August 1983
Superphénix1FBRNa-1200Shut down/in decommissioning120013 December 19761 December 198631 December 1998
Tricastin1PWRCP1Operational9151 November 19741 December 1980
2PWRCP1Operational9151 December 19741 December 1980
3PWRCP1Operational9151 April 197511 May 1981
4PWRCP1Operational9151 May 19751 November 1981

Germany

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
AVR1HTGRPBR PrototypeShut down131 August 196119 May 196931 December 1988
Biblis1PWRSiemens-KWUShut down/in decommissioning11671 January 197026 February 19756 August 2011
2PWRKWUShut down/in decommissioning12401 February 197231 January 19776 August 2011
Brokdorf1PWRKWUShut down14101 January 197622 December 198631 December 2021
Brunsbüttel1BWRBWR-69Shut down77115 April 19709 February 19776 August 2011
Emsland1PWRKonvoi (KWU)Shut down132910 August 198220 June 198815 April 2023
Grafenrheinfeld1PWRKWUShut down12751 January 197517 June 198227 June 2015
Greifswald1PWRVVER-440 V-230Shut down/in decommissioning4081 March 197012 July 197414 February 1990
2PWRVVER V-230Shut down/in decommissioning4081 March 197016 April 197514 February 1990
3PWRVVER V-230Shut down/in decommissioning4081 April 19721 May 197828 February 1990
4PWRVVER V-230Shut down/in decommissioning4081 April 19721 November 197922 July 1990
5PWRVVER V-213Shut down/in decommissioning4081 December 19761 November 198924 November 1989
6PWRVVER V-213Finished; never entered service408
Grohnde1PWRKWUShut down13601 June 19761 February 198531 December 2021[60]
Grosswelzheim1BWRBWRShut down/dismantled251 January 19652 August 197020 April 1971
GundremmingenABWRGE, BWR-1Shut down/in decommissioning23712 December 196212 April 196713 January 1977
BBWRBWR-72 (KWU)Shut down128420 July 197619 July 198431 December 2017[61]
CBWRBWR-72 (KWU)Shut down128820 July 197618 January 198531 December 2021[60]
Isar1BWRBWR-69Shut down/in decommissioning8781 May 197221 March 19796 August 2011
2PWRKonvoi (KWU)Shut down141015 September 19829 April 198815 April 2023
Kahl1BWRBWRShut down/dismantled151 July 19581 February 196225 November 1985
SNR-3001FBRFinished; never entered service19721985
KNK II1FBRShut down171 September 19743 March 197923 August 1991
Krümmel1BWRBWR-69 (KWU)Shut down13465 April 197428 March 19846 August 2011
Lingen1BWRBWRShut down1831 October 19641 October 19685 January 1977
Mülheim-Kärlich1PWRB & WShut down/in decommissioning121915 January 19758 August 19879 September 1988
MZFR1PHWRPHWRShut down521 December 196119 December 19663 May 1984
Neckarwestheim1PWRKWUShut down7851 February 19721 December 19766 August 2011
2PWRKonvoi (KWU)Shut down13109 November 198215 April 198915 April 2023
Niederaichbach1HWGCRPressure tube reactorShut down/decommissioned1001 June 19661 January 197331 July 1974
Obrigheim1PWRSiemensShut down/in decommissioning34015 March 196531 March 196911 May 2005
Philippsburg1BWRBWR-69Shut down8901 October 197026 March 19806 August 2011
2PWRKWUShut down14027 July 197718 April 198531 December 2019[62]
Rheinsberg1PWRVVER-70Shut down/in decommissioning621 January 196011 October 19661 June 1990
Stade1PWRSiemensShut down/in decommissioning6401 December 196719 May 19724 November 2003
Stendal1PWRVVER-1000/320Unfinished19831990
2PWRVVER-1000/320Unfinished19831990
3PWRVVER-1000/320Never built
4PWRVVER-1000/320Never built
THTR-3001HTGRPBRDecommissioned2963 May 19711 June 198729 September 1988
Unterweser1PWRKWUShut down/in decommissioning13451 July 19726 September 19796 August 2011
Würgassen1BWRBWR-69 (AEG)Shut down/in decommissioning64026 January 196811 November 197526 August 1994

Hungary

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Paks1PWRVVER-440 V-213Operational4701 August 197410 August 1983
2PWRVVER V-213Operational4731 August 197414 November 1984
3PWRVVER V-213Operational4731 October 19791 December 1986
4PWRVVER V-213Operational4711 October 19791 November 1987
5PWRVVER-1200Planned1114(2023)[63](2027)[63]
6PWRVVER-1200Planned1114(2028)[63]

India

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Bhimpur[64]1PHWRIPHWR-700Planned630
2PHWRIPHWR-700Planned630
3PHWRIPHWR-700Planned630
4PHWRIPHWR-700Planned630
Chutka[65]1PHWRIPHWR-700Planned630
2PHWRIPHWR-700Planned630
Gorakhpur1PHWRIPHWR-700Under construction630(2019)[66]
2PHWRIPHWR-700Under construction630
3PHWRIPHWR-700Planned630
4PHWRIPHWR-700Planned630
Jaitapur1PWREPRPlanned1600
2PWREPRPlanned1600
3PWREPRPlanned1600
4PWREPRPlanned1600
5PWREPRPlanned1600
6PWREPRPlanned1600
Kaiga1PHWRIPHWR-220[67]Operational2021 September 198916 November 2000
2PHWRIPHWR-220[67]Operational2021 December 198916 March 2000
3PHWRIPHWR-220[67]Operational20230 March 20026 May 2007
4PHWRIPHWR-220[67]Operational20210 May 200220 January 2011
5PHWRIPHWR-700Planned630
6PHWRIPHWR-700Planned630
Kakrapar1PHWRIPHWR-220[67]Operational2021 December 19846 May 1993
2PHWRIPHWR-220[67]Operational2021 April 19851 September 1995
3PHWRIPHWR-700[68]Under commissioning63022 November 2010(December 2022)
4PHWRIPHWR-700[68]Under construction63022 November 2010
Kudankulam1PWRVVER-1000Operational93231 March 200231 December 2014
2PWRVVER-1000Operational9324 July 200231 March 2017
3PWRVVER-1000Under construction91730 June 2017
4PWRVVER-1000Under construction91723 October 2017
5PWRVVER-1000Under construction91729 June 2021
6PWRVVER-1000Under construction91720 December 2021[69]
Madras1PHWRIPHWR-220[67]Operational2051 January 197127 January 1984
2PHWRIPHWR-220[67]Operational2051 October 197221 March 1986
Mahi Banswara1PHWRIPHWR-700Planned630
2PHWRIPHWR-700Planned630
3PHWRIPHWR-700Planned630
4PHWRIPHWR-700Planned630
Narora1PHWRIPHWR-220[67]Operational2021 December 19761 January 1991
2PHWRIPHWR-220[67]Operational2021 November 19771 July 1992
PFBR1FBRPrototypeUnder construction47023 October 2004
Rajasthan1PHWRCANDU[67]Shut down901 August 196516 December 19739 October 2004[70]
2PHWRCANDU[67]Operational1871 April 19681 April 1981
3PHWRIPHWR-220[67]Operational2021 February 19901 June 2000
4PHWRIPHWR-220[67]Operational2021 October 199023 December 2000
5PHWRIPHWR-220[67]Operational20218 September 20024 February 2010
6PHWRIPHWR-220[67]Operational20220 January 200331 March 2010
7PHWRIPHWR-700[68]Under construction63018 July 2011
8PHWRIPHWR-700[68]Under construction63030 September 2011
Tarapur1BWRBWR-1, Mark 1Operational1501 October 196428 October 1969
2BWRBWR-1, Mark 1Operational1501 October 196428 October 1969
3PHWRIPHWR-540Operational49012 May 200018 August 2006
4PHWRIPHWR-540Operational4908 March 200012 September 2005

Iran

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Bushehr1PWRVVER-1000Operational9151 May 197523 September 2013
2PWRVVER-1000Under construction91527 September 2019
3PWRVVER-1000Planned915
Darkhovin1PWRUnfinished; restart planned280

Italy

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Caorso1BWRBWR-4 Mark2Shut down8601 January 19701 December 19811 July 1990
Enrico Fermi1PWRWH 4-loopShut down/in decommissioning2601 July 19611 January 19651 July 1990
Garigliano1BWRBWR-1Shut down/in decommissioning1501 November 19591 June 19641 March 1982
Latina1GCRMagnoxShut down/in decommissioning1531 November 19581 January 19641 December 1987
Alto Lazio1BWRUnfinished9821 July 19821 January 1988
2BWRUnfinished9821 July 19821 July 1988

Japan

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Fugen1HWLWRATRShut down14810 May 197220 March 197929 March 2003
Fukushima Daiichi1BWRBWR-3Inoperable43925 July 196726 March 197119 May 2011
2BWRBWR-4Inoperable7609 June 196918 July 197419 May 2011
3BWRBWR-4Inoperable76028 December 197027 March 197619 May 2011
4BWRBWR-4Inoperable76012 February 197312 October 197819 May 2011
5BWRBWR-4Shut down76022 May 197218 April 197817 December 2013
6BWRBWR-5Shut down106726 October 197324 October 197917 December 2013
Fukushima Daini1BWRBWR-5Shut down106716 March 197620 April 198230 September 2019
2BWRBWR-5Shut down106725 May 19793 February 198430 September 2019
3BWRBWR-5Shut down106723 March 198121 June 198530 September 2019
4BWRBWR-5Shut down106728 May 198125 August 198730 September 2019
Genkai1PWRMitsubishi (2-loop)Shut down52915 September 197115 October 197527 April 2015
2PWRMitsubishi (2-loop)Shut down5291 February 197730 March 19819 April 2019
3PWRMitsubishi (4-loop)Operational11271 June 198818 March 1994
4PWRMitsubishi (4-loop)Operational[71]112715 July 199225 July 1997
Hamaoka1BWRBWR-4Shut down51510 June 197117 March 197630 January 2009
2BWRBWR-4Shut down80614 June 197429 November 197830 January 2009
3BWRBWR-5Operation suspended
(under review)[72]
105618 April 198328 August 1987
4BWRBWR-5Operation suspended
(under review)[72]
109213 October 19893 September 1993
5BWRABWROperation suspended132512 July 200018 January 2005
Higashidōri (Tōhoku)1BWRBWR-5Operation suspended
(under review)[72]
10677 November 20008 December 2005
2BWR ABWRPlanned1350
Higashidōri (Tokyo)1BWR ABWRConstruction suspended135025 January 2011
2BWR ABWRPlanned1350
Ikata1PWRMitsubishi (2-loop)Shut down5381 September 197330 September 197725 March 2016
2PWRMitsubishi (2-loop)Shut down5381 August 197819 March 198227 March 2018
3PWRMitsubishi (3-loop)Operational8461 October 199015 December 1994
Kaminoseki1BWRABWRPlanned1350
2BWRABWRPlanned1350
Kashiwazaki-Kariwa1BWRBWR-5Operation suspended10675 June 198018 September 1985
2BWRBWR-5Operation suspended106718 November 198528 September 1990
3BWRBWR-5Operation suspended10677 March 198911 August 1993
4BWRBWR-5Operation suspended10675 March 199011 August 1994
5BWRBWR-5Operation suspended106720 June 198510 April 1990
6BWRABWROperation suspended
(restart approved)[73]
13153 November 19927 November 1996
7BWRABWROperation suspended
(restart approved)[73]
13151 July 19932 July 1997
Mihama1PWRMitsubishi (2-loop)Shut down3201 February 196728 November 1970March 2015
2PWRMitsubishi (2-loop)Shut down47029 May 196825 July 1972March 2015
3PWRMitsubishi (3-loop)Operational[74]7807 August 19721 December 1976
Monju1FBRShut down24610 May 198629 August 19955 December 2017
Ōi1PWRW (4-loop)Shut down112026 October 197227 March 1979December 2017
2PWRWestinghouse (4-loop)Shut down11208 December 19725 December 1979December 2017
3PWRMitsubishi (4-loop)Operational11273 October 198718 December 1991
4PWRMitsubishi (4-loop)Operational[75]112713 June 19882 February 1993
Ōma1BWRABWRUnder construction13257 May 2010
Onagawa1BWRBWR-4Shut down4988 July 19801 June 198421 December 2018
2BWRBWR-5Operation suspended
(restart approved)[76]
79612 April 199128 July 1995
3BWRBWR-5Operation suspended79623 January 199830 January 2002
Sendai1PWRMitsubishi (3-loop)Operational84615 December 19794 July 1984
2PWRMitsubishi (3-loop)Operational84612 October 198128 November 1985
3PWRMitsubishi APWRPlanned1700
Shika1BWRBWR-5Operation suspended5051 July 198930 July 1993
2BWRABWROperation suspended
(under review)[72]
110820 August 200115 March 2006
Shimane1BWRBWR-3Shut down4392 July 197029 March 1974March 2015
2BWRBWR-5Operation suspended
(restart approved)[77]
7892 February 198510 February 1989
3BWRABWRUnder construction132512 October 2007
Takahama1PWRMitsubishi (3-loop)Operation suspended
(restart approved)[73]
78025 April 197014 November 1974
2PWRMitsubishi (3-loop)Operation suspended
(restart approved)[73]
7809 March 197114 November 1975
3PWRMitsubishi (3-loop)Operational83012 December 198017 January 1985
4PWRMitsubishi (3-loop)Operational83019 March 19815 June 1985
Tōkai1GCRMagnoxShut down1371 March 196125 July 196631 March 1998
2BWRBWR-5Operation suspended
(restart approved)[78]
10603 October 197328 November 1978
Tomari1PWRMitsubishi (2-loop)Operation suspended
(under review)[72]
55018 April 198522 June 1989
2PWRMitsubishi (2-loop)Operation suspended
(under review)[72]
55013 June 198512 April 1991
3PWRMitsubishi (3-loop)Operation suspended
(under review)[72]
86618 November 200422 December 2009
Tsuruga1BWRBWR-2Shut down34024 November 196614 March 1970March 2015
2PWRMitsubishi (4-loop)Operation suspended
(under review)[72]
11086 November 198217 February 1987
3PWRMitsubishi APWRPlanned1700
4PWRMitsubishi APWRPlanned1700

Kazakhstan

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Aktau1FBRBN-350Shut down3501 October 196416 July 197322 April 1999

Lithuania

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Ignalina1LWGRRBMK-1500Shut down/in decommissioning11851 May 19771 May 198531 December 2004
2LWGRRBMK-1500Shut down/in decommissioning11851 January 19781 December 198731 December 2009
3LWGRRBMK-1500Unfinished1185
4LWGRRBMK-1500Never built1185

Mexico

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Laguna Verde1BWRBWR-5Operational7771 October 197628 July 1990
2BWRBWR-5Operational7751 June 197710 April 1995

Netherlands

Name Unit
No.
Reactor Status Net capacity (MWe) Construction start Commercial operation Closure
TypeModel
Borssele1PWRKWU 2LPOperational4821 July 196926 October 1973(2033)
Dodewaard1BWRBWR-2Shut down551 May 196526 March 196926 March 1997

North Korea

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Yongbyon1GCRMagnox (Pu-production)Shut down51994
2LWR[79]Planned[79]30
Taechon1Unfinished2001994
Kumho1PWRUnfinished10002003
2PWRUnfinished10002003

Pakistan

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Chashma1PWRCNP-300Operational3001 August 199315 September 2000
2PWRCNP-300Operational30028 December 200518 May 2011
3PWRCNP-300Operational31528 May 20116 December 2016
4PWRCNP-300Operational31318 December 201119 September 2017
5PWRHualong OnePlanned1080
Karachi1PHWRCANDU-137 MWShut down901 August 19667 December 19721 August 2021
2PWRHualong OneOperational101423 May 201319 March 2021[80]
3PWRHualong OneOperational101431 May 201618 April 2022

Philippines

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Bataan1PWRWestinghouseUnfinished; restart planned[81]62119761986

Poland

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Żarnowiec1PWRVVER-440Unfinished44031 March 19824 September 1990
2PWRVVER-440Unfinished44031 March 19824 September 1990
3PWRVVER-440Never built4404 September 1990
4PWRVVER-440Never built4404 September 1990
Choczewo[82]1PWRAP1000Planned1250[83](2026)(2033)[82]
2PWRAP1000Planned1250(2035–2036)[82]
3PWRAP1000Planned1250(2037–2039)[82]
Pątnów[84]1PWRAPR-1400Planned1340
2PWRAPR-1400Planned1340
3PWRAPR-1400Planned1340
Włocławek1BWRBWRX-300Planned300(2030)[85]
Ostrołęka1BWRBWRX-300Planned300(2030)[85]
Warsaw1BWRBWRX-300Planned300(2030)[85]
Tarnobrzeg/Stalowa Wola1BWRBWRX-300Planned300(2030)[85]
Dąbrowa Górnicza1BWRBWRX-300Planned300(2030)[85]
Stawy Monowskie1BWRBWRX-300Planned300(2030)[85]
Kraków1BWRBWRX-300Planned300(2030)[85]

Romania

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Cernavodă1PHWRCANDU-6Operational65031 March 19832 December 1996
2PHWRCANDU-6Operational6501 July 19831 November 2007
3PHWRCANDU-6Unfinished; restart planned650
4PHWRCANDU-6Unfinished; restart planned650
5PHWRCANDU-6Unfinished650

Russia

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Akademik Lomonosov1PWRKLT-40SOperational3215 April 200719 December 2019[86]
2PWRKLT-40SOperational3215 April 200719 December 2019
Balakovo1PWRVVER-1000Operational9501 December 198023 May 1986
2PWRVVER-1000Operational9501 August 198118 January 1988
3PWRVVER-1000Operational9501 November 19828 April 1989
4PWRVVER-1000Operational9501 April 198422 December 1993
Beloyarsk1LWGRAMB-100Shut down1021 June 195826 April 19641 January 1983
2LWGRAMB-200Shut down1461 January 19621 December 19691 January 1990
3SFRBN-600Operational5601 January 19691 November 1981
4SFRBN-800Operational78918 July 200610 December 2015
5SFRBN-1200Planned1100
Bilibino1LWGREGP-6Shut down111 January 19701 April 197414 January 2019
2LWGREGP-6Operational111 January 19701 February 1975
3LWGREGP-6Operational111 January 19701 February 1976
4LWGREGP-6Operational111 January 19701 January 1977
Kalinin1PWRVVER-1000Operational9501 February 197712 June 1985
2PWRVVER-1000Operational9501 February 19823 March 1987
3PWRVVER-1000Operational9501 October 19858 November 2005
4PWRVVER-1000Operational9501 August 198625 December 2012
Kaliningrad1PWRVVER-1200Under construction
(suspended)[87]
110922 February 2012
2PWRVVER-1200Planned1109
Kola1PWRVVER-440 V-230Operational4411 May 197028 December 1973
2PWRVVER-440 V-230Operational4411 May 197021 February 1975
3PWRVVER-440 V-213Operational4411 April 19773 December 1982
4PWRVVER-440 V-213Operational4411 August 19766 December 1984
Kola II[87][88]1PWRVVER-S-600Planned600(2028)(2034)
2PWRVVER-S-600Planned600(2028)(2034)
Kostroma1PWRVVER-1200Unfinished; restart planned13001979
2PWRVVER-1200Unfinished; restart planned13001979
3PWRVVER-1200Unfinished; restart planned13001979
4PWRVVER-1200Unfinished; restart planned13001979
Kursk1LWGRRBMK-1000Shut down9251 June 197212 October 197719 December 2021
2LWGRRBMK-1000Operational9251 January 197317 August 1979
3LWGRRBMK-1000Operational9251 April 197830 March 1984
4LWGRRBMK-1000Operational9251 May 19815 February 1986
Kursk II1PWRVVER-TOIUnder construction111529 April 2018
2PWRVVER-TOIUnder construction111515 April 2019[89]
3PWRVVER-TOIPlanned1115
4PWRVVER-TOIPlanned1115
Leningrad1LWGRRBMK-1000Shut down9251 March 19701 November 197421 December 2018[90]
2LWGRRBMK-1000Shut down9251 June 197011 February 197610 November 2020
3LWGRRBMK-1000Operational9251 December 197329 June 1980
4LWGRRBMK-1000Operational9251 February 197529 August 1981
Leningrad II[91]1PWRVVER-1200Operational108525 October 200829 October 2018
2PWRVVER-1200Operational108515 April 201022 March 2021
3PWRVVER-1200Planned1085(2024)[92](2030)
4PWRVVER-1200Planned1085(2025)(2032)
MPEB No. 1[93][94][95][96] 1PWRRITM-200SUnder construction5330 August 2022[97](2027)
2PWRRITM-200SUnder construction5330 August 2022[97](2027)
MPEB No. 2 1PWRRITM-200SPlanned53(2022)(2027)
2PWRRITM-200SPlanned53(2022)(2027)
MPEB No. 31PWRRITM-200SPlanned53(2022)(2028)
2PWRRITM-200SPlanned53(2022)(2028)
MPEB No. 4 1PWRRITM-200SPlanned53(2022)(2031)
2PWRRITM-200SPlanned53(2022)(2031)
Nizhny Novgorod1PWRVVER-1200Planned1300
2PWRVVER-1200Planned1300
3PWRVVER-1200Planned1300
4PWRVVER-1200Planned1300
Novovoronezh1PWRVVER-440 V-120Shut down1971 July 195731 December 196416 February 1988
2PWRVVER-440 V-120Shut down3361 June 196414 April 197029 August 1990
3PWRVVER-440 V-179Shut down3851 July 196729 June 197225 December 2016
4PWRVVER 440 V-179Operational3851 July 196724 March 1973
5PWRVVER-1000Operational9501 March 197420 February 1981
Novovoronezh II1PWRVVER-1200Operational111424 June 200827 February 2017
2PWRVVER-1200Operational111412 July 20096 November 2019
3PWRVVER-1200Planned1175
4PWRVVER-1200Planned1175
Obninsk1LWGRAM-1Shut down51 January 19511 December 195429 April 2002
Rostov1PWRVVER-1000Operational9501 September 198125 December 2001
2PWRVVER-1000Operational9501 May 198310 December 2010
3PWRVVER-1000Operational95015 September 200927 December 2014
4PWRVVER-1000Operational101116 June 201028 September 2018
Sakha1PWRRITM-200NPlanned55(2024)[98](2028)
Seversk1FBRBREST-300Under construction2808 June 2021[99](2026)
South Urals1FBRBN-1200Unfinished; restart planned11001982
2FBRBN-1200Unfinished; restart planned11001982
3FBRBN-1200Unfinished; restart planned11001982
Smolensk1LWGRRBMK-1000Operational9251 October 197530 September 1983
2LWGRRBMK-1000Operational9251 June 19762 July 1985
3LWGRRBMK-1000Operational9251 May 198412 October 1990
Smolensk II[100][101]1PWRVVER-TOIPlanned1300
2PWRVVER-TOIPlanned1300
Tatar1PWRVVER-1200Unfinished; restart planned13001980
2PWRVVER-1200Unfinished; restart planned13001980

Slovakia

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
BohuniceA-1[102]HWGCRKS 150Decommissioned931 August 195825 December 197222 February 1977
1[103]PWRVVER-440 V-230Shut down40824 April 19721 April 198031 December 2006
2PWRVVER-440 V-230Shut down40824 April 19721 January 198131 December 2008
3PWRVVER-440 V-213Operational4721 December 197614 February 1985(2045)
4PWRVVER-440 V-213Operational4711 December 197618 December 1985(2045)
Mochovce1PWRVVER-440 V-213Operational43613 October 198329 October 1998(2058)
2PWRVVER-440 V-213Operational43613 October 198311 April 2000(2060)
3PWRVVER-440 V-213+Under commissioning44027 January 1987
4PWRVVER-440 V-213+Under construction44027 January 1987

Slovenia

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Krško1PWRWH 2 loopsOperational68830 March 19751 January 1983(2043)[104]
2PWRTBDPlanned1100(2030)[105]

South Africa

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Koeberg1PWRCP1 (France)Operational9301 July 197621 July 1984
2PWRCP1 (France)Operational9301 July 19769 November 1985

South Korea

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Hanbit1PWRWH FOperational9604 June 198125 August 1986
2PWRWH FOperational95810 December 198110 June 1987
3PWROPR-1000Operational99723 December 198931 March 1995
4PWROPR-1000Operational99726 May 19901 January 1996
5PWROPR-1000Operational99729 June 199721 May 2002
6PWROPR-1000Operational99520 November 199724 December 2002
Hanul1PWRCP1 (France)Operational96026 January 198310 September 1988
2PWRCP1 (France)Operational9625 July 198330 September 1989
3PWROPR-1000Operational99421 July 199311 August 1998
4PWROPR-1000Operational9981 November 199331 December 1999
5PWROPR-1000Operational9961 October 199929 July 2004
6PWROPR-1000Operational99629 September 200022 April 2005
Shin-Hanul1PWRAPR-1400Operational134010 July 20127 December 2022[106]
2PWRAPR-1400Under construction134019 July 2012
Kori1PWRWH 60Shut down57627 April 197229 April 197818 June 2017
2PWRWH FOperational6404 December 197725 July 1983
3PWRWH FOperational10111 October 197930 September 1985
4PWRWH FOperational10121 April 198029 April 1986
Shin-Kori1PWROPR-1000Operational99616 June 200628 February 2011
2PWROPR-1000Operational9965 June 200720 July 2012
Saeul1PWRAPR-1400Operational141616 October 200815 January 2016
2PWRAPR-1400Operational141819 August 200929 August 2019[107]
3PWRAPR-1400Under construction13401 April 2017
4PWRAPR-1400Under construction134020 September 2018
Wolsong1PHWRCANDU-6Shut down65730 October 197722 April 198324 December 2019
2PHWRCANDU-6Operational65522 June 19921 July 1997
3PHWRCANDU-6Operational68417 March 19941 July 1998
4PHWRCANDU-6Operational68822 July 19941 October 1999
Shin-Wolsong1PWROPR-1000Operational99120 November 200731 July 2012
2PWROPR-1000Operational96023 September 200826 February 2015

Spain

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Almaraz1PWRWH 3 loopsOperational10113 July 19731 September 1983
2PWRWH 3 loopsOperational10063 July 19731 July 1984
Ascó1PWRWH 3 loopsOperational99516 May 197410 December 1984
2PWRWH-3 loopsOperational9977 March 197531 March 1986
Cofrentes1BWRBWR-6Operational10649 September 197511 March 1985
José Cabrera1PWRWH 1 loopShut down/in decommissioning14124 June 196413 August 196930 April 2006
Lemoniz1PWRUnfinished19721984
2PWRUnfinished19721984
Santa María de Garoña1BWRBWR-3Shut down/in decommissioning44611 May 197115 February 19756 July 2013
Trillo1PWRKWU 3 loopsOperational100317 August 19796 August 1988
Valdecaballeros1BWRUnfinished19751984
2BWRUnfinished19751984
Vandellòs1GCRShut down/in decommissioning48019672 August 197231 July 1990
2PWRWH 3 loopsOperational104529 December 19808 March 1988

Sweden

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Ågesta1PHWRR3/Adam[108]Shut down/in decommissioning101 December 19571 May 19642 June 1974
Barsebäck1BWRASEA-ATOM Gen II[109]Shut down/in decommissioning6001 February 19711 July 197530 November 1999
2BWRASEA-ATOM Gen II[109]Shut down/in decommissioning6001 January 19731 July 197731 May 2005
Forsmark1BWRASEA-ATOM Gen III,[109] BWR-2500,[109] BWR 69[110]Operational9861 June 197310 December 1980
2BWRASEA-ATOM Gen III,[109] BWR-2500,[109] BWR 69[110]Operational11161 January 19757 July 1981
3BWRASEA-ATOM Gen IV,[109] BWR-3000,[109] BWR 75[110]Operational11671 January 197918 August 1985
Oskarshamn1BWRASEA-ATOM Gen I[109]Shut down/in decommissioning4731 August 19666 February 197219 June 2017
2BWRASEA-ATOM Gen II[109]Shut down/in decommissioning6381 September 19691 January 197522 December 2016
3BWRASEA-ATOM Gen IV,[109] BWR-3000,[109] BWR 75[111]Operational14501 May 198015 August 1985
Marviken1BHWR[108]R4/Eva[108]Almost completed; never entered service196 [108]1 April 1965 (ca)[108]27 May 1970[108]
Ringhals1BWRASEA-ATOM Gen I[109]Shut down/in decommissioning8811 February 19691 January 197631 December 2020[112]
2PWRWestinghouse 3-loops[109]Shut down/in decommissioning9041 October 19701 May 197530 December 2019
3PWRWestinghouse 3-loops[109]Operational10621 September 19729 September 1981
4PWRWestinghouse 3-loops[109]Operational11041 November 197321 November 1983

Switzerland

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure[113]
TypeModel
Beznau1PWRWH 2-loopsOperational3651 September 19651 September 1969(2029)
2PWRWH 2-loopsOperational3651 January 19681 December 1971(2031)
Gösgen1PWRKWU 3-loopsOperational10101 December 19731 November 1979
Leibstadt1BWRBWR-6Operational12201 January 197415 December 1984
Lucens1HWGCRHWGCRDecommissioned61 April 196229 December 196621 January 1969
Mühleberg1BWRBWR-4Shut down/in decommissioning3731 March 19676 November 197220 December 2019

Taiwan

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Jinshan1BWRBWR-4Shut down6362 June 197210 December 19783 October 2018
2BWRBWR-4Shut down6367 December 197315 July 19793 October 2018
Kuosheng1BWRBWR-6Shut down98519 November 197528 December 19811 July 2021[114]
2BWRBWR-6Shut down98515 March 197616 March 198315 March 2023
Lungmen1BWRABWRUnfinished135031 March 19992014
2BWRABWRUnfinished135030 August 19992014
Maanshan1PWRWH 312 3-loopOperational95121 August 197827 July 1984
2PWRWH 312 3-loopOperational95121 February 197918 May 1985

Turkey

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Akkuyu1PWRVVER-1200 V-509Under construction11143 April 2018(2023)[115]
2PWRVVER-1200 V-513Under construction11148 April 2020(2024)
3PWRVVER-1200 V-513Under construction111410 March 2021(2025)
4PWRVVER-1200 V-513Under construction111421 July 2022[116](2026)
Sinop1PWRAtmea-1Cancelled[117][118]1100
2PWRAtmea-1Cancelled1100
3PWRAtmea-1Cancelled1100
4PWRAtmea-1Cancelled1100

Ukraine

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Chernobyl1LWGRRBMK-1000Shut down/in decommissioning7401 March 197027 May 197830 November 1996
2LWGRRBMK-1000Shut down/in decommissioning9251 February 197328 May 197911 October 1991
3LWGRRBMK-1000Shut down/in decommissioning9251 March 19768 June 198215 December 2000
4LWGRRBMK-1000Destroyed9251 April 197926 March 198426 April 1986
5LWGRRBMK-1000Unfinished925
6LWGRRBMK-1000Unfinished925
Chyhyryn[119]1PWRAP1000Planned1100
2PWRAP1000Planned1100
3PWRVVER-1000Unfinished950197719 May 1989
4PWRVVER-1000Unfinished950197719 May 1989
Crimean1PWRVVER-1000Unfinished95026 January 19841987
2PWRVVER-1000Unfinished95026 January 19841987
3PWRVVER-1000Never built950
4PWRVVER-1000Never built950
Kharkiv1PWRVVER-1000Unfinished90019881990
2PWRVVER-1000Unfinished90019881990
3PWRVVER-1000Never built900
4PWRVVER-1000Never built900
Khmelnytskyi1PWRVVER-1000Operational9501 November 198113 August 1988
2PWRVVER-1000Operational9501 February 198515 December 2005
3PWRVVER-1000Under construction9501 March 1986(2026)[120]
4PWRAP1000Planned[121]11001 February 1987
5PWRVVER V-320Never built950
6PWRVVER V-320Never built950
Odesa1PWRVVER-1000Unfinished9001989
2PWRVVER-1000Unfinished9001989
Rivne1PWRVVER-440 V-213Operational3811 August 197322 September 1981
2PWRVVER-440 V-213Operational3761 October 197329 July 1982
3PWRVVER-1000Operational9501 February 198016 May 1987
4PWRVVER-1000Operational9501 August 19866 April 2006
5PWRAP1000Planned1100
6PWRVVER-1000Never built950
South Ukraine1PWRVVER-1000Operational9501 August 19762 December 1983
2PWRVVER-1000Operational9501 July 19816 April 1985
3PWRVVER-1000Operational9501 November 198429 December 1989
4PWRAP1000Planned1100
Zaporizhzhia1PWRVVER-1000Operational9501 April 198025 December 1985
2PWRVVER-1000Operational9501 January 198115 February 1986
3PWRVVER-1000Operational9501 April 19825 March 1987
4PWRVVER-1000Operational9501 April 198314 April 1988
5PWRVVER-1000Operational9501 November 198527 October 1989
6PWRVVER-1000Operational9501 June 198617 September 1996

United Arab Emirates

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Barakah1PWRAPR-1400Operational134519 July 20126 April 2021[122]
2PWRAPR-1400Operational134516 April 201324 March 2022[123]
3PWRAPR-1400Operational134524 September 201424 February 2023[124]
4PWRAPR-1400Under construction134530 July 2015

United Kingdom

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Berkeley1GCRMagnoxDecommissioned1381 January 195712 June 196231 March 1989
2GCRMagnoxDecommissioned1381 January 195720 October 196226 October 1988
Bradwell1GCRMagnoxDecommissioned1231 January 19571 July 196231 March 2002
2GCRMagnoxDecommissioned1231 January 195712 November 196230 March 2002
Bradwell B1PWRHualong OnePlanned1117
2PWRHualong OnePlanned1117
Calder Hall1GCRMagnoxShut down/in decommissioning491 August 19531 October 195631 March 2003
2GCRMagnoxShut down/in decommissioning491 August 19531 February 195731 March 2003
3GCRMagnoxShut down/in decommissioning491 August 19551 May 195831 March 2003
4GCRMagnoxShut down/in decommissioning491 August 19551 April 195931 March 2003
Chapelcross1GCRMagnoxShut down/in decommissioning481 October 19551 March 195929 June 2004
2GCRMagnoxShut down/in decommissioning481 October 19551 August 195929 June 2004
3GCRMagnoxShut down/in decommissioning481 October 19551 December 195929 June 2004
4GCRMagnoxShut down/in decommissioning481 October 19551 March 196029 June 2004
Dounreay1SFRDFRShut down/in decommissioning111 March 19551 October 19621 March 1977
2SFRPFRShut down/in decommissioning2341 January 19661 July 197631 March 1994
Dungeness AA-1GCRMagnoxShut down/in decommissioning2251 July 196028 October 196531 December 2006
A-2GCRMagnoxShut down/in decommissioning2251 July 196030 December 196531 December 2006
Dungeness BB-1GCRAGRShut down5201 October 19651 April 19857 June 2021
B-2GCRAGRShut down5201 October 19651 April 19897 June 2021
Hartlepool1GCRAGROperational5951 October 19681 April 1989(2024)
2GCRAGROperational5851 October 19681 April 1989(2024)
HeyshamA-1GCRAGROperational5851 December 19701 April 1989(2024)
A-2GCRAGROperational5751 December 19701 April 1989(2024)
B-1GCRAGROperational6101 August 19801 April 1989(2028)[125]
B-2GCRAGROperational6101 August 19801 April 1989(2028)[125]
Hinkley Point A1GCRMagnoxShut down/in decommissioning2351 November 195730 March 196523 May 2000
2GCRMagnoxShut down/in decommissioning2351 November 19575 May 196523 May 2000
Hinkley Point B1GCRAGRShut down4351 September 19672 October 19781 August 2022[126]
2GCRAGRShut down4351 September 196727 September 19766 July 2022[127]
Hinkley Point C1PWREPRUnder construction160011 December 2018(2028)
2PWREPRUnder construction160012 December 2019(2027)[128]
Hunterston A1GCRMagnoxShut down/in decommissioning1501 October 19575 February 196430 March 1990
2GCRMagnoxShut down/in decommissioning1501 October 19571 July 196431 December 1989
Hunterston B1GCRAGRShut down4601 November 19676 February 197626 November 2021
2GCRAGRShut down4601 November 196731 March 19777 January 2022[129]
Moorside1PWREPRPlanned1600
2PWREPRPlanned1600
Oldbury1GCRMagnoxShut down/in decommissioning2171 May 196231 December 196729 February 2012
2GCRMagnoxShut down/in decommissioning2171 May 196230 September 196830 June 2011
Sizewell A1GCRMagnoxShut down/in decommissioning2101 April 196125 March 196631 December 2006
2GCRMagnoxShut down/in decommissioning2101 April 196115 September 196631 December 2006
Sizewell B1PWRWH SNUPPSOperational119118 July 198822 September 1995(2035)
Sizewell C1PWREPRPlanned1600(2024)[130]
2PWREPRPlanned1600
Torness1GCRAGROperational5951 August 198025 May 1988(2028)[125]
2GCRAGROperational5951 August 19803 February 1989(2028)[125]
Trawsfynydd1GCRMagnoxShut down/in decommissioning1951 July 195924 March 19656 February 1991
2GCRMagnoxShut down/in decommissioning1951 July 195924 March 19654 February 1991
Winfrith[131]1SGHWRSGHWRShut down/in decommissioning921 May 19631 January 196811 September 1990
Wylfa1GCRMagnoxShut down/in decommissioning4901 September 19631 November 197130 December 2015
2GCRMagnoxShut down/in decommissioning4901 September 19633 January 197225 April 2012

United States

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Arkansas Nuclear One1PWRB & W (DRY-Cont)Operational8361 October 196821 May 1974
2PWRCE (DRY)Operational9886 December 19681 September 1978
Beaver Valley1PWRWH 3-loop (DRY)Operational90826 June 19702 July 1976
2PWRWH 3-loop (DRY)Operational9053 May 197414 August 1987
Big Rock Point[132]1BWRBWR-1Shut down/dismantled671 May 196029 March 196329 August 1997
Braidwood1[133]PWRWH 4-loop (DRY)Operational11941 August 197529 July 1988
2[134]PWRWH 4-loop (DRY)Operational11601 August 197517 October 1988
Browns Ferry1BWRBWR-4 (WET)Operational12001 May 19671 August 1974
2BWRBWR-4 (WET)Operational12001 May 19671 March 1975
3BWRBWR-4 (WET)Operational12101 July 19681 March 1977
Brunswick1BWRBWR-4 (WET)Operational9387 February 197018 March 1977[135]
2BWRBWR-4 (WET)Operational9327 February 19703 November 1975[136]
Byron1PWRWH 4-loop (DRY)Operational11641 April 197516 September 1985
2PWRWH 4-loop (DRY)Operational11361 April 19752 August 1987
Callaway1PWRWH 4-loop (DRY)Operational12151 September 197519 December 1984
Calvert Cliffs1PWRCE 2-loop (DRY)Operational8771 June 19688 May 1977
2PWRCE 2-loop (DRY)Operational8551 June 19681 April 1977
Carbon Free Power Project[137]1PWRNuScalePlanned77(2029–2030)
2PWRNuScalePlanned77(2029–2030)
3PWRNuScalePlanned77(2029–2030)
4PWRNuScalePlanned77(2029–2030)
5PWRNuScalePlanned77(2029–2030)
6PWRNuScalePlanned77(2029–2030)
Catawba1PWRWH 4-loop (ICECOND)Operational11601 May 197429 June 1985
2PWRWH 4-loop (ICECOND)Operational11501 May 197419 August 1986
Clinch River1BWRBWRX-300Planned180
Clinton1BWRBWR-6 (WET)Operational10621 October 197524 November 1987
Columbia1BWRBWR-5 (WET)Operational11311 August 197213 December 1984
Comanche Peak1PWRWH 4-loop (DRY)Operational120519 December 197413 August 1990
2PWRWH 4-loop (DRY)Operational119519 December 19743 August 1993
Connecticut Yankee1PWRWH (DRY)Shut down/dismantled5821 May 19641 January 19685 December 1996
Cooper1BWRBWR-4 (WET)Operational7691 June 19681 July 1974
Crystal River 31PWRB & W (DRY)Shut down86025 September 196813 March 19775 February 2013
Davis-Besse1PWRB & W (DRY)Operational8941 September 197031 July 1978
Diablo Canyon1PWRWH 4-Loop (DRY)Operational113823 April 19687 May 1985
2PWRWH 4-Loop (DRY)Operational11189 December 197013 March 1986
Donald C. Cook1PWRWH 4-Loop (ICECOND)Operational102025 March 196927 August 1975
2PWRWH 4-Loop (ICECOND)Operational109025 March 19691 July 1978
Dresden1BWRBWR-1Shut down1971 May 19564 July 196031 October 1978
2BWRBWR-3 (WET)Operational89410 January 19669 June 1970
3BWRBWR-3 (WET)Operational87914 October 196616 November 1971
Duane Arnold1BWRBWR-4 (WET)Shut down60122 May 19701 February 197510 August 2020
Edwin I. Hatch1BWRBWR-4 (WET)Operational92430 September 196831 December 1975
2BWRBWR-4 (WET)Operational9241 February 19725 September 1979
Elk River1BWRShut down/dismantled221 January 19591 July 19641 February 1968
Fermi1FBRPrototypeShut down618 August 19567 August 196629 November 1972
2BWRBWR-4 (WET)Operational111526 September 197223 January 1988
3BWRESBWRPlanned1600
Fort Calhoun1PWRCE 2-loop (WET)Shut down4827 June 1968 9 August 197324 October 2016
Fort St. Vrain1HTGRGeneral AtomicsShut down3301 September 19681 July 197929 August 1989
Ginna1PWRWH 2-loop (DRY)Operational56025 April 19661 June 1970
Grand Gulf1BWRBWR-6 (WET)Operational14014 May 19741 July 1985
H. B. Robinson1PWRWH 3-loop (DRY)Operational73513 April 19677 March 1971
Hallam1SGRAtomics InternationalShut down/dismantled751 January 19591 November 19631 September 1969
Hope Creek1BWRBWR-4 (WET)Operational11721 March 197620 December 1986
Humboldt Bay1BWRBWR-1Shut down/dismantled631 November 19601 August 19632 July 1976
Indian Point1PWRShut down2571 May 19561 October 196231 October 1974
2PWRWH 4-loop (DRY)Shut down99814 October 19661 August 197430 April 2020[138]
3PWRWH 4-loop (DRY)Shut down10301 November 196830 August 197630 April 2021[138]
James A. FitzPatrick1BWRBWR-4 (WET)Operational8131 September 196828 July 1975
Joseph M. Farley1PWRWH 3-Loop (DRY)Operational8741 October 19701 December 1977
2PWRWH 3-Loop (DRY)Operational8831 October 197030 July 1981
Kewaunee1PWRWH 2-loop (DRY)Shut down5666 August 196816 June 19747 May 2013
La Crosse1BWRBWR-1Shut down/dismantled481 March 19637 November 196930 April 1987
LaSalle County1BWRBWR-5 (WET)Operational113710 September 19731 January 1984
2BWRBWR-5 (WET)Operational114010 September 197319 October 1984
Limerick1BWRBWR-5 (WET)Operational113419 June 19741 February 1986
2BWRBWR-5 (WET)Operational113419 June 19748 January 1990
Maine Yankee1PWRWH (DRY)Shut down/dismantled8601 October 196828 December 19721 August 1997
McGuire1PWRWH 4-Loop (ICECOND)Operational11581 April 19711 December 1981
2PWRWH 4-Loop (ICECOND)Operational11581 April 19711 March 1984
Millstone1BWRBWR-3 (WET)Shut down6411 May 196628 December 197021 July 1998
2PWRCE 2-loop (DRY)Operational8691 November 196926 December 1975
3PWRWH 4-Loop (DRY)Operational12109 August 197423 April 1986
Monticello1BWRBWR-3 (WET)Operational62819 June 196730 June 1971
Naughton1SFRNatriumPlanned345
Nine Mile Point1BWRBWR-2 (WET)Operational61312 April 19651 December 1969
2BWRBWR-5 (WET)Operational12771 August 197511 March 1988
North Anna1PWRWH 3-Loop (DRY)Operational94819 February 19716 June 1978
2PWRWH 3-Loop (DRY)Operational94419 February 197114 December 1980
Oconee1PWRB & W (DRY)Operational8476 November 196715 July 1973
2PWRB & W (DRY)Operational8486 November 19679 September 1974
3PWRB & W (DRY)Operational8596 November 196716 December 1974
Oyster Creek1BWRBWR-2 (WET)Shut down61915 December 196423 December 196917 September 2018
Palisades1PWRCE 2-loop (DRY)Shut down80514 March 196731 December 197120 May 2022
Palo Verde1PWRCE80 2-loop (DRY)Operational131125 May 197628 January 1986
2PWRCE80 2-loop (DRY)Operational13141 June 197619 September 1986
3PWRCE80 2-loop (DRY)Operational13121 June 19768 January 1988
Parr1PHWRCVTRShut down/dismantled171 January 196018 December 196310 January 1967
Pathfinder1BWRBWR-1Shut down/dismantled591 January 19591 August 19661 October 1967
Peach Bottom1GCRPrototypeShut down401 February 19621 June 19661 November 1974
2BWRBWR-4 (WET)Operational130031 January 19685 July 1974
3BWRBWR-4 (WET)Operational133131 January 196823 December 1974
Perry1BWRBWR-6 (WET)Operational12401 October 197418 November 1987
Pilgrim1BWRBWR-3 (WET)Shut down67726 August 19689 December 197231 May 2019
Piqua1OCRAtomics InternationalDecommissioned121 January 19601 November 19631 January 1966
Point Beach1PWRWH 2-loop (DRY)Operational59119 July 196721 December 1970
2PWRWH 2-loop (DRY)Operational59125 July 19681 October 1972
Prairie Island1PWRWH 2-loop (DRY)Operational52225 June 196816 December 1973
2PWRWH 2-loop (DRY)Operational51925 June 196921 December 1974
Quad Cities1BWRBWR-4 (WET)Operational90815 February 196718 February 1973
2BWRBWR-4 (WET)Operational91115 February 196710 March 1973
Rancho Seco1PWRWH (DRY)Decommissioned8731 April 196917 April 197523 June 1989
River Bend1BWRBWR-6 (WET)Operational96725 March 197716 June 1986
Salem1PWRWH 4-loop (DRY)Operational116925 September 196830 June 1977
2PWRWH 4-loop (DRY)Operational115825 September 196831 October 1981
San Onofre1PWRWH (DRY)Shut down/dismantled43616 July 19641 January 196830 November 1992
2PWRCE (DRY)Shut down10701 March 19748 August 19837 June 2013
3PWRCE (DRY)Shut down11801 March 19741 April 19847 June 2013
Saxton1PWRDecommissioned31 January 1960November 1961May 1972
Seabrook Station1PWRWH 4-Loop (DRY)Operational12467 July 197615 March 1990
Sequoyah1PWRWH 4-Loop (ICECOND)Operational115227 May 19701 July 1981
2PWRWH 4-Loop (ICECOND)Operational113927 May 19701 June 1982
Shearon Harris1PWRWH 3-Loop (DRY)Operational96428 January 19782 May 1987
Shippingport1PWRWHShut down/dismantled606 September 195426 May 1958December 1989
Shoreham1BWRGEShut down8201 November 19721 August 19861 May 1989
SRE1FBRDecommissioned6.5195412 July 195715 February 1964
South Texas1PWRWH 4-loop (DRY)Operational128022 December 197525 August 1988
2PWRWH 4-loop (DRY)Operational128022 December 197519 June 1989
St. Lucie1PWRCE (DRY)Operational9811 July 19701 March 1976
2PWRCE (DRY)Operational9872 June 197710 June 1983
Surry1PWRWH 3-loop (DRY)Operational83825 June 196822 December 1972
2PWRWH 3-loop (DRY)Operational83825 June 19681 May 1973
Susquehanna1BWRBWR-5 (WET)Operational12572 November 197312 November 1982
2BWRBWR-5 (WET)Operational12572 November 197327 June 1984
Three Mile Island1PWRB & W (DRY)Shut down81918 May 19682 September 197420 September 2019
2PWRB & W (DRY)Core melt8801 November 196930 December 19781979
Trojan1PWRWH (DRY)Shut down/dismantled10951 February 197020 May 19761992
Turkey Point1PWRWH 3-loop (DRY)Operational83727 April 196714 December 1972
2PWRWH 3-loop (DRY)Operational82127 April 19677 September 1973
3PWRAP1000Planned1100
4PWRAP1000Planned1100
Vallecitos1BWRBWR-1Shut down251 January 195619 October 19579 December 1963
Vermont Yankee1BWRBWR-4 (WET)Shut down605[139]11 December 196730 November 197229 December 2014[140]
Virgil C. Summer1PWRWH 3-Loop (DRY)Operational100021 March 19731 January 1984
Vogtle1PWRWH 4-Loop (DRY)Operational11501 August 19761 June 1987
2PWRWH 4-Loop (DRY)Operational11521 August 197620 May 1989
3PWRAP1000Under commissioning111712 March 2013(2023)[141]
4PWRAP1000Under construction111719 November 2013(2023)[141]
Waterford1PWRCE 2-loop (DRY)Operational116814 November 197424 September 1985
Watts Bar1PWRWH 4-Loop (ICECOND)Operational115720 July 197327 May 1996
2PWRWH 4-Loop (ICECOND)Operational11641 September 19734 June 2016
Wolf Creek1PWRWH 4-Loop (DRY)Operational120031 May 19773 September 1985
Yankee Rowe1PWRWH (DRY)Shut down/dismantled1671 November 19571 July 19611 October 1991
Zion1PWRWH (DRY)Shut down/dismantled10401 December 196831 December 197313 February 1998
2PWRWH (DRY)Shut down/dismantled10401 December 196817 September 197413 February 1998

Uzbekistan

Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Plant in the Jizzakh Region1PWRVVER-1200Planned1200
2PWRVVER-1200Planned1200

See also

Notes and references

  1. "World Nuclear Power Reactors & Uranium Requirements". world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
  2. "PRIS – Home". pris.iaea.org.
  3. Reference Unit Power at IAEA
  4. "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 4 August 2019.
  5. "China inks $8 bln nuclear power plant deal in Argentina". Reuters. 2 February 2022. Retrieved 2 February 2022.
  6. Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
  7. "BNamericas – The Embalse Nuclear Power Plant returns to s..." BNamericas.com.
  8. "Metsamor 2 to operate until 2026 : Corporate – World Nuclear News".
  9. "Nuclear Power in Bangladesh – World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
  10. "Installation begins of outer dome at Rooppur 1". Retrieved 11 November 2022.
  11. "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". rosatom.ru.
  12. "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 September 2022. Retrieved 25 September 2022.
  13. "RTBF Info of 21 December 2018". RTBF Info. 21 December 2018. Retrieved 28 December 2018.
  14. "Work resumes at Angra 3 after seven years". 14 November 2022.
  15. "Ontario extends Pickering operations : Energy & Environment – World Nuclear News".
  16. Patel, Sonal (2 December 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection". POWER Magazine. Retrieved 5 December 2021.
  17. "Unit 2 sets record run ahead of planned maintenance outage". 6 May 2022.
  18. "Life-Extension Program & MCR Project".
  19. https://www.world-nuclear-news.org/Articles/Fuelling-to-begin-as-first-refurbished-Bruce-unit
  20. "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 November 2019.
  21. "我国自主三代核电华龙一号在海南正式开工建设". CNNC. Retrieved 2 April 2021.
  22. "China's first Hualong One nuclear reactor starts commercial operation". Reuters. 30 January 2021. Retrieved 30 January 2021.
  23. "Second Fuqing Hualong One enters commercial operation: New Nuclear – World Nuclear News".
  24. "Second AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  25. "Fourth Chinese AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 13 January 2019.
  26. "Construction starts on third Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 25 July 2022.
  27. "Construction begins of fourth Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 26 April 2023.
  28. "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 16 July 2018.
  29. "Fifth Hongyanhe unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 2 August 2021.
  30. "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 15 June 2018.
  31. "Construction of Lufeng 5 gets under way". World Nuclear News. World Nuclear Association. Retrieved 9 September 2022.
  32. "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 5 January 2021.
  33. "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". Retrieved 4 January 2022.
  34. "First AP1000 reactor enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  35. "Sanmen 2 AP1000 enters commercial operation – World Nuclear News". world-nuclear-news.org. Retrieved 7 November 2018.
  36. "PRIS – Reactor Details". pris.iaea.org. Retrieved 8 July 2022.
  37. "Construction starts on fourth Sanmen unit". world-nuclear-news.org. Retrieved 23 March 2023.
  38. "HTR-PM: Demonstration HTR-PM grid connected – World Nuclear News". Retrieved 21 December 2021.
  39. "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 August 2019.
  40. "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale". Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018.
  41. "World's second EPR starts operations". Retrieved 10 September 2019.
  42. "Fourth Tianwan unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  43. "Fifth Tianwan unit starts commercial operation". World Nuclear News. World Nuclear Association. Retrieved 9 September 2020.
  44. "Construction starts on eighth Tianwan unit: New Nuclear – World Nuclear News".
  45. "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
  46. "China starts building second CFR-600 fast reactor : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 30 December 2020.
  47. "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". ruscable.ru.
  48. "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News".
  49. "Yangjiang 5 enters commercial operation". world-nuclear-news.org. Retrieved 16 July 2018.
  50. "Construction starts on first Zhangzhou unit – World Nuclear News". world-nuclear-news.org. Retrieved 18 October 2019.
  51. "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News".
  52. "PRIS – Reactor Details".
  53. https://www.world-nuclear-news.org/Articles/Construction-begins-of-third-unit-at-Egypt-s-El-Da
  54. "Nuclear power plants in Finland". STUK. 6 April 2021. Retrieved 13 May 2022.
  55. "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022.
  56. "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022.
  57. "PRIS – Reactor Details".
  58. https://www.world-nuclear-news.org/Articles/Faulty-seals-replaced-in-Olkiluoto-EPR
  59. "Further delay to Flamanville EPR start up". World Nuclear News.
  60. "Germany shuts three of its last six nuclear plants". Retrieved 1 January 2022.
  61. "German reactor permanently shut down". world-nuclear-news.org. Retrieved 10 May 2018.
  62. "Germany shuts down Philippsburg 2". energycentral.com. Retrieved 8 January 2020.
  63. "Nuclear Power in Hungary | Hungarian Nuclear Energy – World Nuclear Association". www.world-nuclear.org. Retrieved 17 January 2022.
  64. "Government Approves 10 Sites for New Nuclear Power Projects". The New Indian Express.
  65. Indian Nuclear Power Program Archived 1 July 2012 at the Wayback Machine
  66. "Annual Report 2018-19 DAE" (PDF). Department of Atomic Energy. Retrieved 13 February 2020.
  67. "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)" (PDF).
  68. "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)" (PDF).
  69. "В Индии началось сооружение блока № 6 АЭС "Куданкулам"". ase-ec.ru (in Russian). Retrieved 21 December 2021.
  70. "PRIS – Reactor Details".
  71. "Genkai unit 4 supplying power again". world-nuclear-news.org. Retrieved 22 June 2018.
  72. "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute". genanshin.jp. Retrieved 3 October 2021.
  73. "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)". fepc.or.jp. Retrieved 8 May 2018.
  74. "40年超の美浜原発3号機が再稼働 原発事故後 全国初". NHK. Retrieved 23 June 2021.
  75. "Ohi No.4 reactor restarted- News – NHK WORLD – English". NHK WORLD. Archived from the original on 10 May 2018. Retrieved 10 May 2018.
  76. "Japan clears restart at nuclear reactor closest to epicenter of 2011 quake – Reuters". Reuters. Retrieved 27 November 2019.
  77. "First Japanese BWR cleared for restart : Regulation & Safety – World Nuclear News".
  78. "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters". Reuters. Retrieved 29 December 2019.
  79. "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
  80. "PRIS - Reactor Details".
  81. "Philippines relaunches nuclear energy programme : Nuclear Policies". World Nuclear News. 3 March 2022. Retrieved 29 April 2022.
  82. "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 October 2022.
  83. "Poland's government confirms Westinghouse for nuclear plant". 4 November 2022.
  84. "South Korea's KHNP signs letter of intent on Polish nuclear". 31 October 2022.
  85. "Taki reaktor chcą zbudować Orlen i Synthos". 18 April 2023.
  86. "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
  87. "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
  88. "Кольскую АЭС-2 начнут строить в 2028 году".
  89. "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 April 2019.
  90. "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  91. "Four New NPP Units Will be Built in Russia".
  92. "Росатом планирует начать строительство второй очереди ЛАЭС-2 в 2024 году". tass.ru. Retrieved 11 July 2022.
  93. "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 28 July 2021.
  94. ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа". Interfax.ru (in Russian). Retrieved 3 September 2021.{{cite web}}: CS1 maint: url-status (link)
  95. "Russia plans new generation of FNPPS – Nuclear Engineering International".
  96. https://rosatomnewsletter.com/wp-content/uploads/2021/12/newsletter_12_248_main.pdf
  97. "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". aem-group.ru. Retrieved 30 August 2022.
  98. "В Якутии собираются строить АЭС мощностью не менее 55 МВт".
  99. ""Росатом" начал строительство реактора Брест-300 в Северске". 8 June 2021.
  100. "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International".
  101. "VVER units planned for Leningrad and Smolensk".
  102. Shut down after a 1977 refuelling incident; decommission in progress since 1979
  103. "Tlačová agentúra Slovenskej republiky – TASR.sk". tasr.sk. Archived from the original on 20 January 2009.
  104. "Krško gets an overhaul : Corporate – World Nuclear News".
  105. "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030" [The second block of NPP Krško could provide the first megawatts after 2030.]. Točka na I (in Croatian). 30 November 2022. Retrieved 14 April 2023.
  106. "South Korean APR-1400 starts commercial operation : New Nuclear - World Nuclear News".
  107. "Second APR-1400 unit starts commercial operation". world-nuclear-news.org. Retrieved 3 September 2019.
  108. "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 31 March 2007. Retrieved 12 January 2023.
  109. "IAEA Sweden reactors". IAEA. 11 January 2023. Retrieved 12 January 2023.
  110. "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). April 2016. Retrieved 12 January 2023.
  111. "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 January 2023.
  112. "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 October 2020. Retrieved 29 December 2020.
  113. admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine, 25 May 2011
  114. "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 July 2021. Retrieved 29 April 2022.
  115. "Major components in place at Akkuyu 1 : New Nuclear". World Nuclear News. 4 March 2022. Retrieved 29 April 2022.
  116. "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News".
  117. "Japan looks to cancel Turkish project – Nuclear Engineering International".
  118. "Turkey, Japan scrap partnership in Sinop nuclear plant in Turkey's north – Turkey News".
  119. В Україні збудують нову Атомну Електростанцію
  120. "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". xaec.org.ua. 12 February 2021.
  121. "Ukraine planning for post-war nuclear power plants : New Nuclear – World Nuclear News".
  122. "UAE's first nuclear power plant begins commercial operations". Reuters. 6 April 2021. Retrieved 6 April 2021.
  123. "Barakah / Unit 2 Begins Commercial Operation at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency".
  124. "Third Barakah unit begins commercial operation : New Nuclear - World Nuclear News".
  125. "Heysham 2 and Torness end dates brought forward by EDF : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 19 January 2022.
  126. "Hinkley Point B enters retirement : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 2 August 2022.
  127. "PRIS – Reactor Details". pris.iaea.org. Retrieved 25 July 2022.
  128. "HPC 1 Building takes Shape – World Nuclear News". world-nuclear-news.org. Retrieved 12 April 2022.
  129. "Hunterston B nuclear power station retires after 46 years in service". The Guardian. 7 January 2022.
  130. "The Sizewell C project – National Infrastructure Planning". infrastructure.planninginspectorate.gov.uk. Retrieved 12 April 2022.
  131. "PRIS – Reactor Details". pris.iaea.org. Retrieved 24 January 2019.
  132. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  133. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  134. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  135. "Brunswick-1". IAEA. Retrieved 14 April 2013.
  136. "Brunswick-2". IAEA. Retrieved 14 April 2013.
  137. "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 July 2021. Retrieved 29 April 2022.
  138. "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 April 2020. Archived from the original on 3 August 2020. Retrieved 30 April 2020.
  139. "PRIS – Reactor Details".
  140. StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine, 29 December 2014
  141. "Further delay in startup of Vogtle AP1000s : New Nuclear". World Nuclear News. 18 February 2022. Retrieved 29 April 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.