Somerville Community Path

The Somerville Community Path is a paved rail trail in Somerville, Massachusetts, running 1.3 miles (2.1 km) from Massachusetts Avenue to Lowell Street via Davis Square. Opened in segments between 1985 and 2015, it follows part of the former Fitchburg Cutoff rail line. A 1.9-mile (3.1 km) extension to East Cambridge will open in 2023 as part of the Green Line Extension project.

Somerville Community Path
A paved path flanked by trees in an urban area
A typical section of the Somerville Community Path
Length1.3 miles (2.1 km)
Established1985
SurfaceAsphalt
Right of wayFitchburg Cutoff

History

The 2015-opened section in 2019

The east part of the Fitchburg Cutoff opened in 1870, connecting the Lexington and Arlington Railroad (Lexington Branch) to the Boston and Lowell Railroad. Only used for Boston and Maine Railroad freight trains after 1926, the line was abandoned as far east as Cedar Street in 1979 to allow construction of the Red Line Northwest Extension.[1] The Alewife Linear Park opened from Alewife to Davis in 1985.[2][3] The Somerville Community Path opened 0.6 miles (0.97 km) from Davis Square to Cedar Street in 1994, with the 0.4-mile (0.64 km) Massachusetts Avenue–Davis Square segment of the Alewife Linear Park becoming part of the Community Path.[2] In 2013, construction began on a 0.3-mile (0.48 km) extension to Lowell Street.[4] The $2.2 million extension opened in mid-2015, with an official dedication ceremony on August 19.[5]

In April 2014, state officials announced that a 1.9-mile (3.1 km), $39 million extension of the Community Path to East Cambridge would be built as part of the Green Line Extension (GLX) project.[4] Beginning in 2015, the state began a major re-evaluation of the GLX project due to significantly increased costs. In May 2016, the state indicated that the Community Path would only be built as far as Washington Street in the revised plan to avoid a costly bridge. In some sections, the path would be lowered to track level to eliminate costly retaining walls, resulting in fewer connections to cross streets than previously planned.[6]

A consortium called GLX Constructors was selected as the winner for re-bid project in November 2017. Their proposal reduced costs enough to add the full Community Path extension back into the plan.[7] However, the plans call for a 10-foot (3.0 m)-wide path, narrower than existing portions and the 12-foot width recommended in federal guidelines. Cycling advocates have raised concerns about safety of the narrowed path given the expected levels of bicycle traffic.[8] The GLX and path extension were expected to be completed in late 2021; with was delayed to mid-2022, then November 2022.[9][10][11] The 1,400-foot (430 m)-long bridge over the Fitchburg Line and Green Line reaches 50 feet (15 m) tall, with grades of 4.8% on the approaches.[12]

The Medford Branch opened in December 2022, but the path remained closed. Somerville signed a lease agreement with the MBTA in February 2023.[13] As of April 2023, the path is expected to open in mid-June pending resolution of remaining accessibility issues.[14]

References

  1. Karr, Ronald Dale (2010). Lost Railroads of New England (Third ed.). Branch Line Press. p. 184. ISBN 9780942147117.
  2. Moore, Alan (January 27, 2016). "CPA Proposal: 'Preservation, Rehabilitation, Restoration and Improvements to the Somerville Community Path'" (PDF). City of Somerville.
  3. "Belmont - Cambridge - Somerville Path". City of Cambridge.
  4. Powers, Martine (May 1, 2014). "Somerville bike pathway to expand". The Boston Globe.
  5. "Somerville: Community Path Extension Celebrated" (Press release). Massachusetts Department of Transportation. August 19, 2015.
  6. Green Line Extension Project Interim Project Management Team (May 9, 2016). "Report to the MBTA Fiscal and Management Control Board and the MassDOT Board of Directors" (PDF). Massachusetts Bay Transportation Authority. pp. 9, 10.
  7. "MBTA names winning bidder for Green Line extension project". Boston Globe. November 17, 2017.
  8. Vaccaro, Adam (May 13, 2019). "Somerville's getting a brand new bike path with the Green Line extension. Is it wide enough?". Boston Globe.
  9. TWO FEASIBILITY STUDIES OF REGIONAL TRAIL LINKAGE TO THE COMMUNITY PATH EXTENSION (CPX) (PDF) (Report). Friends of the Community Path. June 1, 2020. p. 9.
  10. Dolven, Taylor (June 1, 2022). "Green Line Extension to Medford was set to start service in December, then May, then this summer. Now? 'Tracking for late summer,' T says". Boston Globe.
  11. "Building A Better T: GLX Medford Branch to Open in Late November 2022; Shuttle Buses to Replace Green Line Service for Four Weeks between Government Center and Union Square beginning August 22" (Press release). Massachusetts Bay Transportation Authority. August 5, 2022.
  12. Vaccaro, Adam (September 28, 2020). "In the most complicated stretch of the Green Line extension, cyclists will rise above it all". Boston Globe.
  13. MilNeil, Christian (March 1, 2023). "Somerville Approves Community Path Lease Agreement; Opening Delayed 'Til April". Streetsblog Mass. Retrieved March 1, 2023.
  14. MilNeil, Christian (April 27, 2023). "Unresolved Accessibility Issues Push Somerville Community Path Opening to Mid-June". Streetsblog Mass. Retrieved May 3, 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.