List of tallest buildings in Charlotte
Charlotte, the largest city in the U.S. state of North Carolina, is the site of 60 completed high-rises over 200 feet (61 m), 8 of which stand taller than 500 feet (152 m).[1][2][3] The tallest building in the city is the Bank of America Corporate Center, which rises 871 feet (265 m) in Uptown Charlotte and was completed in 1992. It also stands as the tallest building in North Carolina and the 56th-tallest building in the United States.[4][5] The second-tallest skyscraper in the city is the 550 South Tryon formerly Duke Energy Center, which rises 786 feet (240 m) and was completed in 2010.[6] The Truist Center, completed in 2002 and rising 659 feet (201 m), is the third-tallest building in Charlotte.[7] Nine of the ten tallest buildings in North Carolina are located in Charlotte.[8]

The history of skyscrapers in the city began with the construction of the Independence Building in 1909. This building, rising 186 feet (57 m) and 14 floors,[9] is often regarded as the first skyscraper in Charlotte;[10] despite having been added to the Registered Historic Place in 1978, it was demolished in 1981 to allow for the construction of One Independence Center.[9] Charlotte's first building standing more than 492 feet (150 m) tall was the One South at The Plaza, completed in 1974.[11] The approved project Queensbridge Collective which is composed of two buildings will be the first buildings outside of Uptown to rise above 492 feet (150 m).[12][4][6][7][13][14][15][16] The 42 story office building and 45 story residential building are expected to start construction in May 2023.[17] There are currently eight buildings under construction that are planned to rise at least 200 feet (61 m) or at least 15 floors.[18][19][20][21][22][23] Overall, the Council on Tall Buildings and Urban Habitat ranks Charlotte's skyline (based on existing and under construction buildings over 492 feet (150 m) tall) 4th in the Southeastern United States (after Miami, Atlanta and Sunny Isles Beach), 6th in the Southern United States (after Miami, Houston, Dallas, Atlanta and Sunny Isles Beach), and 19th in the United States.[24][lower-alpha 1]
Tallest buildings
As of May 2023, there are 60 high-rises in Charlotte that stand at least 200 feet (61 m) tall, based on standard height measurement. This height includes spires and architectural details but does not include antenna masts.[lower-alpha 2][1][2][3]
Rank | Name | Image | Height ft (m) |
Floors | Year | Coordinates | Notes |
---|---|---|---|---|---|---|---|
1 | Bank of America Corporate Center | ![]() |
871 (265.5)[4] | 60 | 1992 | 35°13′38.3″N 80°50′31.6″W | It is the 237th-tallest building in the world, the 56th-tallest in the United States, the tallest building in North Carolina, the tallest building between Philadelphia and Atlanta, the tallest building constructed in Charlotte in the 1990s, and the tallest office building in the Carolinas.[43] However, it is the second largest building in Charlotte by leasable square feet, the first is the 550 South Tryon.[44] |
2 | 550 South Tryon | ![]() |
786 (239.7)[6] | 48 | 2010 | 35°13′26″N 80°50′54.7″W | 550 South Tryon is the 479th-tallest in the world, the 62nd-tallest in the United States, and the 2nd-tallest in North Carolina. It is the Tallest building constructed in Charlotte in the 2010s.[45] With 1,370,214 square feet (127,297.0 m2) of leasable space it is largest office building in Charlotte.[44] |
3 | Truist Center | ![]() |
659 (200.8)[7] | 47 | 2002 | 35°13′39.2″N 80°50′26.9″W | Truist Center is the 3rd-tallest in North Carolina. It is the tallest building constructed in Charlotte in the 2000s.[7][46] With 970,002 square feet (90,116.1 m2) of leasable space it is the 5th largest office building in Charlotte.[44] |
4 | Bank of America Tower | ![]() |
632 (192.6)[47] | 33[47] | 2019 | Bank of America Tower is the 4th-tallest in North Carolina. It is also the signature building for the Legacy Union project.[48] With 841,164 square feet (78,146.7 m2) of leasable space it is the eight largest building in Charlotte by leasable square feet.[44] | |
5 | Duke Energy Plaza | ![]() |
629 (191.7)[13] | 40 | 2022 | Duke Energy Plaza be will be leased by Duke Energy and it will become the new headquarters for Duke.[18] With 1,000,000 square feet (93,000 m2) of leasable space it is the third largest building in Charlotte.[44] | |
6 | One Wells Fargo Center | ![]() |
588 (179.2)[49] | 42 | 1988 | 35°13′25.9″N 80°50′40.3″W | One Wells Fargo Center is the 6th-tallest in North Carolina. It is the tallest building constructed in Charlotte in the 1980s.[50][51] With 994,033 square feet (92,348.7 m2) of leasable space it is the fourth largest building in Charlotte by leasable square feet.[44] |
7 | The Vue | ![]() |
576 (175.5)[14] | 50 | 2010 | 35°13′51.6″N 80°50′41.3″W | The Vue is the 7th-tallest in North Carolina and it is the tallest residential building in the Carolinas.[52] |
8 | One South at The Plaza | ![]() |
503 (153.3)[15] | 40 | 1974 | 35°13′35.8″N 80°50′35.8″W | One South at The Plaza is the 9th-tallest in North Carolina and the tallest building constructed in Charlotte in the 1970s.[11][53] With 891,136 square feet of leasable space it is the 7th largest office building in Charlotte.[54] |
9 | 1 Bank of America Center | ![]() |
484 (147.5)[55] | 32 | 2010 | 35°13′35.3″N 80°50′26.4″W | 1 Bank of America Center is the 10th-tallest in North Carolina.[55] With 746,152 square feet of leasable space, it is the 9th largest office building in Charlotte.[56] |
10 | 300 South Tryon[lower-alpha 3] | ![]() |
463 (141)[57] | 25 | 2017 | 35°13′33.6″N 80°50′46.3″W | 11th-tallest in North Carolina.[57][58] |
11 | 121 West Trade | ![]() |
462 (140.8)[59] | 32 | 1990 | 35°13′38.6″N 80°50′38.6″W | 12th-tallest in North Carolina.[59] |
12 | Three Wells Fargo Center | ![]() |
450 (137.2)[60] | 32 | 2000 | 35°13′28″N 80°50′46.7″W | 14th-tallest in North Carolina.[60] With 931,046 square feet (86,497.0 m2) of leasable space it is the sixth largest building in Charlotte.[44] |
13 | Museum Tower | ![]() |
447 (136.3)[61] | 42 | 2017 | 35°13′29.1″N 80°50′55″W | 15th-tallest in North Carolina.[lower-alpha 4][61] |
Fifth Third Center | ![]() |
447 (136.3)[62] | 30 | 1997 | 35°13′43″N 80°50′30.5″W | 15th-tallest in North Carolina.[lower-alpha 5][62][63] | |
15 | Two Wells Fargo Center | ![]() |
433 (132)[64] | 32 | 1971 | 35°13′30.9″N 80°50′42.8″W | 18th-tallest in North Carolina. With 758,508 square feet (70,467.7 m2) of leasable space it is the ninth largest building in Charlotte.[44] |
16 | Avenue | ![]() |
425 (129.5)[65] | 36 | 2007 | 35°13′44.7″N 80°50′32.3″W | 19th-tallest in North Carolina.[65] |
17 | 400 South Tryon | ![]() |
420 (128)[66] | 32 | 1974 | 35°13′29.8″N 80°50′49.6″W | 21th-tallest in North Carolina.[66] |
18 | Carillon Tower | ![]() |
394 (120.1)[67] | 24 | 1991 | 35°13′42.6″N 80°50′43.2″W | 23rd-tallest in North Carolina.[67] |
19 | Charlotte Plaza | ![]() |
388 (118.3)[68] | 27 | 1982 | 35°13′29.6″N 80°50′35.9″W | 25th-tallest in North Carolina.[68][69] |
20 | The Ellis | ![]() |
384 (117)[70] | 33 | 2021 | 549 apartment units with 19,000 square feet of retail. Completed June 2021.[71] It is one of the tallest residential towers in Charlotte.[72] | |
21 | Ally Charlotte Center | ![]() |
378 (115.2)[73] | 26 | 2021 | Construction started in December 2016. Delivered on May 3, 2021.[74][75][76][77] With 725,000 square feet (67,400 m2) of leasable space it is the eleventh largest building in Charlotte.[44] | |
22 | FNB Tower Charlotte | ![]() |
371 (113)[78] | 29 | 2021 | FNB Corporation anchored building will include 156,000 square feet of office space, 196 luxury apartments, and 2,300 square feet of retail. Ground broke in December 2018.[79] The building opened on July 21, 2021.[80] | |
23 | Lowe's Global Technology Center | ![]() |
357 (108.8)[81] | 23 | 2021 | Being constructed across from the Design Center of the Carolinas, will be anchored by Lowe's. Construction started August 2019.[20] Once completed it will become the tallest building outside of Uptown.[12] | |
24 | Catalyst | ![]() |
338 (103)[82] | 27 | 2009 | 35°13′33.5″N 80°50′53.1″W | [83] |
Ascent Uptown | ![]() |
338 (103)[84] | 33 | 2017 | 35°13′38.7″N 80°50′48.9″W | ||
26 | 525 North Tryon | ![]() |
330 (100.6)[85] | 19 | 1999 | 35°13′51.9″N 80°50′17.3″W | [86] |
27 | Honeywell Tower | ![]() |
328 (100)[87] | 23 | 2021 | Construction starting September 2019. The third building as part of the Legacy Union development.[21] | |
28 | TradeMark | ![]() |
325 (99.1)[88] | 28 | 2007 | 35°13′44.4″N 80°50′44.5″W | [89] |
29 | First Citizens Plaza | ![]() |
320 (97.5)[90] | 23 | 1987 | 35°13′36.7″N 80°50′39.3″W | [91] |
30 | The Arlington | ![]() |
310 (94.5)[92] | 24 | 2002 | 35°13′1.8″N 80°51′9.1″W | Tallest building outside of Charlotte's downtown.[93] |
Skye | ![]() |
310 (94.5)[94] | 22 | 2013 | 35°13′21.3″N 80°50′27.7″W | [95] | |
32 | One Independence Center | ![]() |
301 (91.8)[96] | 22 | 1983 | 35°13′39.9″N 80°50′34.1″W | [96][97] |
33 | 200 South College | ![]() |
300 (91.5)[98] | 22 | 1974 | 35°13′31.4″N 80°50′37.1″W | [98][99] |
AC Hotel/Residence Inn Charlotte EpiCentre | ![]() |
300 (91.5[100] | 22 | 2018 | Construction started in 2015. Completed for a spring 2018 opening.[101] | ||
35 | 200 South Tryon | ![]() |
299 (91.1)[102] | 18 | 1961 | 35°13′35.3″N 80°50′40.9″W | Tallest building constructed in Charlotte in the 1960s.[102][103] |
36 | The Westin Charlotte | ![]() |
293 (89.3)[104] | 25 | 2003 | 35°13′18.7″N 80°50′50.1″W | Largest hotel in Charlotte by number of rooms[105] |
550 South | ![]() |
293 (89.3)[106] | 20 | 2009 | 35°13′14.2″N 80°50′38.9″W | [106][107] | |
38 | The Hilton Charlotte Center City[lower-alpha 6] | ![]() |
292 (89)[108] | 22 | 1990 | 35°13′26.1″N 80°50′37.6″W | The 5th largest hotel in Charlotte by number of rooms.[105][109][110] |
Uptown 550 | ![]() |
292 (89)[111] | 21 | 2019 | 21 story apartment tower that along with a 6-story building contains 421 apartments. It was developed and owned by Northwood Ravin. The building broke ground in December 2016 and was completed in October 2019. The project cost was $82.151 million, and it sits on a 3.76-acre site in Uptown Charlotte.[112] | ||
40 | 650 S Tryon | ![]() |
291 (88.6)[113] | 18 | 2020 | Second office tower planned on the Legacy Union development site. Construction completed mid November 2020.[114] | |
41 | 112 Tryon Plaza | ![]() |
280 (85.3)[115] | 22 | 1927 | 35°13′37.3″N 80°50′37.5″W | Tallest building constructed in Charlotte in the 1920s.[115][116] |
JW Marriott Charlotte | ![]() |
280 (85.3)[117] | 22 | 2021 | Construction started in December 2018. Part of the Ally Charlotte Center. Once completed it will be the 7th largest hotel in Charlotte by number of rooms with 381 rooms.[105][22] The hotel opened August 17, 2021.[118] | ||
43 | Element Uptown[lower-alpha 6] | ![]() |
278 (84.9)[119] | 22 | 2014 | 35°13′36.2″N 80°50′56″W | 22-story 352-unit apartment tower across the street from Romare Bearden Park, developed by Childress Klein. It was sold to Bell Partners in June 2022 for $165 million.[120][121] |
44 | SkyHouse Uptown North Tower | ![]() |
264 (80.5)[122] | 24 | 2015 | 35°13′56.4″N 80°50′14.8″W | One of two twin residential towers that combined feature 672 apartments. The buildings contain studio to three-bedroom apartments with many luxury amenities. The project was developed by Novare Group, Batson-Cook Development Co, and Grubb Properties.[123][124] |
SkyHouse Uptown South Tower | ![]() |
264 (80.5) | 24 | 2017 | 35°13′54.4″N 80°50′17.6″W | One of two twin residential towers that combined feature 672 apartments. The buildings contain studio to three-bedroom apartments with many luxury amenities. The project was developed by Novare Group, Batson-Cook Development Co, and Grubb Properties.[126][127] | |
46 | Regions 615 | ![]() |
260 (79.1)[128] | 19 | 2017 | 35°13′17.5″N 80°50′53.3″W | |
47 | Charlotte Marriott City Center | ![]() |
252 (76.8)[129] | 19 | 1984 | 35°13′40.6″N 80°50′36.9″W | The Charlotte Marriott City Center was built as a part of the $120 million 101 Independence Center and hotel project developed by Henry Faison. The hotel sits on the land of the former White House Inn. Faison purchased the Marriott site in 1982 when the hotel was already vacant[130][131] The Marriott is currently the second largest hotel in Charlotte by number of rooms with 446 rooms.[105][132] |
48 | 129 West Trade | ![]() |
250 (76.2)[133] | 17 | 1958 | Tallest building constructed in Charlotte in the 1950s.[133] | |
49 | Omni Charlotte Hotel[lower-alpha 6] | ![]() |
252 (76.8)[134] | 19 | 1977 | 35°13′35.3″N 80°50′33.5″W | Currently the 7th largest hotel in Charlotte by number of rooms. It will fall to the 8th largest once the JW Marriot Charlotte is complete.[105][22][135] |
50 | Le Méridien Charlotte[lower-alpha 6] | ![]() |
238 (72.5)[136] | 18 | 1973 | 35°13′2.4″N 80°50′18.7″W | The hotel was previously part of the Blake Hotel, which had 605 rooms. In early 2015 the former hotel completed a $20 million renovation to become The Sheraton with 305 room and Le Méridien with 300. Le Méridien is the 11th largest hotel in Charlotte.[137][138][139][140][141] |
Kimpton Tryon Park[lower-alpha 6] | ![]() |
238 (72.5)[142] | 18 | 2017 | 35°13′34.4″N 80°50′47.6″W | It has 217 rooms and is ranked as the 25th largest hotel in Charlotte.[143][144][145][146] | |
Sonesta Charlotte Executive Park | ![]() |
238 (72.5)[147] | 18 | 1983 | The hotel is owned by Hospitality Properties Trust, purchased in 2017 for $44 million. It has 300 rooms and is ranked as the 11th largest hotel in Charlotte.[148][149] In 2014 a $10 million renovation was finished.[150] The renovation included upgrades to guestrooms, public areas, meeting space, the hotel restaurant, and bar.[151] | ||
53 | Novel Stonewall Station | ![]() |
230 (70.1)[152] | 19 | 2018 | $150 million mixed used development by Crescent Communities and CNM Enterprises in Uptown Charlotte. It contains 459 apartments, a 38,000 square feet (3,530 m2) Whole Foods, Home2 Suites by Hilton hotel, and 23,000 square feet (2,137 m2) of additional retail space. Retail tenants include Starbucks, Fifth Third Bank, and a high-end nail salon.[153] | |
54 | Ritz-Carlton Charlotte | ![]() |
225 (69.1)[154] | 17 | 2009 | 150 room hotel built by Bank of America for $500 million combined cost for 1 Bank of America Center and the hotel. The bank has an agreement with the hotel to cover their losses in order to keep the hotel open.[155][156] Also, bank employees will receive discounted rates.[157] | |
Johnston Building | ![]() |
225 (69.1)[158] | 17 | 1924 | |||
56 | 440 South Church | ![]() |
212 (64.7)[159] | 16 | 2009 | ||
Towerview at Ballantyne | ![]() |
212 (64.7)[160] | 16 | 2021 | Announced in October 2019 by Northwood Ravin as Ballantyne Corporate Park's first apartment tower. The 16-story building with an attached low-rise building have 212 apartments. The building was part of the early stages of Ballantyne Reimagined.[161] | ||
The Line | ![]() |
212 (64.6)[162] | 16 | 2022 | A 16-story building developed by Portman[163] on a 2.2 acre lot next to the former location of Sycamore Brewing.[164] Foundry Commercial became the first tenant of the building starting on May 16, 2022.[165] | ||
59 | Capitol Towers North | ![]() |
200 (60.9)[166] | 10 | 2017 | Developed by Charlotte based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. The towers were built as speculative buildings, with no tenants signed on prior to construction.[167][168] | |
Capitol Towers South | ![]() |
200 (60.9)[169] | 10 | 2015 | Developed by Charlotte based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. The towers were built as speculative buildings, with no tenants signed on prior to construction.[167][168] | ||
Tallest under construction
As of May 2023, there are 7 buildings under construction in Charlotte that are planned to rise at least 200 feet (61 m).[lower-alpha 7][2][3]
Name | Image | Height ft (m) |
Floors | Year | Notes |
---|---|---|---|---|---|
Radius Dilworth Overlook | ![]() |
345 (105.1)[170] | 26 | 2024 | Two apartment towers at the corner of Morehead Street and Euclid Avenue with a combined total of 626 units with 6,000 square feet (560 m2) of ground level retail.[171] The two parcels that make up the lot were purchased by Spandrel Development in December 2020 for $17.8 million.[172] The project broke ground in May 2022. The total project cost will be $235 million. The 26 story tower, Overlook, will deliver in the fourth quarter of 2024. The 8-story building, Enclave, will deliver in the first quarter of 2024.[173] |
600 South Tryon | ![]() |
318 (96.9)[174] | 24 | 2024 | The fourth office tower that is a part of the Legacy Union project. The tower will be anchored by Robinson Bradshaw, who signed a 15-year lease. Robinson Bradshaw will occupy 102,000 square feet (9,500 m2) of space over the top four floors.[175] Construction started in April 2022.[176][177] It will be a 24 story tower with 415,000 square feet (38,600 m2) total space including 20,000 square feet (1,900 m2) of ground floor retail.[178] |
Ascent South End | ![]() |
318 (96.9)[179] | 24 | 2024 | 24 story residential tower with 324 apartments and 15,000 square feet (1,400 m2) of ground floor retail. It is being developed by White Point Partners and Greystar. It is located at the corner of South Blvd and E Kingston in South End. Construction began in December 2021 and will complete in January 2024[180][181] |
2161 Hawkins | ![]() |
318 (96.9)[182] | 24[183] | 2024 | Apartment tower with 370 units along with 18,700 square feet (1,740 m2) of ground-floor retail and restaurant space. It is being built next to the current The Line construction site where Sycamore Brewing will relocate to. Construction began in October 2022 after Sycamore had their moving party October 7 - 8 2022[184] and will complete in the third quarter of 2024.[185] Foundation and frame permits were obtained in December 2022. The vertical construction of the tower began in January 2023.[186] |
110 East | ![]() |
305 (92.9)[187] | 23 | 2024 | 370,000 square feet (34,000 m2) office tower with 7,000 square feet (650 m2) of street level retail at the intersection of South Boulevard and East/West Boulevard.[188] Ground breaking occurred on January 26, 2022.[189] The Manchester, which was located directly in front of the lot, closed before construction began.[190] In February 2023 developers Stiles and Shorenstein confirmed the building is on track to deliver in March 2024.[191] |
The Howard R. Levine Center for Education | ![]() |
270 (82.2)[192] | 18 | 2024 | It will be the Wake Forest University School of Medicine main education tower containing medical school classrooms. The building will be 18 stories, 270 feet tall, with 300,000 square feet (27,871 m2). It was named after Howard Levine after he made a $25 million donation to the project. It is built as part of phase one of The Pearl medical innovation district.[193][194] The ground breaking ceremony for the building plus the 331,000 square feet (30,751 m2) research building occurred on January 17, 2023 near the intersection of Baxter and South McDowell on the 20 acre campus.[195] |
Mint & Morehead | ![]() |
226 (68.8)[196] | 17 | 2023 | A 17-story apartment building being developed by Aspen Heights Partners, located at the corner of Mint St and Morehead St in South End. It will have 393 units. The 1.4 acre lot was purchased in April 2022 for $16.3 million. Groundbreaking occurred shortly after the land sale was complete. Construction will complete in the fall of 2023.[197] |
Tallest approved pending construction
These buildings have either been approved, issued permits, or awaiting construction [198] [199][200]
Name | Height ft (m) |
Floors | Year | Notes |
---|---|---|---|---|
Queensbridge Collective Office Tower | 557 (169.7)[201] | 42[202] | 2025 | Office tower with 750,000 square feet (70,000 m2) to be developed by Riverside Investment & Development, planned on the 3 acre site of the Uptown Cabaret and Midnight Diner at 1111 S. Tryon Street. The entire project will include 2,000 parking spaces.[203][204] The development groundbreaking ceremony is scheduled for May 24, 2023. Commercial real estate market conditions will determine the office tower's start of construction. The Uptown Cabaret currently occupies the site of the tower, it will close in June.[205] |
Queensbridge Collective Residential Tower | 596 (181.6) | 45[202] | 2025 | Originally the project was planned to have two residential towers. However, due to a higher water table than expected only one residential tower will be built. This tower will 45 stories and include 400 apartments.[203][204] The development groundbreaking ceremony is scheduled for May 24, 2023. Construction on the residential tower will directly follow the ceremony.[205] |
2915 Griffith | 265 (79.2) | 20[206] | 2024 | 325,000 square feet (30,200 m2) building on a 1.7 acre lot located directly next to Suffolk Punch and across from Lynx Blue Line's New Bern Station in South End, construction will start in the second quarter of 2022 and finish in 2024.[207][208] |
The Bowl at Ballantyne Apartment Tower | 345 (105.1) | 26[209] | 2024 | A 26-story apartment tower that will have 350 units located in Ballantyne Corporate Park, it will be built in the second phase of Ballantyne Reimagined[209] |
Camden Exchange | 398 (121.3) | 30[210] | 2024 | Apartment tower with 315 units, 10,000 square feet (930 m2) of ground floor retail, and 10,000 square feet (930 m2) of office space occupied by Catalyst. It is being developed by Catalyst Capital Partners and Stiles Corp and it will be built on the former site of Price's Chicken Coop located at 1600 and 1604 Camden Road. It will break ground in 2023.[204][211][212] |
Carson & Tryon Office Building | 411 (125.2)[213] | 31[214] | 2025 | 31 story mixed use tower with 565,000 square feet (52,500 m2) of office space, 200 room hotel, 10,000 square feet (930 m2) of retail, and 200 residential units.[215][214][216] The 3-acre site is currently occupied by an Enterprise Rent-A-Car location at the corner of Carson and Tryon at 1102 S Tryon St. The developers Crescent Communities and Nuveen Real Estate paid $37 million for the four parcels from different owners that make up the site.[217][218] Construction will start in 2023[204] and complete in 2025.[214] The building will also contain 30,000 square feet (2,800 m2) of employee amenities which will include an 18,000 square feet (1,700 m2) sky terrace that have outdoor meeting space and a casual lounge. The second part of the employee amenities space will be a 12,000 square feet (1,100 m2) indoor lounge which will include a fitness center, locker rooms, wellness programming, and on-site conference and boardroom spaces.[215] |
Carson & Tryon Hotel | 265 (80.7) | 20[219] | 2025 | 200 room hotel that is a part of the development Carson & Tryon. The development also includes a 31 story mixed use tower with 565,000 square feet (52,500 m2) of office space, 10,000 square feet (930 m2) of retail, and 200 residential units.[215][214][216] The 3-acre site is currently occupied by an Enterprise Rent-A-Car location at the corner of Carson and Tryon at 1102 S Tryon St. The developers Crescent Communities and Nuveen Real Estate paid $37 million for the four parcels from different owners that make up the site[217][218] Construction will start in 2023[204] and complete in 2025.[214] |
1728 South Blvd. | 265 (80.7) | 20[220] | 2025 | Office Tower that will be a joint venture between White Point Partners, MRP Realty and Barings with 400,000 square feet (37,000 m2) of office space, ground floor retail, and a rooftop terrace. The building will be near Ascent South End. It will be built on the lot that Walgreens once occupied and the store will be built on the ground floor once complete. Construction will begin in 2023.[220] |
Southern Land Company Mixed Use Tower | 336 | 30[219] | 2025 | Mixed use tower use with 300 luxury apartments that will be built on the current site of Tyber Creek Pub. It is being developed by Southern Land Company on an acre lot at the corner of Tremont Ave and South Blvd which combines lots 1919, 1923 and 1933 South Blvd. Construction will begin by July 2023 and complete in 2025.[221][222] In March and April 2023 Southern Land Company applied with Mecklenburg County for building, footing, and foundation permits.[223] |
VeLa Uptown | 368 (112.1) | 32[224] | 2025 | 379 luxury apartments which are being developed at 200 E. Seventh St., former site of the Levine Museum of the New South. The .7 acre site at the corner of East Seventh and North College was purchased on March 13, 2022 for $10.75 million. It will also include 4,000 square feet (370 m2) of retail and 20,000 square feet (1,900 m2) of resident amenity space. The project cost is $170 million. Construction will begin in the first half of 2023 and complete in the fourth quarter of 2025.[224] |
Brooklyn Village Phase 1 Office Tower 1 | 318 (96.9) | 24 | 2026 | 24-story office tower being built as a part of the Brooklyn village development phase 1. This is 1 of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot currently occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave, which will be made up of 6 parcels. Construction will begin in February 2023 and complete in February 2026.[225] |
Brooklyn Village Phase 1 Office Tower 2 | 212 (65) | 16 | 2026 | 16-story office tower being built as a part of the Brooklyn village development phase 1. This is the second of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot currently occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave, which will be made up of 6 parcels. Construction will begin in February 2023 and complete in February 2026.[225] |
526 S. Church St | 358 | 27[226] | 2025 | Former Duke Energy headquarters that sits on a 3.86-acre lot. MRP Realty announced its intent to purchase the building in May 2022. The current 800,000 square feet (74,000 m2) building will be preserved. The plan is to add 75,000 square feet (7,000 m2) of retail space, 1,000 apartments,[227][226] and 100,000 square feet (9,300 m2) of office space. 550 apartments will be built in a 14-story addition sitting on top of the existing building.[227][226] and 450 apartments will be added by converting the current office space.[226] The redevelopment will be building 1,500,000 square feet (140,000 m2) of space and the project will cost $280 million.[226][228] Duke Energy sold the site on December 16, 2022, to MRP for $35 million.[226] Construction will start in early 2024 after Duke Energy moves out to occupy Duke Energy Plaza. The project will deliver in late 2025.[226] [229] |
205 E Bland St | 265 (80.7) | 20[230] | 2026 | Cousins Properties is planning a 200,000 square feet (19,000 m2) office building on a .9 acre parking lot. The building will also include ground-floor retail and onsite parking.[230] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lot 1401 S. Tryon St. and 200 E. Bland St.[230][231] |
1427 South Blvd | 411 (125.2) | 31[232] | 2026 | Washington, D.C. developer Akridge and Virginia-based property management company Kettler are developing a 31-story 450 unit apartment building on a .9 acre lot. The building will also include ground level retail, a resort style pool, fitness center, and co-working space. The companies purchased the lot on December 20, 2022 for $13.5 million. It is currently occupied by businesses Modern Man, Savvy Seconds Consignment, Fresh Nails, Lucky Fish and Destined To Make It.[232] |
Seventh and Tryon Office Building | 265 (80.7) | 20 | 2029[233] | 400,000 square feet (37,000 m2) office tower being built as a part of the $600 million Seventh and Tryon project. The city has just been approved $8.8 million in funding. Demolition and construction for the project will begin in the summer of 2023.[234] It will be located at N College St and E 6th St where Spirit Square is currently located.[235] Construction will happen in two phases. The office building will be in the second phase and begin construction in 2026 delivering in 2029[233] |
Phillips Place Office Tower | 250 (76.2)[236] | 10 | Mixed used building with 250,000 square feet of office space and 20,000 square feet of ground retail that will be developed by Lincoln Harris. It will be built on the 3.65 acre site that the Regal Phillips Place once occupied. [237] The movie theater's lease ran until the end of 2025. Therefore, construction of the new tower was not planned to begin until after the theater's lease expires.[238][239] If built it will be the tallest building in South Park.[240] The Regal Phillips Place closed on October 16, 2022.[241] The building was demolished in March 2023. However, Lincoln Harris has still not released a timeline for construction.[242] | |
South End Station Building 1 | 212 (64.7) | 16 | Cousins Properties is planning a two building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include multifamily, retail and office space.[231][219] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[230][231] | |
South End Station Building 2 | 212 (64.7) | 16 | Cousins Properties is planning a two building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include multifamily, retail and office space.[231][219] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[230][231] | |
Intercontinental Hotel at Belk Place | 425 (129.5)[243] | 32 | On Hold | 257 room luxury hotel, construction started in February 2018, on hold due to the covid-19 pandemic's effect on the Charlotte hotel business[244] Will become the tallest hotel in the Southern United States outside of Atlanta upon completion.[245][246] |
Timeline of tallest buildings

Since 1909, the year the first high-rise in the city was constructed,[10] the title of the tallest building in Charlotte has been held by eight high-rises.
Original name | Years as tallest | Height ft (m) |
Floors | Reference(s) |
---|---|---|---|---|
Independence Building[lower-alpha 8] | 1909–1924 (15 years) | 185 (56.3) | 14 | [9] |
Johnston Building[lower-alpha 9] | 1924–1926 (2 years) | 225 (68.58) | 17 | [247] |
112 Tryon Plaza | 1926–1961 (35 years) | 280 (85.3) | 22 | [115] |
200 South Tryon | 1961–1971 (10 years) | 299 (91.1) | 18 | [102] |
Two Wells Fargo Center | 1971–1974 (3 years) | 433 (132) | 32 | [64] |
One South at The Plaza | 1974–1988 (14 years) | 503 (153) | 40 | [15] |
One Wells Fargo Center | 1988–1991 (3 years) | 588 (179.2) | 42 | [49] |
Bank of America Corporate Center | 1991–present (32 years) | 871 (265.5) | 60 | [4] |
See also
Notes
- New York has 293 existing and under construction buildings over 492 feet (150 m),[25] Chicago has 128,[26] Miami has 56,[27] Houston has 39,[28] Los Angeles has 32,[29] San Francisco has 28,[30] Boston has 20,[31] Seattle has 20,[32] Dallas has 19,[33] Atlanta has 16,[34] Las Vegas has 15,[35] Philadelphia has 14,[36] Jersey City has 12,[37] Sunny Isles Beach has 11,[38] Pittsburgh has 10,[39] Minneapolis has 9,[40] Denver has 8,[41] Detroit has 8,[42] and Charlotte has 8.[24]
- If two or more buildings are of the same height, they are listed in order of floor count, then alphabetically. The "Year" column indicates the year in which a building was originally completed.
- Height estimated by the CTBUH.
- Along with the Fifth Third Center.
- Along with the Museum Tower.
- Height estimated by Emporis.
- Any buildings that have been topped out but are not completed are also included.
- Demolished in 1981.
- Original height unknown. 17 floors since 1929.
References
- General
- "Charlotte". The Skyscraper Center. CTBUH. Retrieved July 23, 2017.
- "Charlotte". Emporis. Archived from the original on April 8, 2015. Retrieved July 23, 2017.
- "Charlotte". Skyscraper Source Media. Retrieved July 23, 2017.
- "North Carolina Skyscraper Diagram (completed)". Skyscraper Source Media. Retrieved July 27, 2017.
- Specific
- "Charlotte (completed)". The Skyscraper Center. CTBUH. Retrieved July 22, 2017.
- "High-rise buildings in Charlotte". Emporis. Archived from the original on July 31, 2017. Retrieved July 18, 2017.
- "Skyscrapers in Charlotte". Emporis. Archived from the original on July 30, 2017. Retrieved July 30, 2017.
- "Bank of America Corporate Center". The Skyscraper Center. CTBUH. Retrieved July 13, 2017.
- "Bank of America Corporate Center". Emporis. Archived from the original on February 19, 2007. Retrieved July 13, 2017.
- "Duke Energy Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- "Hearst Tower". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- "North Carolina Skyscraper Diagram (completed)". Skyscraper Source Media. Retrieved November 20, 2017.
- "Independence Building". Emporis. Archived from the original on May 14, 2015. Retrieved July 18, 2017.
- "Charlotte High Rise Buildings". Charlotte-Mecklenburg Historic Landmarks Commission. Retrieved July 18, 2017.
- "Bank of America Plaza". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- Soloff, Katie Peralta (October 7, 2021). "6 biggest developments underway shaping South End". Axios Charlotte. Retrieved October 7, 2021.
- "Charlotte Metro Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "The Vue". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Bank of America Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- Franco, Elise (September 13, 2022). "Riverside reveals changes to Queensbridge Collective project near uptown Charlotte, South End (RENDERINGS)". Charlotte Business Journal. Retrieved March 23, 2023.
- "Big tower project on Morehead Street seems close to starting; days numbered for Uptown Cabaret?". Charlotte Ledger. March 6, 2023. Retrieved March 6, 2023.
- Fahey, Ashley (May 17, 2021). "Duke Energy to exit current HQ building in uptown after company's new tower delivers". Charlotte Business Journal. Retrieved May 17, 2021.
- Cope, Cassie (December 26, 2018). "Construction begins on 29-story uptown bank tower. It will have more than offices". Charlotte Observer. Retrieved June 11, 2021.
- Crane, Brianna (June 27, 2019). "View Renderings: Lowe's choose South End for new tech hub, moving into stunning 23-story tower". Charlotte Axios. Retrieved March 19, 2021.
- "Honeywell HQ to anchor latest office tower at Legacy Union in uptown". Charlotte Business Journal. bizjournals. Retrieved February 23, 2020.
- Thomas, Jennifer (June 18, 2020). "When JW Marriott Charlotte expects to open in uptown after hitting construction milestone". Charlotte Business Journal. Retrieved May 30, 2021.
- "Guide: The Growing Skyline in Charlotte's South End". Charlotte Magazine. November 26, 2019. Retrieved February 23, 2020.
- "Charlotte Unites States". Council on Tall Buildings and Urban Habitat. Retrieved March 23, 2023.
- "New York City (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Chicago (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Miami (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Houston (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Los Angeles (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "San Francisco (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Boston (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Seattle (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Dallas (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Atlanta (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Las Vegas (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Philadelphia (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Jersey City (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Sunny Isles Beach (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Pittsburgh (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Minneapolis (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Denver (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Detroit (completed / under construction / topped out 150m+)". The Skyscraper Center. CTBUH. Retrieved July 18, 2017.
- "Bank of America Corporate Center". Skyscraper Source Media. Retrieved July 13, 2017.
- Sharipo, Amy (October 22, 2022). "Charlotte's largest office buildings". Charlotte Business Journal. Retrieved December 24, 2022.
- "Duke Energy Center". Skyscraper Source Media. Retrieved July 14, 2017.
- "Hearst Tower". Skyscraper Source Media. Retrieved July 14, 2017.
- "Bank of America Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "620 South Tryon". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- "One Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "One Wells Fargo Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- "One Wells Fargo Center". Skyscraper Source Media. Retrieved July 14, 2017.
- "The Vue". Skyscraper Source Media. Retrieved July 14, 2017.
- "Bank of America Plaza". Skyscraper Source Media. Retrieved July 14, 2017.
- Sharpiro, Amy (October 8, 2022). "Charlotte's largest office buildings". Charlotte Business Journal. Retrieved October 9, 2021.
- "1 Bank of America Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- Sharpiro, Amy (October 8, 2022). "Charlotte's largest office buildings". Charlotte Business Journal. Retrieved October 9, 2021.
- "300 S Tryon". Council on Tall Buildings and Urban Habitat. Retrieved September 24, 2021.
- "300 South Tryon". Skyscraper Source Media. Retrieved November 20, 2017.
- "121 West Trade". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Three Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Mint Museum Apartments Tower". Skyscraper Source Media. Retrieved November 29, 2022.
- "Fifth Third Center". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
- "Fifth Third Center". Skyscraper Source Media. Retrieved July 14, 2017.
- "Two Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Avenue". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "400 South Tryon". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Carillon Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Charlotte Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Charlotte Plaza". Skyscraper Source Media. Retrieved July 15, 2017.
- "The Ellis". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- Sealey, Clayton (June 23, 2021). "Charlotte's newest residential tower is complete, with hundreds of ready-to-lease units". Charlotte Observer. Retrieved June 24, 2021.
- "Hoar Construction Completes 33-Story Ellis Apartment High-Rise in Uptown Charlotte". ReBusiness Online. June 28, 2021. Retrieved June 28, 2021.
- "Ally Charlotte Center". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
- Chemtob, Danielle (May 3, 2021). "Construction on the latest bank tower in the Charlotte skyline is now complete". Charlotte Observer. Retrieved May 5, 2021.
- "Uptown will be getting a new bank tower — Ally Charlotte Center". Agenda. Charlotte Agenda. September 21, 2017. Retrieved December 12, 2017.
- "Busy uptown intersection is closing for December to make way for a new office tower". Charlotte Observer. Ely Portillio. Retrieved December 12, 2017.
- "Uptown office tower tops out, on track to deliver in 2021". Charlotte Business Journal. bizjournals. Retrieved February 23, 2020.
- "FNB Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- Cope, Cassie (December 26, 2018). "Construction begins on 29-story uptown bank tower. It will have more than offices". Charlotte Observer. Retrieved June 11, 2021.
- Kuznitz, Allison (July 21, 2021). "The newest addition to the Charlotte skyline just opened near Bank of America Stadium". Charlotte Observer. Retrieved July 22, 2021.
- "Design Center Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Catalyst". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Catalyst". Skyscraper Source Media. Retrieved July 15, 2017.
- "Ascent Uptown". Skyscraper Source Media. Retrieved December 1, 2022.
- "525 North Tryon". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "525 North Tryon". Skyscraper Source Media. Retrieved July 15, 2017.
- "Honeywell Tower". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "333 West Trade Street". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "TradeMark". Skyscraper Source Media. Retrieved July 15, 2017.
- "First Citizens Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "First Citizens Building". Skyscraper Source Media. Retrieved July 15, 2017.
- "The Arlington". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
- "The Arlington". Skyscraper Source Media. Retrieved July 15, 2017.
- "Skye Building". Council on Tall Buildings and Urban Habitat. Retrieved December 21, 2022.
- "SKYE Condominiums". Skyscraper Source Media. Retrieved July 15, 2017.
- "101 Independence Center". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
- "101 Independence Center". Skyscraper Source Media. Retrieved July 15, 2017.
- "BB&T Center". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
- "BB&T Building". Skyscraper Source Media. Retrieved July 15, 2017.
- "AC Hotel/Residence Inn Charlotte City Center". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
- "AC Hotel/Residence Inn Charlotte EpiCentre". Emporis. Archived from the original on February 24, 2018. Retrieved July 17, 2017.
- "200 South Tryon Street". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
- "200 South Tryon". Skyscraper Source Media. Retrieved July 15, 2017.
- "The Westin Charlotte". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
- Shapiro, Amy (January 8, 2021). "Charlotte's largest hotels Ranked by No. of units or suites". Charlotte Business Journal. Retrieved May 30, 2021.
- "NASCAR Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 29, 2022.
- "NASCAR Plaza". Skyscraper Source Media. Retrieved July 15, 2017.
- "Hilton Charlotte Center City". Emporis. Archived from the original on June 30, 2021. Retrieved October 7, 2021.
- "Hilton Charlotte & Towers". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.
- "The Hilton Charlotte Center City". Skyscraper Source Media. Retrieved July 16, 2017.
- "Uptown 550 on Stonewall". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.
- "Finalist: Apartment or Condominium Development". Charlotte Business Journal. Retrieved October 16, 2022.
- "Two Legacy Union". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- Fahey, Ashley (December 10, 2020). "Developers, contractors get creative on Covid-19 challenges for construction". Charlotte Business Journal. Retrieved May 27, 2021.
- "112 Tryon Plaza". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "112 Tryon Plaza". Skyscraper Source Media. Retrieved July 16, 2017.
- "JW Marriott Charlotte". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
- Thomas, Jennifer (July 26, 2021). "Luxury hotel JW Marriott set to open in uptown Charlotte". Charlotte Business Journal. Retrieved July 27, 2021.
- "Element Uptown". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- Huguley, Collin (June 29, 2022). "Uptown Charlotte apartment complex fetches $165M in recent sale". Charlotte Business Journal. Retrieved October 16, 2022.
- "Element Uptown". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.
- "SkyHouse Uptown North Tower". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
- Fahey, Ashley (June 19, 2017). "Grand opening for second SkyHouse tower set this week". Charlotte Business Journal. Retrieved October 16, 2022.
- "SkyHouse Uptown North Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- "SkyHouse Uptown South Tower". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
- Fahey, Ashley (June 19, 2017). "Grand opening for second SkyHouse tower set this week". Charlotte Business Journal. Retrieved October 16, 2022.
- "SkyHouse Uptown South Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- "615 South College". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- "Working in The Round", The Charlotte Observer, March 3, 1982.
- M.S. Van Hecke, "Developer Delays Plans For Old Hotel", The Charlotte Observer, April 12, 1982.
- "Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.
- "129 West Trade Street". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- "Omni Charlotte Hotel". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- "Omni Charlotte Hotel". Emporis. Archived from the original on July 17, 2018. Retrieved July 17, 2017.
- "Le Meridien Charlotte". Emporis. Archived from the original on October 20, 2017. Retrieved October 7, 2021.
- Sharpiro, Amy (October 8, 2022). "Charlotte's largest hotels". Charlotte Business Journal. Retrieved January 7, 2022.
- Thomas, Jennifer (November 10, 2022). "Behind the scenes of Le Méridien's multimillion-dollar transformation (PHOTOS)". Charlotte Business Journal. Retrieved January 5, 2015.
- Boye, Will (November 10, 2022). "Charlotte's Blake Hotel to undergo $20M renovation, conversion". Charlotte Business Journal. Retrieved July 17, 2013.
- "Le Méridien Charlotte". Emporis. Archived from the original on October 20, 2017. Retrieved July 17, 2017.
- "The Blake Hotel". Skyscraper Source Media. Retrieved July 14, 2017.
- "Kimpton Tryon Park". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- Sharpiro, Amy (October 8, 2022). "Charlotte's largest hotels". Charlotte Business Journal. Retrieved January 7, 2022.
- "Klimpton Hotel". The Skyscraper Center. CTBUH. Retrieved November 20, 2017.
- "Kimpton Tryon Park". Emporis. Archived from the original on August 10, 2017. Retrieved November 20, 2017.
- Portillo, Ely (June 13, 2017). "Charlotte's newest luxury hotel opens soon, with a new name". The Charlotte Observer. Retrieved November 20, 2017.
- "Crowne Plaza Executive Park". Emporis. Archived from the original on February 27, 2021. Retrieved May 5, 2022.
- Fahey, Ashley (September 20, 2017). "Crowne Plaza Charlotte sells for $44M". Charlotte Business Journal. Retrieved May 5, 2022.
- Sharpiro, Amy (October 8, 2022). "Charlotte's largest hotels". Charlotte Business Journal. Retrieved January 7, 2022.
- Thomas, Jennifer (November 11, 2014). "Here's a look at Crowne Plaza Charlotte's $10M renovation (PHOTOS)". Charlotte Business Journal.
- "Hospitality Properties Trust Purchases 300-Room Hotel in Charlotte for $44M". Rebusiness Online. September 21, 2014.
- "Novel Stonewall Station". Council on Tall Buildings and Urban Habitat. Retrieved November 28, 2022.
- Thomas, Jennifer (October 25, 2019). "Novel project put Stonewall in play — with more to come". Charlotte Business Journal. Retrieved October 16, 2022.
- "The Ritz Carloton Charlotte". Emporis. Archived from the original on May 14, 2015. Retrieved February 23, 2022.
- Rothacker, Rick (June 1, 2010). "Reflections of Grandeur". The Charlotte Observer.
- Rothacker, Rick (June 21, 2007). "Ritz deal leaves hotel bill to BofA". The Charlotte Observer.
- Rothacker, Rick (June 22, 2007). "BofA to pay hotel bill". The Charlotte Observer.
- "Midtown Plaza". Council on Tall Buildings and Urban Habitat. Retrieved December 1, 2022.
- "Ally Center Charlotte". Emporis. Archived from the original on July 17, 2018. Retrieved February 23, 2022.
- "Towerview at Ballantyne". Emporis. Archived from the original on November 21, 2021. Retrieved February 23, 2022.
- Fahey, Ashley (October 1, 2019). "FIRST LOOK: Northwood Ravin's first Ballantyne Corporate Park apartments to include 16-story tower". Charlotte Business Journal. Retrieved October 15, 2022.
- "The Line". Emporis. Archived from the original on July 20, 2021. Retrieved March 9, 2022.
- "Guide: The Growing Skyline in Charlotte's South End". Charlotte Magazine. November 26, 2019. Retrieved February 23, 2020.
- PORTILLO, Ely (March 6, 2018). "Creative office building near prominent South End brewery goes on sale". Charlotte Observer. Retrieved December 8, 2020.
- Franco, Elise (April 22, 2022). "Foundry Commercial relocating its Charlotte office from uptown to new South End tower". Charlotte Business Journal. Retrieved April 26, 2022.
- "Capitol Towers North". Emporis. Archived from the original on December 15, 2021. Retrieved May 5, 2022.
- Boye, Will (December 19, 2014). "Lincoln Harris expects Capitol Towers building to deliver in July". Charlotte Business Journal.
- Eric Frazier, "Construction starts on SouthPark office towers", The Charlotte Observer, May 30, 2014.
- "Capitol Towers South". Emporis. Archived from the original on December 15, 2021. Retrieved May 5, 2022.
- "Radius Dilworth". Emporis. Archived from the original on May 17, 2022. Retrieved April 25, 2022.
- "26-story tower with skyline views breaks ground soon in Dilworth". Axios Charlotte. Axios Charlotte. Retrieved September 24, 2021.
- "A 26-story apartment tower is planned near Dilworth. Here's what it will include". Charlotte Business Journal. bizjournals. Retrieved May 18, 2021.
- Franco, Elise (May 17, 2022). "Spandrel Development breaks ground on $235M Radius Dilworth project with apartments, retail". Charlotte Business Journal. Retrieved May 18, 2022.
- "600 South Tryon". Emporis. Archived from the original on July 13, 2022. Retrieved July 13, 2022.
- Gordon, Rago (July 12, 2022). "First look at latest addition to Charlotte skyline, a 24-story uptown office tower". Charlotte Observer. Retrieved July 12, 2022.
- "New uptown office tower signs law firm as first tenant". WSOC-TV. May 10, 2022.
- Thomas, Jennifer (May 5, 2022). "WRobinson Bradshaw signs lease to anchor new Legacy Union tower". Charlotte Business Journal. Retrieved May 12, 2022.
- Gordon, Rago (July 12, 2022). "First look at latest addition to Charlotte skyline, a 24-story uptown office tower". Charlotte Observer. Retrieved July 12, 2022.
- "1714 South Boulevard". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.
- Huguley, Collin (June 29, 2021). "White Point Partners, Greystar reveal new details on high-rise project in South End". Charlotte Business Journal. Retrieved June 29, 2021.
- "Greystar, White Point Break Ground on Ascent South End". Cision PR Wire. March 3, 2022. Retrieved March 9, 2022.
- "2161 Hawkins Street". Emporis. Archived from the original on May 11, 2022. Retrieved May 11, 2022.
- Fahey, Ashley (May 18, 2021). "Portman Residential planning high-rise apartment tower at South End site near the Rail Trail". Charlotte Business Journal. Retrieved May 18, 2021.
- Greene, Shannon (September 28, 2022). "Sycamore Brewing's moving party postponed ahead of Hurricane Ian". Charlotte Observer. Retrieved October 20, 2022.
- Franco, Elise (September 8, 2022). "Portman to start construction next month on South End apartment tower". Charlotte Business Journal. Retrieved September 8, 2022.
- Franco, Elise (December 21, 2022). "Portman Holdings' apartment project at old Sycamore Brewing site to go vertical in early 2023". Charlotte Business Journal. Retrieved December 21, 2022.
- "110 East". Emporis. Archived from the original on October 24, 2022. Retrieved April 26, 2022.
- "RENDERINGS: Here's what South End's next office tower will look like". Charlotte Business Journal. Retrieved March 3, 2020.
- Rago, Gordon (January 18, 2022). "23-story, $186 million tower to break ground later this month in booming South End". Charlotte Observer. Retrieved January 18, 2022.
- "A gastropub and speakeasy will shutter in South End later this month". Charlotte Business Journal. Retrieved December 6, 2021.
- Franco, Elise (February 17, 2023). "Developers Shorenstein, Stiles mark construction milestone at 110 East South End office tower". Charlotte Business Journal. Retrieved February 17, 2023.
- Hudson, Caroline; O'Connell, Liz (August 24, 2021). "Atrium Health, development firm outline plans for future innovation district at med school site". Charlotte Business Journal. Retrieved October 16, 2022.
- Hudson, Caroline; O'Connell, Liz (August 24, 2021). "Atrium Health, development firm outline plans for future innovation district at med school site". Charlotte Business Journal. Retrieved October 16, 2022.
- Wilson, Jen (December 14, 2021). "Howard Levine Foundation donates $25M to support Atrium's innovation district building". Charlotte Business Journal. Retrieved October 16, 2022.
- Franco, Elise (January 17, 2023). "Medical school, innovation district break ground in midtown Charlotte (PHOTOS)". Charlotte Business Journal. Retrieved January 17, 2023.
- "Mint & Morehead". Emporis. Archived from the original on May 23, 2022. Retrieved May 17, 2022.
- Franco, Elise (April 21, 2022). "UPDATE: Texas developer bringing multifamily tower to high-profile site near Bank of America Stadium (RENDERINGS)". Charlotte Business Journal. Retrieved May 3, 2022.
- "GUIDE: The Growing Skyline in Charlotte's South End". Charlotte Magazine. November 26, 2019. Retrieved February 23, 2020.
- "How Shorenstein is mapping out its $500M real estate pipeline in Charlotte". Charlotte Business Journal. bizjournals. Retrieved February 7, 2020.
- Peralta Soloff, Katie (December 21, 2022). "The most anticipated Charlotte developments set to break ground in 2023". Axios Charlotte. Retrieved January 3, 2023.
- "Queens Bridge Collective Office Tower". Emporis. Archived from the original on May 23, 2022. Retrieved April 25, 2022.
- "Queensbridge Collective". Council on Tall Buildings and Urban Habitat. Retrieved May 18, 2023.
- Huguley, Colin (March 10, 2022). "RENDERINGS: Developer reveals new details about massive project on edge of uptown and South End". Charlotte Business Journal. Retrieved September 13, 2022.
- Peralta Soloff, Katie (December 21, 2022). "The most anticipated Charlotte developments set to break ground in 2023". Axios Charlotte. Retrieved December 21, 2022.
- Franco, Elise (May 16, 2023). "Construction set to start on first phase of Riverside's $700 million mixed-use development (RENDERINGS)". Charlotte Business Journal. Retrieved May 16, 2023.
- Fahey, Ashley (June 15, 2021). "Stream Realty Partners, The Durban Group plan mixed-use tower adjacent to The Suffolk Punch in South End". Charlotte Business Journal. Retrieved June 15, 2021.
- Lu, Yiwen (June 16, 2021). "New mixed-use tower planned next to popular South End brewery. Here's what we know". Charlotte Observer. Retrieved June 16, 2021.
- "Development Report Center City Charlotte" (PDF). Center City Partners. August 1, 2022. Retrieved October 21, 2022.
- Rago, Gordon (May 18, 2022). "See renderings of the Bowl at Ballantyne, a 20-acre project bringing a 'main street' feel". Charlotte Observer. Retrieved May 19, 2022.
- Huguley, Colin (November 16, 2021). "Catalyst Capital Partners, Stiles to develop mixed-use tower in South End". Charlotte Business Journal. Retrieved November 16, 2021.
- "Price's Chicken Coop land sold for close to $4M. Here's what's next for the site". Charlotte Observer. McClatchy. Retrieved September 2, 2022.
- "Development". Catalyst Capital Partners. Retrieved October 15, 2022.
- "Carson South End". Emporis. Archived from the original on May 14, 2022. Retrieved April 26, 2022.
- "Charlotte skyline to change again with a 31-story, $600 million tower in South End". Charlotte Observer. McClatchy. Retrieved February 23, 2022.
- Franco, Elise (November 28, 2022). "Crescent Communities, Nuveen Real Estate release new details on Carson & Tryon project in South End". Charlotte Business Journal. Retrieved November 28, 2022.
- "Carson & Tryon". Crescent Communities. Retrieved November 4, 2022.
- "Enterprise site development aims to connect South End with Uptown". Axios Charlotte. Axios. February 26, 2022. Retrieved February 28, 2022.
- Franco, Elise (June 22, 2022). "The Spectrum Cos. to manage leasing of planned South End development". Charlotte Business Journal. Retrieved November 1, 2022.
- Sealey, Clayton (February 9, 2022). "Special report: South End's booming skyline". Charlotte Ledger. Retrieved January 2, 2023.
- "Joint venture plans South End office tower to start construction in 2023". Charlotte Business Journal. bizjournals. Retrieved February 3, 2022.
- "High-rise planned at prime South End site, with Tyber Creek Pub slated for revamp". Charlotte Business Journal. bizjournals. Retrieved February 25, 2022.
- Rago, Gordon (March 10, 2023). "Apartment tower plans near Dilworth move forward. Historic landmark fate remains unsettled". Charlotte Business Journal. Retrieved March 10, 2023.
- Franco, Elise (April 6, 2023). "Southern Land Co. applies for building permits for redevelopment of high-profile South End site". Charlotte Business Journal. Retrieved April 7, 2023.
- Franco, Elise (October 19, 2022). "VeLa Development Partners lays out plans for $170M apartment tower uptown". Charlotte Business Journal. bizjournals. Retrieved October 19, 2022.
- Franco, Elise (October 12, 2022). "Brooklyn Village mixed-use project is on track to break ground in early 2023". Charlotte Business Journal. Retrieved October 19, 2022.
- Franco, Elise (December 16, 2022). "Duke Energy completes sale of two uptown properties slated for redevelopment". Charlotte Business Journal. Retrieved December 16, 2022.
- Downey, John (May 2, 2022). "Duke Energy building sales to bring apartments, hotel and shops to uptown sites". Charlotte Business Journal. Retrieved October 21, 2022.
- "Development Report Center City Charlotte" (PDF). Center City Partners. August 1, 2022. Retrieved October 21, 2022.
- Rago, Gordon (December 16, 2022). "Duke Energy finalizes sale of 1 of 2 uptown buildings, as developers plan changes". Charlotte Observer. Retrieved December 16, 2022.
- Franco, Elise (January 26, 2023). "Atlanta-based Cousins Properties to develop South End office tower at site of parking lot". Charlotte Business Journal. Retrieved January 26, 2023.
- Fahey, Ashley (December 2, 2020). "RailYard acquisition shatters office market record in $201M buy". Charlotte Business Journal. Retrieved January 26, 2023.
- Franco, Elise (January 30, 2023). "Akridge, Kettler to add 865 apartments in South End". Charlotte Business Journal. Retrieved January 30, 2023.
- Franco, Elise (April 12, 2023). "Metropolitan Partnership to start site work on Seventh and Tryon redevelopment in uptown Charlotte". Charlotte Business Journal. bizjournals. Retrieved April 12, 2023.
- Franco, Elise (June 14, 2022). "Charlotte City Council approves $8.8M reimbursement grant for Seventh and Tryon project". Charlotte Business Journal. bizjournals. Retrieved October 19, 2022.
- Boraks, David (June 18, 2020). "7th & Tryon Project Moving Forward In Charlotte -- With Affordable Housing". WFAE. Retrieved October 21, 2022.
- "Phillips Place Office Tower". Emporis. Archived from the original on May 11, 2022. Retrieved May 11, 2022.
- "Charlotte City Council approves rezoning for 10-story office tower at Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 19, 2022.
- "Lincoln Harris files plans for new office tower at Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 21, 2022.
- "Site plan filed for new office tower at SouthPark's Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 21, 2022.
- "CBJ Morning Buzz: Developer's vision includes tallest building in SouthPark; Construction academy to launch here amid national expansion". Charlotte Business Journal. bizjournals. Retrieved April 19, 2022.
- Muccigrosso, Catherine (October 15, 2022). "Regal closing south Charlotte movie theater as parent company confronts bankruptcy". Charlotte Observer. Retrieved October 19, 2022.
- Banks, Lindsey (March 1, 2023). "With movie theater demolished, center adds high-end stores and upscale restaurants; how does P.F. Chang's fit in?". Charlotte Ledger. Retrieved March 1, 2023.
- "Intercontinental Hotel at Belk Place". Emporis. Archived from the original on May 17, 2022. Retrieved May 17, 2022.
- "2 new luxury hotels set to begin construction". Agenda. Charlotte Agenda. December 7, 2017. Retrieved December 12, 2017.
- "Construction of InterContinental Hotel atop historic theater in uptown on hold". Charlotte Business Journal. bizjournals. Retrieved April 25, 2021.
- Peralta Soloff, Katie (March 13, 2021). "Charlotte hotels could be in trouble". Axios Charlotte. Retrieved July 6, 2021.
- "Johnston Building". Emporis. Archived from the original on June 13, 2021. Retrieved October 7, 2021.
External links
- Charlotte Skyscraper Diagram on SkyscraperPage