A18 autostrada (Poland)
Autostrada A18 is a short, planned motorway in southwestern Poland which is to run from the Polish/German border at Olszyna/Forst-Bademeusel (connecting with the German Bundesautobahn 15) to the Polish Autostrada A4. The highway is part of the European route E36 and the Pan-European corridor IIIA from Berlin to Wrocław.
![]() | ||||
---|---|---|---|---|
![]() | ||||
Route information | ||||
Part of ![]() | ||||
Maintained by GDDKiA | ||||
Length | 7 km (4.3 mi) 76.5 km (48 mi) planned | |||
Major junctions | ||||
From | ![]() | |||
To | ![]() | |||
Location | ||||
Country | Poland | |||
Major cities | Żary | |||
Highway system | ||||
|
As of December 2021, 7 km (4.3 mi) is opened and signed as A18. The main part (69.5 km (43.2 mi)) is undergoing an upgrade: the motorway quality northern carriageway (constructed 2004 – 2006) carries bidirectional traffic. The southern carriageway is being reconstructed, with the concrete surface from the 1930s getting demolished. The road should be opened as dual carriageway on the full length in 2023.[1]
After completion, A18 should be 76.5 km (47.5 mi) long.
Construction
.JPG.webp)
.jpg.webp)
The 1930s (the southern carriageway)
The motorway had its beginning as a single-carriageway part of Reichsautobahn 9 (Berlin-Breslau) built by Nazi Germany in the 1930s,[2] completed between 1936 and 1938. This route had all the features of an autobahn, built according to the standards of the time, including all the exits, viaducts and bridges. However, only a single carriageway was constructed along most of its length and space was left for constructing the second carriageway at a later time.
The road existed in this state until the early 1990s, when the first 17 km (11 mi) at its eastern end was rebuilt with new concrete carriageways and first signed A18 (later, in 2009, the section signed as A18 was shortened to 7 km, while the rest was re-signed as A4 when the connecting stretch of that motorway was opened[3]). In 1995, a new stretch of the second carriageway was constructed on the section near the border crossing (7 km).[4]
2004 – 2006 (the northern carriageway)
Between 2004 and 2006, the northern carriageway was constructed in the allocated space reserve[5] and most of the overpasses and bridges were reconstructed. By June 2007, the road had two carriageways in use, but the older of the two (carrying eastbound traffic towards Wrocław) was in extremely poor shape, still using the surface made of concrete slabs laid in the 1930s. Due to bad road condition, the speed on that carriageway was limited to 70 km/h.[6]
Reconstruction of the southern carriageway was originally intended to proceed shortly afterwards, but did not start due to delays caused, in part, by changes in the motorway project required by new environmental protection rules (A18 passes through Natura 2000 protected areas).[7] On 15 July 2010, the environmental decision for the revised project was issued,[8] which would have allowed for the contract bidding procedure to be completed and for construction to start in 2011. However, in December 2010, the Polish government announced significant cutbacks to its funding for road construction, which delayed the project. In 2014, when the National Program of Road Construction for 2014 – 2023 was created, the government did not envisage it starting in the near future.
2020 – 2023 (reconstruction of the southern carriageway)
In 2018, the ministry amended the National Program of Road Construction for 2014 – 2023 by including reconstruction of A18 on the primary list.
The reconstruction started in 2020 and 2021. The 1930s carriageway was then closed on the whole length and the traffic in both directions was moved onto the high quality northern carriageway. Reconstruction is intended to finish in late 2023, and the full length will then be officially designated as an Autostrada.[1]
Exits
Country | Voivodeship | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|---|
Poland | Lubusz Voivodeship | Olszyna, Lubusz Voivodeship | 0 | 0.0 | — | Germany–Poland border | ![]() ![]() | • Planned terminus of A18; road continues as Bundesautobahn 15 towards Berlin
• North-west end of DK 18 road designation • North-west end of E 36 overlap |
1 | 0.62 | — | Olszyna | local road – Trzebiel | Junction under rebuilding as part of reconstruction of southbound carriageway – temporary roundabout; starting point of temporary bidirectional traffic on northbound carriageway | |||
Królów | 9.9 | 6.2 | — | Żary Zachód | ![]() | Rebuilding completed in September 2022. [9] | ||
Drozdów, Lubusz Voivodeship | 25 | 16 | — | Żary Południe | ![]() | Rebuilding completed in September 2022. | ||
Czerna, Żagań County | 37.5 | 23.3 | — | Iłowa | ![]() | Junction under rebuilding as part of reconstruction of southbound carriageway – temporary roundabout on northbound carriageway | ||
Lower Silesian Voivodeship | Luboszów | 54 | 34 | — | Luboszów | local road – Lubań / Świętoszów | Junction under rebuilding as part of reconstruction of southbound carriageway – temporary roundabout on northbound carriageway | |
Golnice | 70.7 | 43.9 | — | Golnice | ![]() | Junction under rebuilding as part of reconstruction of southbound carriageway – temporary roundabout; end point of bidirectional traffic on northbound carriageway | ||
— | South-east end of DK 18 road designation; national road becomes motorway A18 | |||||||
Krzyżowa, Bolesławiec County | 75.5 | 46.9 | — | Krzyżowa interchange | ![]() ![]() | South-east end of E 36 overlap | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
External links
References
- "Generalna Dyrekcja Dróg Krajowych i Autostrad - Generalna Dyrekcja Dróg Krajowych i Autostrad - Portal Gov.pl".
- Listing of Reichsautobahns outside Germany's present borders, on www.autobahn-online.de website. A18 is part of the Forst - Breslau - Brieg stretch listed there.
- Table listing existing highways in Poland, from Nowe Drogi magazine website (in Polish)
- "Archived copy" (PDF). Archived from the original (PDF) on 2020-09-16. Retrieved 2020-01-26.
{{cite web}}
: CS1 maint: archived copy as title (link) - Table listing highways under construction in Poland, from Nowe Drogi magazine website (in Polish)
- Urwane koła, zgubiony na wertepach towar. Pseudoautostrada A18 Archived 2014-05-02 at the Wayback Machine wroclaw.gazeta.pl, February 26, 2014
- Natura 2000 areas map
- gorzow.rdos.gov.pl
- Gotowy pierwszy z czterech odcinków A18