Bucharest Metro Line M6

M6 is a planned metro line of the Bucharest Metro. The M6 Line will connect Bucharest North railway station (Gara de Nord) to Henri Coandă International Airport (Aeroport Otopeni). The line is expected to be completed by 2025–2030.[1][2] As of 2019, only the section from 1 Mai to Tokyo has secured funding.[3] The second section from Tokyo to the airport will be rendered separately at a later date.

Line M6
Aeroportul Otopeni
Ion I.C. Brătianu
Otopeni
Bruxelles
Paris
Washington
Tokyo
Aeroportul Băneasa
Gara Băneasa
Piața Montreal
Expoziției
Pajura
1 Mai
Grivița
Basarab
Gara de Nord

Cost

The construction of the new line is estimated to cost around €1.2 billion. The Japan Bank for International Cooperation is financing the project with €300 million.[4]

Stations

M6 Line will have a total of 12 stations: 1 station shared with the existing M4 Line and 11 planned new stations: Pajura, Expoziţiei, Piaţa Montreal, Gara Băneasa, Aeroport Băneasa, Tokyo, Washington, Paris, Bruxelles, Otopeni, Ion I.C. Brătianu, and Aeroport Otopeni.[2]

PhaseTerminalsLengthTotal stationsConstruction sinceOpening
IGara de Nord-1 Mai3.6 km (2.2 mi)419892000
II1 Mai - Tokyo6.6 km (4.1 mi)62023[5]2026 (est.)
IIIWashington - Aeroport Otopeni7.6 km (4.7 mi)6-2032[6] (est.)

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.