Bekasi Line

The Jabodebek LRT Bekasi Line (Indonesian: LRT Jabodebek Lin Bekasi) is one of the two light rail line of the Jabodebek LRT which serves trips from Dukuh Atas station to Jatimulya station. The distance traveled in this fully-elevated line is 29.54 km. The line is currently still under construction.

Bekasi Line
Construction of Halim LRT Station concourse
Overview
Other name(s)Service line 3 of LRT Jabodebek (working name)
Native nameLin Bekasi
StatusUnder construction
OwnerMinistry of Transportation
LocaleJakarta, West Java
Termini
Stations14
Service
TypeLight rail transit
SystemJabodebek LRT
Services1
Operator(s)Kereta Api Indonesia
Depot(s)Jatimulya
History
Planned opening2022 [1]
Completed2022 [1]
Technical
Line length29.54 km (18.36 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC Third rail system
Route map

Dukuh Atas
Setiabudi
Rasuna Said
Kuningan
Pancoran
Cikoko
Ciliwung
Cawang
to Harjamukti
Halim High-speed rail in Indonesia
Jatibening Baru
Cikunir 1
Cikunir 2
Bekasi Barat
Jatimulya
Jatimulya Depot

The Pancoran–Jatimulya section of the line runs along the Jakarta Inner Ring Road, Jakarta–Cikampek Toll Road, and Jakarta–Cikampek Elevated Toll Road.

Stations

Station Transfer/Notes Location
Dukuh Atas Terminus station.

Dukuh Atas BNI

Sudirman

BNI City

Koridor 1 Transjakarta (4C) Koridor 6 Transjakarta Koridor 9 Transjakarta (13C) K1-9 Dukuh Atas 1

Koridor 4 Transjakarta (L4) Koridor 6 Transjakarta K4-17 Dukuh Atas 2

South Jakarta Jakarta
Setiabudi Koridor 4 Transjakarta (4H) Koridor 6 Transjakarta Koridor 6 Transjakarta (9M) (13E) K6-17 Setiabudi Utara AINI
Rasuna Said Koridor 4 Transjakarta (4H) Koridor 6 Transjakarta Koridor 6 Transjakarta (9M) (13E) K6-14 GOR Sumantri
Kuningan Koridor 4 Transjakarta (4H) Koridor 6 Transjakarta Koridor 6 Transjakarta (9M) (13E) K6-13 Departemen Kesehatan
Pancoran (4K) Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta (9M) (13C) (13F) K9-10 Pancoran Barat
Cikoko Cawang

(4K) Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta (9M) (13F) K9-7 Cikoko Stasiun Cawang

Ciliwung (4K) Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta (9M) (13F) K9-6 Cawang Ciliwung East Jakarta
Cawang Planned interchange station to

(4K) Koridor 5 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta (L7) Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta (9M) K7-10 Cawang BNN

Halim  HSR  Halim (U/C)

Halim (Planned)

Jatibening Baru Bekasi West Java
Cikunir I
Cikunir II
Bekasi Barat  TP1   TP3  Revo Town (westward only)
Bekasi Timur Terminus station.

 TP1  Pos Polisi Bekasi Timur (westward only)

Bekasi Regency

References

  1. "Proyek LRT Jabodebek Molor ke 2022" (in Indonesian). 5 June 2020. Retrieved 27 June 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.