Putrajaya line
The MRT Putrajaya Line (PYL), also known as MRT 2, is the second Mass Rapid Transit (MRT) line in Klang Valley, Malaysia, and the third fully automated and driverless rail system in the country. It was previously known as the MRT Sungai Buloh–Serdang–Putrajaya Line (SSP Line). The line stretches from Kwasa Damansara to Putrajaya and runs through densely populated areas such as Sri Damansara, Kepong, Batu, Jalan Ipoh, Sentul, Kampung Baru, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya.
Putrajaya Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() Hyundai Rotem EMU rolling stock entering Kampung Batu station. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | MRT 2, MRT Line 2, PY Line, PYL | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | MRT Laluan Putrajaya | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | MRT Corp | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | 12 (yellow) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Klang Valley | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 36 and 5 reserved[1][Note 1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | myrapid | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | ![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | Kwasa Damansara–Putrajaya Sentral | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Rapid Rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Sungai Buloh Depot Serdang Depot | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 49 Hyundai Rotem four-car trainsets (wide profile) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | Phase 1: 16 June 2022 Kwasa Damansara PY01 – Kampung Batu PY13 Phase 2: 16 March 2023 Kentonmen PY14 – Putrajaya Sentral PY41 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 57.7 km (35.9 mi)[2] Elevated: 44.2 km (27.5 mi) Underground: 13.5 km (8.4 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Conduction system | Automated and driverless | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 100 km/h (62 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Phase 1 operations of the line between Kwasa Damansara and Kampung Batu commenced on 16 June 2022.[3] While the Phase 2 which covers the remaining of the line including the underground stretch was opened on 16 March 2023.[4]
The line is numbered 12 and coloured yellow on official transit maps.
The line was developed and is owned by MRT Corp but operated as part of the Rapid KL network by Rapid Rail. It also forms part of the Klang Valley Integrated Transit System.
The line, totalling 57.7 km (35 miles 68 chains) in length, includes 5.5 km (3.4 mi) annexed from the MRT Kajang Line, making it the longest metro line in Malaysia. The line includes a 13.5 km (8.4 mi) underground section. A total of 37 stations, 11 of them underground, were built.
Route
The MRT starts in Kwasa Damansara where it annexed the section from here to Sungai Buloh from the MRT Kajang Line. From Sungai Buloh, the line runs parallel with the KTM Komuter line to Kepong Sentral/Sri Damansara Timur. However, there are a few stations the MRT line between the two which is not served by the KTM.
The MRT then continues towards the towns of Kepong and Jinjang. As of the first phase, the Putrajaya line ends at Kampung Batu. At Jalan Ipoh, the line starts going underground while Jalan Ipoh itself being the only station on the network to be half-sunken/sub-surface. The line carries under the Ipoh Road to Titiwangsa which will interchange with the LRT Ampang/Sri Petaling and KL Monorail lines. The line then runs under the Hospital Kuala Lumpur and meets the connecting station to LRT Kelana Jaya line (also underground) at Ampang Park. Persiaran KLCC serves as a second station in the KLCC subdistrict, itself also served by the LRT Kelana Jaya Line. The line continues to Tun Razak Exchange, interchanging with the Kajang line. The Putrajaya Line reunites with the Ampang/Sri Petaling line at Chan Sow Lin.
After thru provisional Bandar Malaysia North and South stations, the MRT Putrajaya line resurfaces at Kuchai. Once again, the line meets with the LRT Sri Petaling line at Sungai Besi,[5] then continuing to serve Serdang. Following this, the line briefly parallels KTM and KLIA Transit (airport express) until Serdang Raya Selatan, and veers off to Universiti Putra Malaysia and the Seri Kembangan subdistrict. The MRT line then enters Sepang constituency, having 3 stops including two in Cyberjaya, before ending at Putrajaya Sentral, where it interchanges with KLIA Transit. The station may be integrated with the proposed Putrajaya Monorail in the future. Putrajaya Sentral will also be the southernmost station under the Rapid KL rail network.[6]
Chronology


.jpg.webp)
.jpg.webp)
- 13 October 2014 – The 2nd MRT line is now planned to be from Sungai Buloh, Selayang to Pandan;[7] instead of from Kuala Lumpur to Port Klang.[8][9][10]
- 3 December 2014 – During a briefing of the 1st MRT line, the MRT CEO revealed more details about the 2nd line. He had said that the line will be 59.5 km (37.0 mi) long with 49.3 km (30.6 mi) will be elevated and 10.2 km (6.3 mi) will be underground. There will be 40 stations where 31 will be elevated and 9 will be underground. Construction is expected to begin by November 2015 will approval and public discussion starts in early 2015.[11][12]
- 12 February 2015 – MRT Corp prepares tender for MRT2, project display in Q2.[13]
- 16 March 2015 – MRT2 from Sungai Buloh to Putrajaya has been approved by the Federal government.[14] The project was allocated RM23 billion in the Budget 2015.[15]
- 2 April 2015 – New alignment for MRT2 proposed.[16] The alignment south of Tun Razak Exchange was then altered drastically to provide connectivity with the proposed High Speed Rail project. With this revision, the line stands at 52.2 km (32.4 mi) long with a total of 36 stations. Of these, 11 are underground while 25 are elevated.
- 22 April 2015 – Department of Environment (DOE)'s Detailed Environment Impact Assessment (DEIA) for the MRT2 is available for download from their website.
- 14 May 2015 – Details of MRT2 project on public display start on 15 May 2015. The public can visit the SPAD office, MRT Corp offices, Kuala Lumpur City Hall, Selayang Municipal Council and Petaling Jaya City Council, with roadshows, primarily at shopping malls near the MRT2 alignment.[17]
- 12 August 2016 – On the MRT2 project, the groundbreaking ceremony was expected to be held at end of the month of August 2016 or early September 2016.[18]
- 15 September 2016 – Construction on the MRT line launched with a groundbreaking ceremony at the site of the future Putrajaya Sentral MRT station by former Prime Minister Dato' Seri Najib Tun Razak.[19][20]
- 31 March 2017 – The line is 5.3% completed.[21]
- 24 May 2017 – 7.5% of the line was completed. For the elevated section, progress of the first and second packages are at 20.9% and 10.3% respectively with increased works being seen from Jalan Kuala Selangor to Jalan Kepong. Whereas for underground works, the work progress was at 8.7%.[22]
- June 2017 – The line is 10.25% completed, based on the video released by MRT Corp on 18 December 2017.
- 5 September 2017 – The line has reached the completion of 12.05% and expected to reach 19% by the end of 2017. The underground works will commence by the first quarter of 2018 with the arrival of 2 Tunnel Boring Machine (TBMs) within 2–3 weeks and another 2 of them by early next year.[23][24]
- 26 September 2017 – The project director Datuk Amiruddin Ma’aris mentioned the line is currently achieved completion of 13.70%.[25]
- 28 September 2017 – According to the MRT Corp director of underground works for the MRT line, Blaise Mark Pearce, 23% of the underground works for the MRT line were expected to be completed by the end of 2017.[26]
- 10 October 2017 – An explosion has occurred at the Mass Rapid Transit (MRT) station construction site in Bandar Malaysia. According to the police, it was believed that the explosion happened because of an old unexploded bomb from the Second World War through the initial investigation. Three Bangladesh workers were seriously injured and two of them lost their legs while another suffered injuries on the hands and legs.[27]
- 13 October 2017 – Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) has won the prestigious “Be Inspired Awards 2017” for its use of Building Information Modelling (BIM) in the construction of the MRT line.[28]
- 13 November 2017 – The first Tunnel Boring Machine arrived in Port Klang and delivered to site. The rest are expected to arrive in coming weeks.[29]
- 18 December 2017 – MRT Corp released a video describing the progress of the MRT line from 2016 to 2017 in YouTube. The progress is described in packages. The progress statistics are: 23.68%, 15.43%, 9.05%, 10.32%, 35.31% and 11.51% respectively for packages V201, V202, V203, V210, Serdang Depot and underground.[30]
- 1 January 2018 – Malaysia's 1st shopping mall, Ampang Park, is officially ceased its operation in order to make way to the construction of the Ampang Park station under such line.
- 18 February 2018 – The line has achieved 21% completion. The final Tunnel Boring Machine for the MRT line is expected to be launched by mid-2019.[31]
- 1 March 2018 – Underground works commenced with the first Tunnel Boring Machine. The launching is done at the shaft located at the Bandar Malaysia North MRT station. The line has achieved 22% completion according to the CEO of the MRT Corp, Datuk Seri Shahril Mokhtar.[32]
- 3 March 2018 – A construction worker died while two others survived when a launching gantry at an MRT construction site in Jalan Jinjang (Work Package V203), collapsed at around 11:40pm.[33]
- 23 April 2018 – The Director of Strategic Communications and Stakeholder Relations from MRT Corp, Dato' Najmuddin Abdullah, says the line is now completed at the progress of more than 24%.[34]
- June 2018 – The line is 30% completed, based on the video released by MRT Corp on 9 December 2018.
- 11 July 2018 – The line was close to 30% complete as at early July, according to the project director Datuk Amiruddin Ma’aris.[35]
- 8 October 2018 – The Finance Minister, Lim Guan Eng announced the decision to change the project structure as well as terminate the contract from MMC-Gamuda and re-tender the unfinished underground portion of the project by an open tender process, due to the fact the Federal Government and MMC-Gamuda have failed to reach an agreement relating to the underground portion of the construction project. This decision had caused a lot of protests from MMC-Gamuda and workers due to the fact that some 20,000 workers tend to lose their job.[36][37]
- 9 October 2018 – The shares of MMC and Gamuda fell due to the government's decision to terminate the underground section project.[38]
- 10 October 2018 – The Prime Minister, Tun Dr. Mahathir Mohamad told the press that the decision to cancel the contract from MMC-Gamuda for the underground portion will be reconsidered.[39]
- 11 October 2018 – The Economic Affairs' Minister, Dato' Seri Azmin Ali confirmed that the Cabinet has set up a committee to review the underground contract that was awarded to MMC-Gamuda for the project. According to the source, the four members of the committee are Minister of Finance Lim Guan Eng, Minister of Works Baru Bian, Transport Minister Anthony Loke and Economic Affairs Minister Azmin Ali.[40]
- 17 October 2018 – The Finance Minister, Lim Guan Eng said the decision to terminate the contract was Cabinet's decision.[37]
- 26 October 2018 – Due to budget concerns, and a re-tender, construction costs proposed by MMC-Gamuda is about half what it was previously. The two Bandar Malaysia Stations have also been cancelled. The cost for construction of the underground portion is now RM13.11 billion. This brought to the entire cost for this project to be RM30.53 billion from the RM39.35 billion previously. This means MMC-Gamuda now secured the contract of the underground section and allowed to continue the construction.[41][42]
- 13 November 2018 – Three MRT stations from the MRT Kajang Line (Sungai Buloh, Kampung Selamat and Kwasa Damansara) closed for two days to accommodate the first migration system works of the line.
- 9 December 2018 – MRT Corp released another video describing the progress of the MRT line from 2017 to 2018 in YouTube. The progress is described in packages. The progress for all packages have been mentioned. Package V201 achieved the highest progress with 45.7% whilst package V206 achieve the lowest progress with 13.1%. Underground section had the progress with 33.3%.[43]
- 24 January 2019 – The first batch of carriages for the two sets of trains have arrived at Westport, Port Klang.
- 29 January 2019 – First TBM breakthrough happened at Chan Sow Lin station. The TBM was bored between Bandar Malaysia North and Chan Sow Lin. MRT Corp Sdn Bhd strategic communications and stakeholder relations director, Datuk Najmuddin Abdullah said the overall construction was on track with a 41% completion rate as of December 2018.[44]
- 9 March 2019 – Three MRT stations from the MRT Kajang Line (Sungai Buloh, Kampung Selamat and Kwasa Damansara) closed again for two days to accommodate the second migration system works of the line.[45]
- 15 March 2019 – Second TBM breakthrough at Chan Sow Lin station based on the Instagram source from Datuk Najmuddin Abdullah.[46]
- 15 March 2019 – Ninth and final TBM breakthrough of the year at Ampang Park station.[47]
- 17 January 2020 – MRT is 70% completed with expected completion date for Phase 2 delayed to January 2023.[48]
- 31 October 2020 – MRT Putrajaya Line construction is 82.51% completed. Phase One from the Kwasa Damansara to the Kampung Batu will begin operations in July 2021, while the rest of the line from the Kampung Batu Station to the Putrajaya Sentral will be operational under Phase Two in January 2023.
- 3 April 2021 – The Construction progress of Phase One section of the MRT Putrajaya Line (Kwasa Damansara – Kampung Batu) is at 97% and will begin operations in August 2021.[49]
- 7 July 2021 - MRT Corp decided to postpone the opening of phase 1 from August to mid-November 2021 due to the COVID-19 movement control order in Malaysia.[50]
- 16 November 2021 - MRT Corp announced that Phase 1 opening will be delayed again to the second quarter of 2022 as further tests are required. No exact date was provided.
- 2 December 2021 - MMC-Gamuda won Major Project of the Year award from International Tunnelling and Underground Space Association (ITA) for projects above 500 million euros. They managed to beat out the Ismailia Tunnels project under the Suez Canal, Egypt and Shantou Bay Tunnel project from China.[51]
- 6 December 2021 - MMC Gamuda also bagged the International Project of the Year at the Ground Engineering Awards 2021 in London.[51]
- 20 March 2022 - MRT Corp is currently looking at June 2022 as the possible opening date of Phase 1 operations. It has also said that the opening date depends on the results from the test runs.[3]
- 21 May 2022 - MRT Corp confirms that Phase 1 operation will start at 3pm on June 16, 2022.[52]
- 16 June 2022 - Launch of the MRT Putrajaya Line Phase 1 operations by Prime Minister Ismail Sabri Yaakob , along with 1 month of free rides for all public transportation services under RapidKL including the MRT.[53]
- 23 December 2022 - The construction works of MRT Putrajaya Line Phase 2 were completed and the operational readiness phase is in progress. Because the tests may take longer period than usual to pass, the opening date of Phase 2 is expected on March 2023, delayed two months from the original January 2023 deadline.[54]
- 3 March 2023 - MRT Corp confirms that the full Putrajaya line operation will start at 3pm on March 16, 2023.[55]
- 16 March 2023 - Launch of the MRT Putrajaya Line Phase 2 operations by Prime Minister Anwar Ibrahim at the Serdang Depot. He mentioned that there will be free rides for the MRT Putrajaya Line effective from 16 March 2023 until 31 March 2023.[56]
- 20 March 2023 Minister of Transport Anthony Loke announced the construction of MRT 3 starting on 1 April 2023
Station designs
Elevated station concepts
_Platform_Level_(221113)_1.jpg.webp)
The proposed design for the elevated stations is based on the “Serambi” concept. This concept is focused on the inspiring interaction and communication at a foyer or entrance space of a house such as the entrance space at a traditional rumah kampung or rumah panjang. The design opted is a simple and timeless design, which is derived from various design concepts, including that of the Japanese zen concept. Other aspects include open space, natural lighting and ventilation, and natural visual effects via play of lighting and shadows.[57]
Compared to the Kajang Line's elevated station design, the columns have been pushed to the sides of the station, giving the stations an open and airy feel.
Underground station concepts
Each of the underground stations will carry its own individual theme, similar to that of the Kajang Line stations. The proposed designs range from preserving the rustic, reflecting tidal rhythm, promoting well-being, vibrancy, pulse of life, discovering culture, molding forms, inspired by nature to streamlined flow.[57]
List of stations


28 (23 elevated + 1 half-sunken + 4 underground) out of 35 stations (excluding the ones on the MRT Kajang Line) are expected to have feeder bus services.
Kwasa Damansara station, along with the adjoining Sungai Buloh and Kampung Selamat stations were previously built as part of the MRT Kajang Line. These three stations are currently annexed by the Putrajaya Line, thus making Kwasa Damansara the interchange station between the two MRT lines.
Station Code | Station Name | Image | Opened | Platform type | Position | Park & Ride | Connecting Bus Lines | Working Name | Interchange/Notes |
PY01 | Kwasa Damansara | ![]() |
16 June 2022 | Stacked Island | Elevated | ✓ | N/A | Kota Damansara | Northern terminus of both the MRT Putrajaya Line and MRT Kajang Line.
Cross-platform interchange with KG04 MRT Kajang Line |
PY02 | Rubber Research Institute (RRI) | - | - | - | - | - | - | RRI | Provisional station[58] |
PY03 | Kampung Selamat | ![]() |
16 June 2022 | Side | Elevated | N/A | 1 line | Kampung Baru Sungai Buloh | |
PY04 | Sungai Buloh | ![]() | Island | ✓ | 4 lines | N/A | Interchange station, without paid area integration, to KA08 KTM Port Klang Line and ETS KTM ETS. | ||
PY05 | Damansara Damai | ![]() | Island | Elevated | N/A | 1 line | N/A | ||
PY06 | Sri Damansara Barat | ![]() | Island | ✓ | 1 line | Sri Damansara West | |||
PY07 | Sri Damansara Sentral | ![]() | Side | ✓ | 3 lines | Sri Damansara East | |||
PY08 | Sri Damansara Timur | ![]() | Island | ✓ | 3 lines | Kepong Sentral | Connecting station with KA07 Kepong Sentral for the KTM Port Klang Line and ETS KTM ETS. | ||
PY09 | Metro Prima | ![]() | Island | ✓ | 4 lines | Metro Prima | Feeder bus ![]() | ||
PY10 | Kepong Baru | ![]() | Island | N/A | 1 line | Kepong Baru | |||
PY11 | Jinjang | ![]() | Island | ✓ | 3 lines | Jinjang | |||
PY12 | Sri Delima | ![]() | Island | N/A | 2 lines | Seri Delima | |||
PY13 | Kampung Batu | ![]() | Island | ✓ | 3 lines | Kampung Batu | Connecting station with KC03 KTM Seremban Line. | ||
PY14 | Kentonmen | ![]() | 16 March 2023 | Side | Elevated | ✓ | 3 lines | Kentonmen | |
PY15 | Jalan Ipoh | ![]() | Island | Half-sunken | N/A | Jalan Ipoh | Underground alignment begins after this station | ||
PY16 | Sentul Barat | ![]() | Island | Underground | N/A | 3 lines | Sentul West |
Theme: Preserving The Rustic | |
PY17 | Titiwangsa | ![]() hkl | Island | N/A | 6 lines | Titiwangsa | Interchange station with AG3 SP3 MR11 LRT Ampang Line, LRT Sri Petaling Line and KL Monorail.
Proposed interchange with CC08 MRT Circle Line. Theme: Tidal Rhythm | ||
PY18 | Hospital Kuala Lumpur | ![]() | Diverging Island | N/A | N/A | Hospital Kuala Lumpur |
Theme: Promoting Well-Being | ||
PY19 | Raja Uda–UTM | ![]() | Island | N/A | 2 lines | Kampung Baru North |
Theme: Resonating Heritage | ||
PY20 | Ampang Park | ![]() | Stacked | N/A | 2 lines | Ampang Park | Connecting station with KJ9 LRT Kelana Jaya Line.
Theme: Vibrancy | ||
PY21 | Persiaran KLCC | ![]() | Stacked | N/A | N/A | KLCC East |
Theme: Pulse of Life | ||
PY22 | Conlay–Kompleks Kraf | ![]() | Island | N/A | N/A | Conlay |
Theme: Discovering Culture | ||
PY23 | Tun Razak Exchange (TRX) | ![]() | Stacked Island | N/A | 1 line | Tun Razak Exchange | Cross-platform interchange with KG20 MRT Kajang Line.
Theme: Islamic Corporate | ||
PY24 | Chan Sow Lin | ![]() | Island | N/A | 4 lines | Chan Sow Lin | Interchange station with AG11 SP11 LRT Ampang and Sri Petaling Lines.
Theme: Moulding Forms | ||
PY25 | Bandar Malaysia Utara | - | - | ✓ | ✓ | Bandar Malaysia North | Provisional station[59]
Theme: Inspired By Nature | ||
PY26 | Bandar Malaysia Selatan | - | - | ✓ | ✓ | Bandar Malaysia South | Provisional station[59]
Proposed interchange with KTM Seremban Line, ERL KLIA Transit and ETS KTM ETS. Theme: Streamlined Flow | ||
PY27 | Kuchai | ![]() | 16 March 2023 | Island | Elevated | ✓ | 5 lines | Kuchai Lama | Proposed interchange with CC26 MRT Circle Line |
PY28 | Taman Naga Emas | ![]() | Island | ✓ | 1 line | Taman Naga Emas | |||
PY29 | Sungai Besi | ![]() | Side | ✓ | 3 lines | Sungai Besi | Interchange station with SP16 LRT Sri Petaling Line. | ||
PY30 | Taman Teknologi | - | - | - | - | - | Technology Park | Provisional station | |
PY31 | Serdang Raya Utara | ![]() |
Island | Elevated | ✓ | 3 lines | Serdang Raya North | ||
PY32 | Serdang Raya Selatan |
|
Island | ✓ | 1 line | Serdang Raya South | |||
PY33 | Serdang Jaya | ![]() | Island | N/A | 3 lines | Seri Kembangan | |||
PY34 | UPM | ![]() | Island | ✓ | 3 lines | UPM | Exit to Universiti Putra Malaysia (UPM) | ||
PY35 | Taman Universiti | - | Side | - | - | - | Taman Universiti | Provisional station | |
PY36 | Taman Equine | ![]() | 16 March 2023 | Island | Elevated | ✓ | 3 lines | Equine Park | |
PY37 | Putra Permai | ![]() | Island | N/A | 1 line | Taman Putra Permai | |||
PY38 | 16 Sierra | ![]() | Island | N/A | ✓ | 16 Sierra | |||
PY39 | Cyberjaya Utara | ![]() | Island | ✓ | 2 lines | Cyberjaya North | |||
PY40 | Cyberjaya City Centre–Limkokwing | ![]() | Island | N/A | 3 lines | N/A | |||
PY41 | Putrajaya Sentral | ![]() | Island | ✓ | 8 lines | Putrajaya Sentral | Southern terminus. Connecting station with KT3 ERL KLIA Transit and proposed 14 Putrajaya Monorail. |
Rolling stock
_2.jpg.webp)
The rolling stock will be provided by HAP Consortium which consists of Hyundai Rotem, Apex Communications and POSCO Engineering. The trains are assumed to be driverless with a capacity of 1,200 passengers in a 4-car trainsets formation.[60]
The 4-car trainsets will be maintained at 2 purpose-built facilities, Sungai Buloh and Serdang depots, located nearby Kwasa Damansara and the proposed Taman Universiti stations respectively.[61]
Formation
The train consists of four cars, with car 1 facing towards Kwasa Damansara and car 4 facing towards Putrajaya Sentral.
Set designation | 1 | 2 | 3 | 4 |
---|---|---|---|---|
Formation | Cabin | Middle Car | Middle Car | Cabin |
Ridership
Putrajaya Line Ridership[62][63] | ||||
---|---|---|---|---|
Year | Month/Quarter | Ridership | Annual Ridership | Note |
2022 | Q1 | - | 4,147,577 | |
Q2 | 369,564 | Kwasa Damansara – Kampung Batu section opened in 16 June 2022 | ||
Q3 | 1,873,209 | |||
Q4 | 1,904,804 |
Criticism
Inaccessibility of stations and inadequate first and last mile connectivity has been criticized by potential users of the new MRT line - a problem which has already led to lower than expected ridership on other public transport lines in the Klang Valley. For example, the Cyberjaya stations were located further away from the main town centre.[64]
References
- "PUTRAJAYA LINE STATIONS". Archived from the original on 15 January 2021. Retrieved 1 January 2021.
- "MRT Putrajaya Line opens - we've tried it; here's our experience and guide to KV's new rail line - paultan.org". Paul Tan's Automotive News. 15 March 2023. Retrieved 17 March 2023.
- "MRT Corp". www.facebook.com. Archived from the original on 19 May 2022. Retrieved 20 March 2022.
- "Putrajaya MRT line set for full opening on March 16". Free Malaysia Today. Retrieved 3 March 2023.
- "Putrajaya Line". MRT Corp. Archived from the original on 23 September 2022. Retrieved 23 September 2022.
- Tan, Danny (15 April 2019). "Kajang-Putrajaya rail project could be revived – report". paultan.org. Archived from the original on 23 September 2022. Retrieved 23 September 2022.
- "Original plan was for new MRT2 to start from Sg Buloh and not Selayang". The Star Online. Archived from the original on 5 May 2015. Retrieved 27 April 2015.
- "Draft Urban Rail Development Plan" (PDF). Draft Greater KL/ Klang Valley Land Public Transport Master Plan. SPAD. Retrieved 22 February 2012.
- "Gamuda, MMC likely to get RM24.9bil KVMRT 2 tunnelling job". The Star. 15 May 2013. Archived from the original on 15 December 2013. Retrieved 2 September 2013.
- "KVMRT line 2". KVMRT. 19 May 2013. Archived from the original on 20 December 2013. Retrieved 2 September 2013.
- Ch'ng, Brenda (3 December 2014). "Building of new MRT second line to begin next November". The Star. Star. Star Publication. Archived from the original on 2 December 2020. Retrieved 3 December 2014.
- "New alignment for Sg Buloh-Putrajaya MRT line proposed". The Star Online. Archived from the original on 5 April 2015. Retrieved 3 April 2015.
- "MRT Corp prepares tender for Line 2, project display in Q2". thestar.com.my. Archived from the original on 1 August 2015. Retrieved 16 May 2015.
- "MRT line 2 from Sg Buloh to Putrajaya gets green light". The Rakyat Post. Archived from the original on 4 March 2016. Retrieved 22 September 2014.
- "Budget 2015: Boon for construction". The Star Online. Archived from the original on 12 October 2014. Retrieved 11 October 2014.
- "New alignment for Sg Buloh-Putrajaya MRT line proposed". The Star Online. Archived from the original on 5 April 2015. Retrieved 3 April 2015.
- "Details of MRT2 project on public display tomorrow". The Star Online. Archived from the original on 15 May 2015. Retrieved 14 May 2015.
- "MRT Corp to submit Line 3 study to govt by year-end – Business News | The Star Online". www.thestar.com.my. Archived from the original on 9 May 2017. Retrieved 17 August 2016.
- "PM launches RM32b second MRT line to turn Klang Valley into world class city". 15 September 2016. Archived from the original on 15 June 2017. Retrieved 1 June 2017.
- Abas, Azura; Aziz, Fazleena (15 September 2016). "MRT Sg Buloh-Serdang-Putrajaya Line to cut travel time to KL to 30 minutes". Retrieved 23 September 2022.
- "MMC Gamuda Media Statement" (PDF). MRT SUNGAI BULOH – SERDANG – PUTRAJAYA LINE PROGRESSING AS SCHEDULED. 27 February 2017. Archived (PDF) from the original on 6 June 2017. Retrieved 1 June 2017.
- "Mini buses, cycle facilities proposed to boost MRT usage - Metro News | The Star Online". www.thestar.com.my. Archived from the original on 5 March 2018. Retrieved 4 March 2018.
- beritanasionalrtm rasmi (4 September 2017), MRT SSP - 4 MESIN TBM BARU DAN 8 SEDIA ADA AKAN MULA PENGGALIAN 2018 [5 SEPT 2017], archived from the original on 19 May 2022, retrieved 22 September 2017
- "MRT Corp: Tunnelling work for SSP line to start next year". www.thesundaily.my. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- "Sentul police quarters make way for MRT SSP line, occupants to get new units". NST Online. 26 September 2017. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- "MRT2 tunnelling works to be improved with new TBM machines". www.thesundaily.my. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- "Blast at MRT construction site caused by World War 2 bomb". NST Online. 11 October 2017. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- "MRT Sungai Buloh-Serdang-Putrajaya (SSP) Line's technology wins award". NST Online. 13 October 2017. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- MYMRTUNDERGROUND (28 November 2017), KVMRT LINE 2 SSP PROGRESS VIDEO NO.1 (AUG 2016 to NOV 2017), archived from the original on 8 May 2020, retrieved 4 March 2018
- MRTMalaysia (18 December 2017), MRT SSP Line Project Progress Video (2016-2017), archived from the original on 28 February 2020, retrieved 4 March 2018
- "MRT SSP Line work on track". www.thesundaily.my. Archived from the original on 5 March 2018. Retrieved 4 March 2018.
- "MRT Corp saves 15% cost from refurbished TBMs". themalaysianreserve.com. Archived from the original on 2 March 2018. Retrieved 4 March 2018.
- "Worker killed as launching gantry collapses at MRT construction site [NSTTV]". NST Online. 4 March 2018. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- "MRT line 2 at 24% completion, ahead of schedule (Updated)". www.thesundaily.my. Archived from the original on 26 April 2018. Retrieved 25 April 2018.
- "MRT Sg Buloh line 30% done - Business News | The Star Online". www.thestar.com.my. Archived from the original on 12 July 2018. Retrieved 12 July 2018.
- "23% saved on MRT2 above-ground works, underground part to be retendered says Guan Eng - Nation | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- "Termination of MMC-Gamuda MRT2 contract a Cabinet decision, says Guan Eng - Nation | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- "Gamuda, MMC shares fall - Business News | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- "PM: We may reconsider contract - Nation | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- "Azmin confirms setting up of Cabinet committee to review MRT2 contract - Nation | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- "MoF: MMC-Gamuda to continue underground MRT2, costs cut to RM13.11b". The Edge Markets. 26 October 2018. Archived from the original on 29 October 2018. Retrieved 29 October 2018.
- "Cabinet accepts MMC-Gamuda offer - Business News | The Star Online". www.thestar.com.my. Archived from the original on 6 November 2018. Retrieved 6 November 2018.
- MRTMalaysia (9 December 2018), MRT SSP Line Project Progress Video (2017-2018), archived from the original on 10 April 2020, retrieved 21 March 2019
- Nair, Vijenthi; Sakdon, Zawin. "First tunnel on second MRT line completed - Metro News | The Star Online". www.thestar.com.my. Archived from the original on 21 March 2019. Retrieved 21 March 2019.
- "Three MRT stations to close for two days". Malay Mail. 6 March 2019. Archived from the original on 21 March 2019. Retrieved 21 March 2019.
- "Najmuddin Abdullah on Instagram: ""My favourite tunnel boring machine (TBM) because its number is 777" 😅 Today, 15 March 2019 we witnessed the second TBM breakthrough at…"". Instagram. Archived from the original on 22 March 2019. Retrieved 21 March 2019.
- "Tunnel 'breakthrough' at Ampang Park MRT station". 9 November 2019. Archived from the original on 10 November 2019. Retrieved 17 January 2020.
- Hashini Kavishtri Kannan (17 January 2020). "MRT 2 is 70 per cent completed". Archived from the original on 17 January 2020. Retrieved 17 January 2020.
- "Phase one of Putrajaya MRT line almost complete, operations scheduled to start in August | The Star". www.thestar.com.my. Archived from the original on 3 April 2021. Retrieved 3 April 2021.
- "Putrajaya Line MRT Phase 1 Expected To Open In November 2021". 8 July 2021. Archived from the original on 10 July 2021. Retrieved 10 July 2021.
- "MMC-GAMUDA WINS BACK-TO-BACK AWARDS". The Star. 6 December 2021. Archived from the original on 6 December 2021. Retrieved 6 December 2021.
- "First phase of Putrajaya Line opens on June 16". Freemalaysiatoday. 21 May 2022. Retrieved 2 June 2022.
- Muhamad, Hasimi. "Berita gembira! Tambang percuma MRT, LRT, selama sebulan". Astro Awani. Retrieved 16 June 2022.
- "Phase 2 of Putrajaya MRT Line fully operational in March". Freemalaysiatoday. 23 December 2022. Retrieved 23 December 2022.
- "Putrajaya MRT line set for full opening on March 16". Freemalaysiatoday. 3 March 2023. Retrieved 3 March 2023.
- "Free rides on Putrajaya MRT till March 31". Freemalaysiatoday. 16 March 2023. Retrieved 16 March 2023.
- "Stations". MRT Corp. Archived from the original on 4 March 2018. Retrieved 4 March 2018.
- "Putrajaya Line". MRT Corp. Retrieved 4 March 2023.
- seetrustudio03. "Sungai Besi Air Force Base (Bandar Malaysia Utara)". MRT Corp. Archived from the original on 7 September 2021. Retrieved 7 September 2021.
- "MRCB, IJM, Apex among winners of RM4.2b MRT Line 2 jobs - Business News | the Star Online". Archived from the original on 24 June 2016. Retrieved 3 June 2016.
- Progress Report (PDF). MRT Corp. 2012. p. 13. Archived from the original (PDF) on 4 March 2016.
- "Statistic of Rail Transport". Ministry of Transport (Malaysia). Archived from the original on 12 January 2023.
- "Prasarana's Ridership".
- "Govt should focus on pedestrian walkways, bicycle lanes to increase accessibility to rail stations". Malay Mail. Retrieved 3 March 2023.
Notes
- Excluding annexed stations from Kajang Line and the cancelled Bandar Malaysia stations
External links
- Mass Rapid Transit Corporation (MRT Corp)
- MRT Website
- Prasarana Malaysia Berhad (Prasarana)
- Suruhanjaya Pengangkutan Awam Darat (SPAD)