Line 3 (Chennai Metro)

The Purple Line or Line 3 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from Madhavaram Milk Colony to Siruseri Sipcot 2. The line will consist of 47 stations, out of which 28 are underground and 19 are elevated.

Line 3 (Purple Line)
Overview
StatusUnder Construction
OwnerCMRL
Termini
  • Madhavaram Milk Colony
  • Kilambakkam
Stations47
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Technical
Line length45.8 km (28.5 mi)
Number of tracks2
Character26.7 km Underground and 19.1 km Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed120 km/h (75 mph)

Phase II

E. Sreedharan, in 2013, stressed on the need of a greater expansion of Chennai metro network by undertaking subsequent phases. In July 2016, the then Chief Minister J. Jayalalithaa announced that Chennai Metro Phase 2 would be 104 km long and have 104 stations.[1] In July 2017, in a suo motu statement in the State Legislative Assembly, an extension in Phase II, involving an extension of Line 4 from Lighthouse up to Poonamallee, with the MadhavaramSholinganallur and Lighthouse–Poonamallee lines intersecting at Alwarthirunagar was announced, making Phase 2 120 km long.[2] The key focus for Phase 2 is to connect the northern (Madhavaram, Thiruvottriyur, Redhills) and southern parts (Siruseri, Sholinganallur) and the east parts of Chennai (Light house, Mylapore) to the western parts of Chennai (Porur, Poonamallee). Tamil Nadu Road Development Corporation (TNRDC) has also proposed an elevated 17.2 km (10.7 mi) four-lane corridor for the IT corridor from Taramani to Siruseri. CMRL will construct its piers on top of the flyover built by TNRDC.

Line Terminal Length
(km)
Number of stations Rolling stock
Line 3 Madhavaram Milk Colony Siruseri Sipcot 2 45.8 kilometres (28.5 mi) 47 30 trains of 6 cars each exclusively for Line 3 plus 40 trains of 6 cars each and 30 trains of 6 cars each common for Lines 3 and 5 circular train operation.
Line 4 Poonamallee Depot Lighthouse 26.1 kilometres (16.2 mi) 27[3] 30 trains of 6 cars each
Line 5 Madhavaram Depot Sholinganallur 47 kilometres (29 mi) 48 30 trains of 6 cars each and 10 trains of 6 cars each exclusively for Line 5 plus 30 trains of 6 cars each and 20 trains of 6 cars each common for Lines 3 and 5 circular train operation as mentioned above in Line 3 table.
Total 120 km (75 mi) 122 220 trains of 6 cars each.

The lines 3, 4 and 5 are proposed to have 42.41 km (26.35 mi) underground and 76.5 km (47.5 mi) elevated routes. The present estimate for the phase 2 stands at Rs. 70,000 crore and approval has been received from the state government. Foundation stone for phase 2 was laid on 20 November 2020 by Union Home Minister Amit Shah and construction for the phase from Poonamallee to Power House of Line 4 commenced on 1 June 2021.[4][5] The construction work for certain sections of the second phase of Chennai Metro Rail project is hit due to delay in the selection of the general consultant (GC) after concerns were raised by more than 50% of bidders on the CMRL shortlisting companies based on their technical qualifications. Addressing an event in Chennai, Prime Minister Narendra Modi on Sunday 14 February 2021 said the Centre has set aside Rs 70,000 crore in this year’s Budget for the second phase of Chennai Metro totaling 135 km, which is one of the largest projects sanctioned for any city in one-go.[6] The map and list of stations for all 3 proposed lines to be part of Phase 2 has also been published by CMRL.

There are also plans to extend the Poonamallee line (Line 4) by 4 km to the proposed township of Tirumazhisai in the western part of the city[7] by CMRL.[8] Phase 2 is expected to be completed by 2025.[9] Phase 2 will have trains will have six coaches, making a total of 414 coaches.[10]

The stations in phase II will be smaller at 150 m (490 ft) compared with 220 m (720 ft) in phase I. Phase II will have three depots, namely, Madhavaram (30 hectares), SIPCOT (10 ha [25 acres]), and Poonamallee (20 ha [49 acres]).[11]

CMRL has decided to implement LRT Metrolite, covering 17 km connecting Tambaram and Velachery railway stations along the Velachery -Tambaram Road and in February 2021, the state assembly announced that the feasibility study had started for the same to soon prepare a dpr.

Stations

Purple Line
S.No Station Name Connections Layout Opened
EnglishTamil
1Madhavaram Milk Colonyமாதவரம் பால் பண்ணை  Red LineUndergroundUC
2Madhavaram High Roadமாதவரம் நெடுஞ்சாலைNoneUndergroundUC
3Moolakadaiமூலக்கடைNoneUndergroundUC
4Sembiyamசெம்பியம்NoneUndergroundUC
5Perambur Marketபெரம்பூர் அங்காடிNoneUndergroundUC
6Peramburபெரம்பூர்Mainline rail interchange Perambur railway stationUndergroundUC
7Ayanavaramஅயனாவரம்Bus interchange Bus TerminusUndergroundUC
8Otteriஓட்டேரிNoneUndergroundUC
9Pattalamபட்டாளம்NoneUndergroundUC
10Perambur Barracks Roadபெரம்பூர் பேரக்ஸ் சாலைNoneUndergroundUC
11Purasaiwakkamபுரசைவாக்கம்NoneUndergroundUC
12Kellysகெல்லீஸ்NoneUndergroundUC
13Kilpauk Medical Collegeகீழ்ப்பாக்கம் மருத்துவக் கல்லூரி  Green LineUndergroundUC
14Chetpetசேத்துப்பட்டுMainline rail interchange Chetpet railway stationUndergroundUC
15Sterling Roadஸ்டெர்லிங் சாலைNoneUndergroundUC
16Nungambakkamநுங்கம்பாக்கம்NoneUndergroundUC
17Anna Flyoverஅண்ணா மேம்பாலம்NoneUndergroundUC
18Thousand Lightsஆயிரம் விளக்கு  Blue LineUndergroundUC
19Royapettahராயப்பேட்டைNoneUndergroundUC
20Dr.Radhakrishnan Road Junctionடாக்டர் ராதாகிருஷ்ணன் சாலைNoneUndergroundUC
21ThirumayilaiதிருமயிலைMainline rail interchange Thirumayilai railway station,   Orange LineUndergroundUC
22Mandaiveliமந்தைவெளிBus interchange Bus TerminusUndergroundUC
23Greenways Roadபசுமைவழிச் சாலைNoneUndergroundUC
24Adyar Junctionஅடையாறு சந்திப்புNoneUndergroundUC
25Adyar Depotஅடையாறு பணிமனைBus interchange Bus TerminusUndergroundUC
26IndiraNagarஇந்திரா நகர்NoneUndergroundUC
27Thiruvanmiyurதிருவான்மியூர்Mainline rail interchange Thiruvanmiyur railway stationUndergroundUC
28TharamaniதரமணிNoneUndergroundUC
29Nehru Nagarநேரு நகர்NoneElevatedUC
30Kandanchavadiகந்தன்சாவடிNoneElevatedUC
31Perungudiபெருங்குடிNoneElevatedUC
32Thoraipakkamதுரைப்பாக்கம்NoneElevatedUC
33Mettukuppamமேட்டுக்குப்பம்NoneElevatedUC
34PTC Colonyபி.டி.சி. காலனிNoneElevatedUC
35Okkiyampetஒக்கியம்பேட்டைNoneElevatedUC
36Karapakkamகாரப்பாக்கம்NoneElevatedUC
37Okkiyam Thoraipakkamஒக்கியம் துரைப்பாக்கம்NoneElevatedUC
38Sholinganallurசோழிங்கநல்லூர்  Red LineElevatedUC
39Sholinganallur Lake 1சோழிங்கநல்லூர் ஏரி 1NoneElevatedUC
40Sholinganallur Lake 2சோழிங்கநல்லூர் ஏரி 2NoneElevatedUC
41Semmancheri 1செம்மஞ்சேரி 1NoneElevatedUC
42Semmancheri 2செம்மஞ்சேரி 2NoneElevatedUC
43Gandhi Nagarகாந்தி நகர்NoneElevatedUC
44Navalurநாவலூர்NoneElevatedUC
45SiruseriசிறுசேரிNoneElevatedUC
46Siruseri Sipcot 1சிறுசேரி சிப்காட் 1NoneElevatedUC
47Siruseri Sipcot 2சிறுசேரி சிப்காட் 2NoneElevatedUC
NASipcot Depotசிப்காட் டிப்போNoneTBAProposed Phase 3
NAKelambakkamகேளம்பாக்கம்NoneTBAProposed Phase 3
NAMambakkamமாம்பாக்கம்NoneTBAProposed Phase 3
NAVandalurவண்டலூர்Mainline rail interchange Vandalur railway station   Blue LineElevatedProposed Phase 3
NAArignar Anna Zoological Parkஅறிஞர் அண்ணா உயிரியல் பூங்கா  Blue LineElevatedProposed Phase 3
NAKilambakkamகிளாம்பாக்கம்  Blue Line, Bus interchange Bus Terminus, Mainline rail interchange Kilambakkam railway stationElevatedProposed Phase 3

References

  1. Sekar, Sunitha. "104 km, 104 stations: Unveiling Phase II of Metro". The Hindu. Retrieved 24 January 2017.
  2. "Metro's second phase to go up to Poonamallee". The Hindu. Chennai: Kasturi & Sons. 20 July 2017. Retrieved 1 October 2017.
  3. U, Tejonmayam. "Metro to link route planned under monorail network". The Times of India. Retrieved 17 February 2019.
  4. Sekar, Sunitha. "Detailed project report for Phase II of Metro Rail ready". The Hindu. Retrieved 24 January 2017.
  5. U, Tejonmayam. "Chennai: Metro rail to trim stations under phase 2". The Times of India. Retrieved 24 January 2017.
  6. Dipak K, Dash. "Ground work for Chennai metro rail phase-2 hit". Times of India. Retrieved 19 February 2021.
  7. Sekar, Sunitha (26 December 2018). "CMRL mulls extending line to Tirumazhisai". The Hindu. Retrieved 1 January 2019.
  8. "Chennai Metro: Corridor-4 extension plans on cards". The New Indian Express. Retrieved 23 January 2021.
  9. "Metro Rail second phase likely to be completed in five years". The New Indian Express. Retrieved 26 April 2019.
  10. Sekar, Sunitha (11 March 2019). "Chennai Metro phase II to have six-coach trains". The Hindu. Chennai: Kasturi & Sons. p. 2. Retrieved 1 May 2019.
  11. Sekar, Sunitha (25 April 2019). "For phase II, Chennai Metro will need less private land". The Hindu. Chennai: Kasturi & Sons. p. 3. Retrieved 2 May 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.