Line 3 (Chennai Metro)
The Purple Line or Line 3 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from Madhavaram Milk Colony to Siruseri Sipcot 2. The line will consist of 47 stations, out of which 28 are underground and 19 are elevated.
Line 3 (Purple Line) | |
---|---|
Overview | |
Status | Under Construction |
Owner | CMRL |
Termini |
|
Stations | 47 |
Service | |
Type | Rapid transit |
System | Chennai Metro |
Operator(s) | Chennai Metro Rail Limited |
Technical | |
Line length | 45.8 km (28.5 mi) |
Number of tracks | 2 |
Character | 26.7 km Underground and 19.1 km Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 kV 50 Hz AC overhead catenary |
Operating speed | 120 km/h (75 mph) |
Phase II
E. Sreedharan, in 2013, stressed on the need of a greater expansion of Chennai metro network by undertaking subsequent phases. In July 2016, the then Chief Minister J. Jayalalithaa announced that Chennai Metro Phase 2 would be 104 km long and have 104 stations.[1] In July 2017, in a suo motu statement in the State Legislative Assembly, an extension in Phase II, involving an extension of Line 4 from Lighthouse up to Poonamallee, with the Madhavaram–Sholinganallur and Lighthouse–Poonamallee lines intersecting at Alwarthirunagar was announced, making Phase 2 120 km long.[2] The key focus for Phase 2 is to connect the northern (Madhavaram, Thiruvottriyur, Redhills) and southern parts (Siruseri, Sholinganallur) and the east parts of Chennai (Light house, Mylapore) to the western parts of Chennai (Porur, Poonamallee). Tamil Nadu Road Development Corporation (TNRDC) has also proposed an elevated 17.2 km (10.7 mi) four-lane corridor for the IT corridor from Taramani to Siruseri. CMRL will construct its piers on top of the flyover built by TNRDC.
Line | Terminal | Length (km) |
Number of stations | Rolling stock | |
---|---|---|---|---|---|
Line 3 | Madhavaram Milk Colony | Siruseri Sipcot 2 | 45.8 kilometres (28.5 mi) | 47 | 30 trains of 6 cars each exclusively for Line 3 plus 40 trains of 6 cars each and 30 trains of 6 cars each common for Lines 3 and 5 circular train operation. |
Line 4 | Poonamallee Depot | Lighthouse | 26.1 kilometres (16.2 mi) | 27[3] | 30 trains of 6 cars each |
Line 5 | Madhavaram Depot | Sholinganallur | 47 kilometres (29 mi) | 48 | 30 trains of 6 cars each and 10 trains of 6 cars each exclusively for Line 5 plus 30 trains of 6 cars each and 20 trains of 6 cars each common for Lines 3 and 5 circular train operation as mentioned above in Line 3 table. |
Total | 120 km (75 mi) | 122 | 220 trains of 6 cars each. |
The lines 3, 4 and 5 are proposed to have 42.41 km (26.35 mi) underground and 76.5 km (47.5 mi) elevated routes. The present estimate for the phase 2 stands at Rs. 70,000 crore and approval has been received from the state government. Foundation stone for phase 2 was laid on 20 November 2020 by Union Home Minister Amit Shah and construction for the phase from Poonamallee to Power House of Line 4 commenced on 1 June 2021.[4][5] The construction work for certain sections of the second phase of Chennai Metro Rail project is hit due to delay in the selection of the general consultant (GC) after concerns were raised by more than 50% of bidders on the CMRL shortlisting companies based on their technical qualifications. Addressing an event in Chennai, Prime Minister Narendra Modi on Sunday 14 February 2021 said the Centre has set aside Rs 70,000 crore in this year’s Budget for the second phase of Chennai Metro totaling 135 km, which is one of the largest projects sanctioned for any city in one-go.[6] The map and list of stations for all 3 proposed lines to be part of Phase 2 has also been published by CMRL.
There are also plans to extend the Poonamallee line (Line 4) by 4 km to the proposed township of Tirumazhisai in the western part of the city[7] by CMRL.[8] Phase 2 is expected to be completed by 2025.[9] Phase 2 will have trains will have six coaches, making a total of 414 coaches.[10]
The stations in phase II will be smaller at 150 m (490 ft) compared with 220 m (720 ft) in phase I. Phase II will have three depots, namely, Madhavaram (30 hectares), SIPCOT (10 ha [25 acres]), and Poonamallee (20 ha [49 acres]).[11]
CMRL has decided to implement LRT Metrolite, covering 17 km connecting Tambaram and Velachery railway stations along the Velachery -Tambaram Road and in February 2021, the state assembly announced that the feasibility study had started for the same to soon prepare a dpr.
Stations
Purple Line | |||||
---|---|---|---|---|---|
S.No | Station Name | Connections | Layout | Opened | |
English | Tamil | ||||
1 | Madhavaram Milk Colony | மாதவரம் பால் பண்ணை | Red Line | Underground | UC |
2 | Madhavaram High Road | மாதவரம் நெடுஞ்சாலை | None | Underground | UC |
3 | Moolakadai | மூலக்கடை | None | Underground | UC |
4 | Sembiyam | செம்பியம் | None | Underground | UC |
5 | Perambur Market | பெரம்பூர் அங்காடி | None | Underground | UC |
6 | Perambur | பெரம்பூர் | ![]() | Underground | UC |
7 | Ayanavaram | அயனாவரம் | ![]() | Underground | UC |
8 | Otteri | ஓட்டேரி | None | Underground | UC |
9 | Pattalam | பட்டாளம் | None | Underground | UC |
10 | Perambur Barracks Road | பெரம்பூர் பேரக்ஸ் சாலை | None | Underground | UC |
11 | Purasaiwakkam | புரசைவாக்கம் | None | Underground | UC |
12 | Kellys | கெல்லீஸ் | None | Underground | UC |
13 | Kilpauk Medical College | கீழ்ப்பாக்கம் மருத்துவக் கல்லூரி | Green Line | Underground | UC |
14 | Chetpet | சேத்துப்பட்டு | ![]() | Underground | UC |
15 | Sterling Road | ஸ்டெர்லிங் சாலை | None | Underground | UC |
16 | Nungambakkam | நுங்கம்பாக்கம் | None | Underground | UC |
17 | Anna Flyover | அண்ணா மேம்பாலம் | None | Underground | UC |
18 | Thousand Lights | ஆயிரம் விளக்கு | Blue Line | Underground | UC |
19 | Royapettah | ராயப்பேட்டை | None | Underground | UC |
20 | Dr.Radhakrishnan Road Junction | டாக்டர் ராதாகிருஷ்ணன் சாலை | None | Underground | UC |
21 | Thirumayilai | திருமயிலை | ![]() | Underground | UC |
22 | Mandaiveli | மந்தைவெளி | ![]() | Underground | UC |
23 | Greenways Road | பசுமைவழிச் சாலை | None | Underground | UC |
24 | Adyar Junction | அடையாறு சந்திப்பு | None | Underground | UC |
25 | Adyar Depot | அடையாறு பணிமனை | ![]() | Underground | UC |
26 | IndiraNagar | இந்திரா நகர் | None | Underground | UC |
27 | Thiruvanmiyur | திருவான்மியூர் | ![]() | Underground | UC |
28 | Tharamani | தரமணி | None | Underground | UC |
29 | Nehru Nagar | நேரு நகர் | None | Elevated | UC |
30 | Kandanchavadi | கந்தன்சாவடி | None | Elevated | UC |
31 | Perungudi | பெருங்குடி | None | Elevated | UC |
32 | Thoraipakkam | துரைப்பாக்கம் | None | Elevated | UC |
33 | Mettukuppam | மேட்டுக்குப்பம் | None | Elevated | UC |
34 | PTC Colony | பி.டி.சி. காலனி | None | Elevated | UC |
35 | Okkiyampet | ஒக்கியம்பேட்டை | None | Elevated | UC |
36 | Karapakkam | காரப்பாக்கம் | None | Elevated | UC |
37 | Okkiyam Thoraipakkam | ஒக்கியம் துரைப்பாக்கம் | None | Elevated | UC |
38 | Sholinganallur | சோழிங்கநல்லூர் | Red Line | Elevated | UC |
39 | Sholinganallur Lake 1 | சோழிங்கநல்லூர் ஏரி 1 | None | Elevated | UC |
40 | Sholinganallur Lake 2 | சோழிங்கநல்லூர் ஏரி 2 | None | Elevated | UC |
41 | Semmancheri 1 | செம்மஞ்சேரி 1 | None | Elevated | UC |
42 | Semmancheri 2 | செம்மஞ்சேரி 2 | None | Elevated | UC |
43 | Gandhi Nagar | காந்தி நகர் | None | Elevated | UC |
44 | Navalur | நாவலூர் | None | Elevated | UC |
45 | Siruseri | சிறுசேரி | None | Elevated | UC |
46 | Siruseri Sipcot 1 | சிறுசேரி சிப்காட் 1 | None | Elevated | UC |
47 | Siruseri Sipcot 2 | சிறுசேரி சிப்காட் 2 | None | Elevated | UC |
NA | Sipcot Depot | சிப்காட் டிப்போ | None | TBA | Proposed Phase 3 |
NA | Kelambakkam | கேளம்பாக்கம் | None | TBA | Proposed Phase 3 |
NA | Mambakkam | மாம்பாக்கம் | None | TBA | Proposed Phase 3 |
NA | Vandalur | வண்டலூர் | ![]() | Elevated | Proposed Phase 3 |
NA | Arignar Anna Zoological Park | அறிஞர் அண்ணா உயிரியல் பூங்கா | Blue Line | Elevated | Proposed Phase 3 |
NA | Kilambakkam | கிளாம்பாக்கம் | Blue Line, ![]() ![]() | Elevated | Proposed Phase 3 |
References
- Sekar, Sunitha. "104 km, 104 stations: Unveiling Phase II of Metro". The Hindu. Retrieved 24 January 2017.
- "Metro's second phase to go up to Poonamallee". The Hindu. Chennai: Kasturi & Sons. 20 July 2017. Retrieved 1 October 2017.
- U, Tejonmayam. "Metro to link route planned under monorail network". The Times of India. Retrieved 17 February 2019.
- Sekar, Sunitha. "Detailed project report for Phase II of Metro Rail ready". The Hindu. Retrieved 24 January 2017.
- U, Tejonmayam. "Chennai: Metro rail to trim stations under phase 2". The Times of India. Retrieved 24 January 2017.
- Dipak K, Dash. "Ground work for Chennai metro rail phase-2 hit". Times of India. Retrieved 19 February 2021.
- Sekar, Sunitha (26 December 2018). "CMRL mulls extending line to Tirumazhisai". The Hindu. Retrieved 1 January 2019.
- "Chennai Metro: Corridor-4 extension plans on cards". The New Indian Express. Retrieved 23 January 2021.
- "Metro Rail second phase likely to be completed in five years". The New Indian Express. Retrieved 26 April 2019.
- Sekar, Sunitha (11 March 2019). "Chennai Metro phase II to have six-coach trains". The Hindu. Chennai: Kasturi & Sons. p. 2. Retrieved 1 May 2019.
- Sekar, Sunitha (25 April 2019). "For phase II, Chennai Metro will need less private land". The Hindu. Chennai: Kasturi & Sons. p. 3. Retrieved 2 May 2019.