Line 4 (Chennai Metro)

The Orange Line or Line 4 is one of the three lines of Chennai Metro, Phase 2 Project . The under construction line stretches from Light House to Poonamallee Bypass . The line will consist of 27 stations, out of which 9 are underground and 18 are elevated.

Line 4 (Orange Line)
Overview
StatusUnder Construction
OwnerCMRL
Termini
Stations27
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Technical
Line length26.1 km (16.2 mi)
Number of tracks2
Character10.1 km Underground and 16.0 km Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed120 km/h (75 mph)

Phase II

E. Sreedharan, in 2013, stressed on the need of a greater expansion of Chennai metro network by undertaking subsequent phases. In July 2016, the then Chief Minister J. Jayalalithaa announced that Chennai Metro Phase 2 would be 104 km long and have 104 stations.[1] In July 2017, in a suo motu statement in the State Legislative Assembly, an extension in Phase II, involving an extension of Line 4 from Lighthouse up to Poonamallee, with the MadhavaramSholinganallur and Lighthouse–Poonamallee lines intersecting at Alwarthirunagar was announced, making Phase 2 120 km long.[2] The key focus for Phase 2 is to connect the northern (Madhavaram, Thiruvottriyur, Redhills) and southern parts (Siruseri, Sholinganallur) and the east parts of Chennai (Light house, Mylapore) to the western parts of Chennai (Porur, Poonamallee). Tamil Nadu Road Development Corporation (TNRDC) has also proposed an elevated 17.2 km (10.7 mi) four-lane corridor for the IT corridor from Taramani to Siruseri. CMRL will construct its piers on top of the flyover built by TNRDC.

Line Terminal Length
(km)
Number of stations Rolling stock
Line 3 Madhavaram Milk Colony Siruseri Sipcot 2 45.8 kilometres (28.5 mi) 47 30 trains of 6 cars each exclusively for Line 3 plus 40 trains of 3 cars each and 20 trains of 6 cars each common for Lines 3 and 5 circular train operation.
Line 4 Poonamallee Depot Lighthouse 26.1 kilometres (16.2 mi) 27 [3] 30 trains of 6 cars each
Line 5 Madhavaram Depot Sholinganallur 47 kilometres (29 mi) 48 30 trains of 6 cars each and 10 trains of 6 cars each exclusively for Line 5 plus 40 trains of 6 cars each and 20 trains of 6 cars each common for Lines 3 and 5 circular train operation as mentioned above in Line 3 table.
Total 120 km (75 mi) 122 220 trains of 6 cars each.

The lines 3, 4 and 5 are proposed to have 42.41 km (26.35 mi) underground and 76.5 km (47.5 mi) elevated routes. The present estimate for the phase 2 stands at Rs. 61,000 crore and approval has been received from the state government. Foundation stone for phase 2 was laid on 20 November 2020 by Union Home Minister Amit Shah and construction for the phase from Poonamallee to Power House of Line 4 commenced on 1 June 2021.[4][5] The construction work for certain sections of the second phase of Chennai Metro Rail project is hit due to delay in the selection of the general consultant (GC) after concerns were raised by more than 50% of bidders on the CMRL shortlisting companies based on their technical qualifications. Addressing an event in Chennai, Prime Minister Narendra Modi on Sunday 14 February 2021 said the Centre has set aside Rs 63,000 crore in this year’s Budget for the second phase of Chennai Metro totaling 135 km, which is one of the largest projects sanctioned for any city in one-go.[6] The map and list of stations for all 3 proposed lines to be part of Phase 2 has also been published by CMRL.

There are also plans to extend the Poonamallee line (Line 4) by 4 km to the proposed township of Tirumazhisai in the western part of the city[7] by CMRL.[8] Phase 2 is expected to be completed by 2026.[9] Phase 2 will have trains with three and six coaches, making a total of 414 coaches.[10]

The stations in phase II will be smaller at 300 m (980 ft) compared with 220 m (720 ft) in phase I. Phase II will have three depots, namely, Madhavaram (30 hectares), SIPCOT (10 ha [25 acres]), and Poonamallee (20 ha [49 acres]).[11]

CMRL has decided to implement LRT Metrolite, covering 20 km connecting Tambaram and Velachery railway stations along the Velachery -Tambaram Road and in February 2021, the state assembly announced that the feasibility study had started for the same to soon prepare a dpr.

Stations

Orange Line
S.No Station Name Connections Layout Opened
EnglishTamil
1Lighthouseகலங்கரை விளக்கம்NoneUndergroundUC
2Kutchery Roadகச்சேரி சாலைNoneUndergroundUC
3ThirumayilaiதிருமயிலைMainline rail interchange Thirumayilai railway station,   Purple LineUndergroundUC
4Alwarpetஆழ்வார்பேட்டைNoneUndergroundUC
5Bharathidasan Roadபாரதிதாசன் சாலைNoneUndergroundUC
6Boat Clubபடகு குழாம்NoneUndergroundUC
7Nandanamநந்தனம்  Blue LineUndergroundUC
8Panagal Parkபனகல் பூங்காNoneUndergroundUC
9Kodambakkamகோடம்பாக்கம்Mainline rail interchange Kodambakkam railway stationUndergroundUC
10Kodambakkam Power Houseகோடம்பாக்கம் பவர் ஹவுஸ்NoneElevatedUC
11Vadapalaniவடபழனி  Green LineElevatedUC
12Saligramamசாலிகிராமம்NoneElevatedUC
13Saligramam Ware Houseசாலிகிராமம் கிடங்குNoneElevatedUC
14Alwarthiru Nagarஆழ்வார்திருநகர்  Red LineElevatedUC
15Valasaravakkamவளசரவாக்கம்  Red LineElevatedUC
16Karambakkamகாரம்பாக்கம்  Red LineElevatedUC
17Alapakkam Junctionஆலப்பாக்கம் சந்திப்பு  Red LineElevatedUC
18Porur Junctionபோரூர் சந்திப்புNoneElevatedUC
19Porur Bypassபோரூர் புறவழிச்சாலைNoneElevatedUC
20Thelliyaragaramதெள்ளியார் அகரம்NoneElevatedUC
21Iyyapanthangalஐயப்பன்தாங்கல்Bus interchange Bus DepotElevatedUC
22Kattupakkamகாட்டுப்பாக்கம்NoneElevatedUC
23Kumananchavadiகுமணன்சாவடிNoneElevatedUC
24Karayanchavadiகரையான்சாவடிNoneElevatedUC
25Mullaithottamமுல்லைத்தோட்டம்NoneElevatedUC
26Poonamalleeபூவிருந்தவல்லிBus interchange Bus TerminusElevatedUC
27Poonamallee Depotபூவிருந்தவல்லி பணிமனைBus interchange Bus TerminusElevatedUC
28Poonamallee Bypassபூவிருந்தவல்லி புறவழிச்சாலைNoneElevatedUC
NAThirumazhisaiதிருமழிசைNoneTBAProposed Phase 3
NAKuthambakkamகுத்தம்பாக்கம்Bus interchange Bus TerminusTBAProposed Phase 3
NASriperumbudurதிருபெரும்புதூர்NoneTBAProposed Phase 3
NAParandurபரந்தூர்Airbase Chennai Greenfield AirportTBAProposed Phase 3

References

  1. Sekar, Sunitha. "104 km, 104 stations: Unveiling Phase II of Metro". The Hindu. Retrieved 24 January 2017.
  2. "Metro's second phase to go up to Poonamallee". The Hindu. Chennai: Kasturi & Sons. 20 July 2017. Retrieved 1 October 2017.
  3. U, Tejonmayam. "Metro to link route planned under monorail network". The Times of India. Retrieved 17 February 2019.
  4. Sekar, Sunitha. "Detailed project report for Phase II of Metro Rail ready". The Hindu. Retrieved 24 January 2017.
  5. U, Tejonmayam. "Chennai: Metro rail to trim stations under phase 2". The Times of India. Retrieved 24 January 2017.
  6. Dipak K, Dash. "Ground work for Chennai metro rail phase-2 hit". Times of India. Retrieved 19 February 2021.
  7. Sekar, Sunitha (26 December 2018). "CMRL mulls extending line to Tirumazhisai". The Hindu. Retrieved 1 January 2019.
  8. "Chennai Metro: Corridor-4 extension plans on cards". The New Indian Express. Retrieved 23 January 2021.
  9. "Metro Rail second phase likely to be completed in six years". The New Indian Express. Retrieved 26 April 2019.
  10. Sekar, Sunitha (11 March 2019). "Chennai Metro phase II to have three-coach and six-coach trains". The Hindu. Chennai: Kasturi & Sons. p. 2. Retrieved 1 May 2019.
  11. Sekar, Sunitha (25 April 2019). "For phase II, Chennai Metro will need less private land". The Hindu. Chennai: Kasturi & Sons. p. 3. Retrieved 2 May 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.