Line 5 (Guangzhou Metro)

Line 5 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Jiaokou running 31.9 km (19.82 mi) in a wide "∩" shape and ends at Wenchong. Like lines 4 and 6, it is equipped with linear induction motor technology. Line 5's color is red. Line 5 began operation on 28 December 2009, from Jiaokou to Wenchong.[4] On December 31, 2009, Line 5 set a record of 567,000 daily passengers, surpassing the ten year ridership projections in the span of just 4 days after its opening. As of May 2017, Line 5 carries an average of 1.05 million passengers per day and is extremely congested throughout the day, operating at over 100% capacity during rush hours.[5][6] The opening of Phase I of Line 13 further increased traffic demand on the west end of Line 5 and pushing congestion to over 130% capacity.[7] Prompting the Guangzhou Metro to limit passenger traffic at a number of subway stations on Line 5.[7] In 2018, the busiest section of Line 5 reaches over 50,000 pphpd of traffic volume during peak periods.[8] By 2019, the line was used by 1.18 million passengers each day.[2] In the future Line 13 Phase II will provide relief for Line 5.

Rush-hour congestion in January 2022 at Yuancun Station of Line 5.
Line 5
Line 5 train near Tanwei
Overview
Other name(s)L2 (5 lines plan name)
M3 (7 lines plan name)
M5 (2000 plan name)
Huanshilu line (环市路线)
StatusOperational
OwnerCity of Guangzhou
LocaleHuangpu, Tianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
Termini
Stations24
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Rolling stockCRRC Qingdao Sifang/Kawasaki Heavy Industries Metro cars[1]
Daily ridership1.18 million (2019 daily average)[2]
1.485 million (2019 Peak)[3]
History
Opened28 December 2009 (2009-12-28)
Technical
Line length31.9 km (19.82 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationThird rail, 1,500 V DC
(Overhead lines with same voltage installed in depot)
Route map

Extension (Under Construction)
Huangpu New Port
Xiagang
Baoying Dadao
 13  to Xinsha
Xiayuan
 13 
Miaotou
Shuangsha
Extension (Under Construction)
Wenchong
Dashadong
 7 
Dashadi
Huangpu railway
Yuzhu
 13 
 13  to Chaoyang
Yuzhu Depot
Sanxi
Dongpu
connection to Line 4
Chebeinan
 4 
 4 
Left arrow to Huangcun
to Nansha Passenger Port Right arrow
Keyun Lu
Yuancun
 11  ( 21  before 2024)
 21 
Left arrow to Zengcheng Square
Right arrow
Tancun
 19 
Liede
Zhujiang New Town
 3 
 3 
Left arrow to Tianhe Coach Terminal
to Panyu Square Right arrow
Wuyangcun
 10  Siyou Xinma Lu
Yangji Stream
Yangji
 1 
 1 
Left arrow to Guangzhou East Railway Station
to Xilang Right arrow
Zoo
 6  to Xiangxue
Ouzhuang
 6 
Taojin
 6 
Xiaobei
Guangzhou Railway Station
 2   11   14 
 2 
Left arrow to Jiahewanggang
to Guangzhou South Railway Station Right arrow
Xicun
 8 
 8 
Left arrow to Jiaoxin
to Wanshengwei Right arrow
Xichang
 13 
 13 
Left arrow to Chaoyang
to Xinsha Right arrow
Sima Creek
Zhongshanba
 11 
 6 
Tanwei
 6 
connection to Line 6
 6  to Xunfenggang
Jiaokou Bus interchange
Line 5
Simplified Chinese广州地铁5号线
Traditional Chinese廣州地鐵5號線

Opening timeline

Line 5 drawn to scale.
SegmentCommencementLengthStation(s)Name
Jiaokou — Wenchong 28 December 2009 31.9 km (19.82 mi) 24 (initial phase)

Stations

Station
No.
Station name Connections Distance
km
Location
English Chinese
5 01 Jiaokou 滘口 0.00 0.00 Liwan
5 02 Tanwei 坦尾  6  1.75 1.75
5 03 Zhongshanba 中山八  11  1.54 3.29
5 04 Xichang 西场  13  1.53 4.82
5 05 Xicun 西村  8  0.68 5.50
5 06 Guangzhou Railway Station 广州火车站  2   11   14   22 

 GS  Guangzhou railway station GZQ

1.58 7.08 Yuexiu
5 07 Xiaobei 小北 2.40 9.48
5 08 Taojin 淘金  12   13  (both via Jianshe Liumalu) 1.10 10.58
5 09 Ouzhuang 区庄  6  1.03 11.61
5 10 Zoo 动物园 1.09 12.70
5 11 Yangji 杨箕  1  1.05 13.75
5 12 Wuyangcun 五羊邨  10  (via Siyou Xinmalu) 1.06 14.81
5 13 Zhujiang New Town 珠江新城  3  0.76 15.57 Tianhe
5 14 Liede 猎德 1.15 16.72
5 15 Tancun 潭村 1.44 18.16
5 16 Yuancun 员村  21  (to be replaced by  11 ) 1.79 19.95
5 17 Keyun Lu 科韵路 1.55 21.50
5 18 Chebeinan 车陂南  4  1.37 22.87
5 19 Dongpu 东圃 1.37 24.24
5 20 Sanxi 三溪 1.55 25.79
5 21 Yuzhu 鱼珠  13  1.79 27.58 Huangpu
5 22 Dashadi 大沙地 1.55 29.13
5 23 Dashadong 大沙东  7  1.33 30.46
5 24 Wenchong 文冲 1.19 31.65

Future Development

An eastern extension to Huangpu New Port station[9] is currently under construction with opening scheduled in 2023. The extension is 9.76 km (6.06 mi) long, with 6 new stations.[10][11]

Station
no.
Station name[9] Connections Distance
km
Location
English Chinese
5 25 Shuangsha 双沙 Huangpu
5 26 Miaotou 庙头
5 27 Xiayuan 夏园  13  Guangzhou Bus Rapid Transit GBRT
5 28 Baoying Dadao 保盈大道
5 29 Xiagang 夏港
5 30 Huangpu New Port 黄埔新港

Rolling Stock

Line 5 uses six car linear motor trains. In 2020, Guangzhou Metro started bidding for 14 additional trains to supplement the fleet in preparation for the east extension.[12]

LCD passenger information display on a L7 series train.
Type Time of manufacturing Series Sets Assembly Notes
Type L 2008–2010 L2 30 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang and Itochu[13]
Type L 2011–2013 L4-I & L4-II 32 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang and Itochu[14]
Type L 2021–2022 L7 14 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Guangdong.[15]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.