Ovingham railway station
Ovingham railway station is located on the Gawler line.[1] Situated in the inner northern Adelaide suburb of Ovingham, it is located 3.6 kilometres (2.2 mi) from Adelaide station.
Ovingham | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
General information | |||||||||||
Location | Devonport Terrace, Ovingham | ||||||||||
Coordinates | 34°53′46″S 138°35′4″E | ||||||||||
Owned by | Department for Infrastructure & Transport | ||||||||||
Operated by | Adelaide Metro | ||||||||||
Line(s) | Gawler | ||||||||||
Distance | 3.6 km from Adelaide | ||||||||||
Platforms | 2 | ||||||||||
Bus routes | 230 to Port Adelaide 232 to Port Adelaide 235 to Kilburn 238 to Mawson Lakes 239 to Arndale Central | ||||||||||
Construction | |||||||||||
Parking | No | ||||||||||
Bicycle facilities | No | ||||||||||
History | |||||||||||
Opened | 1880s | ||||||||||
Closed | 2020 | ||||||||||
Rebuilt | 7 November 2022 | ||||||||||
Services | |||||||||||
|
History
The station opened in the early 1880s.
It is one of the very few stations in the network with no dedicated passenger parking. The station is serviced by two tracks. The two side platforms are accessible by pedestrian crossings at either end. The standard gauge line behind the Gawler bound platform is only used for interstate passenger and freight services. The station has two tin style shelters the same as at Kilkenny and Dudley Park .
Grade separation
Funding for a grade separation of Torrens Road and the Gawler line was announced in the 2019/2020 state budget, with a combined contribution of $231 million from the Federal and State governments.[2] The preferred design was revealed in June 2020 which would see an overpass built for Torrens Road to run over the Gawler line; the nearby intersection of Torrens and Churchill Roads would also be raised to meet the elevated height of Torrens Road. Major construction commenced in 2021 with anticipated completion in 2023.[3] The station itself was partly demolished in March 2022 during construction works, and remained closed when the Gawler line reopened in June 2022.[4] Ovingham station later reopened on 7 November 2022.[5]
Services by platform
Platform | Destination |
---|---|
1 | Gawler/Gawler Central |
2 | Adelaide |
References
- Gawler Central timetable Adelaide Metro 4 February 2013
- ""Notorious" level crossings targeted in State Budget". 17 June 2019. Archived from the original on 22 December 2020. Retrieved 22 December 2020.
- "Design set for $231M Ovingham Level Crossing Removal Project". 16 June 2020. Archived from the original on 22 December 2020. Retrieved 22 December 2020.
- "Gawler rail line reopens Sunday 12 June". Adelaide Metro. 6 June 2022. Retrieved 6 June 2022.
- "ALL ABOARD! Ovingham Station reopens after $15 million upgrade" (Press release). Government of South Australia. Department of Infrastructure and Transport. 7 November 2022. Archived from the original on 30 November 2022. Retrieved 30 November 2022.
External links
Media related to Ovingham railway station at Wikimedia Commons