Proposed high-speed rail by country
This article lists planned or proposed high-speed rail projects, arranged by country. Although many nations have done preliminary feasibility studies, many lines are eventually shelved or postponed due to high cost, and only a few nations of those proposing are actively building high-speed rail lines. Planned or proposed lines are therefore separated here from lines that are under construction, some nations having both. High-speed rail is public transport by rail at speeds in excess of 200 km/h (125 mph).[1]
Africa
African Integrated High Speed Railway Network
.svg.png.webp)
In 2013, the African Union passed Agenda 2063, a 50-year development trajectory which includes establishing a continental free trade zone, a common passport, an end to armed conflict, an annual African economic forum, a space program, a Great African Museum, establishment of e-universities, and a continent-wide high speed rail network.[2] Africa currently has the lowest rail density of all the inhabited continents, with 16 African countries lacking rail altogether, especially in Central Africa; most existing rail lines are single-track freight lines operating at 30 km/h which beeline from ports to industrial zones like mines and forests.[3]
The AU signed a Memorandum of Understanding with China in 2014 for the 30-50 year development of the continental rail system connecting all continental African capitals using modern rail technology,[4] and facilitate interoperations by using a single gauge as opposed to the current nine.[3] The goal of a high speed rail network is to facilitate intra-African trade and lower shipping costs. The initial timeline for 2022 was to have 100% of the preparatory work complete, but currently only 12.3% of the network has been studied,[5] largely due to funding constraints.[3] Pre-feasibility studies which have been completed so far include the Cotonou-Niamey-Ouagadougou-Abidjan Railway at 2891 km which would cost US$5.022 billion to build and rehabilitate, and US$866 million for equipment.[3] The Djibouti-Libreville corridor was estimated to be 2366 km and cost US$5.277 billion, and the Dakar-N'Djamena-Djibouti corridor was estimated to be 5139 km and cost US$14.05 billion.[3] It has not yet been specified which rail lines will operate at 330 km/h, 250 km/h, and 160 km/h.
The Masterplan 2033 plans for 35,828 km of rail construction in Africa with the following projects. The first three are accelerated pilot projects actively under study/construction. The objectives by 2033 are to connect sixteen landlocked countries to sea ports, to provide interconnections between different regions, and provide Trans-Africa corridors.[6] The Master Plan 2043 will expand on this network to connect all political and economic capitals by rail.[7][6]
A: Accelerated Pilot Projects
- Kigali-Dar Es Salaam (1476 km)
- Kampala-Bujumbura (596 km)
- Walvis Bay-Windhoek-Gaborone-Johannesburg (1643 km)
B: Pilot Projects, as part of the 2033 Master Plan
- Tunis-Algiers-Casablanca (1981 km)
- Douala-Bangui
- Kampala-Nairobi
- Dakar-Bamako (1147 km)
- Asmara-Addis Ababa (771 km)
- Lusaka-Beira
- Alexandria-Khartoum
- Ouagadougou-Abidjan (1120 km)
- Niamey-Cotonou (955 km)
C: 2033 Master Plan
- Nairobi-Mombasa (459 km)
- Bamako-Ouagadougou-Niamey-N'Djamena-Khartoum (5384 km)
- Addis Ababa-Djibouti (637 km)
- Pointe Noire-Brazzaville-Kinshasa-Bujumbura (1755 km)
- Johannesburg-Maputo (524 km)
- Pretoria-Durban (626 km)
- Algiers-Abuja-Lagos (4111 km)
- Lobito-Lusaka (2253 km)
- N'Djamena-Bangui-Brazzaville-Luanda (2240 km)
- Addis Ababa-Nairobi-Dodoma-Lusaka-Gaborone (4812 km)
- Khartoum-Addis Ababa
- Luanda-Windhoek (1882)
- Mbeya-Lilongwe-Harare-Johannesburg-Maseru (3115 km)
- Lilongwe-Nacala (815 km)
- Lamu-Juba (1547 km)
- Bangui-Juba (1551 km)
- Juba-Kampala (672 km)
D: 2043 Master Plan
- Alexandria-Benghazi-Tripoli-Tunis (2770 km)
- Casablanca-Laayoune-Nouakchott-Dakar (2733 km)
- Dakar-Banjul-Conakry-Monrovia-Abidjan-Accra-Lagos-Douala (7595 km)
- Yaoundé-Bata-Libreville (594 km)
- Mogadishu-Addis Ababa
- Windhoek-Cape Town (1632 km)
- Maseru-Cape Town (1135 km)
- Tripoli-N'Djamena (2437 km)
Algeria
In 2012 the Administration of Algeria Railway (ANESRIF) began building a double-tracked 142 km electric high-speed railway reaching speeds of 220 km/h from Oued Tlélat (Oran), with stops in Sidi Bel-Abbès and Tlemcen, and is 80% complete in fall 2021, with 129 viaducts totaling 14 km and 3 tunnels totaling 1.5 km. The project was due to be finished in 2019, but faced delays due to problems with land acquisition and due to COVID-19, and is set to open by the end of 2021.[8] In 2015, the administration started building the extension from Tlemcen to Akkid Abbas (Maghnia) on the Moroccan border, a total of 56 km designed for 220 km/h journeys, but is only 7% complete as of fall 2021, largely due to land acquisition controversies in Tlemcen and Mansourah.[9][10] This section will contain the largest viaduct in Africa, the M'dig Viaduct over the Isser river, (near Aïn Fezza), which will be 130 meters high, and 1.8 kilometers long,[8] and a 600m tunnel into downtown Tlemcen, which will boast a renovated train station.[11] The whole 198 km project is estimated at 2 billion euros.
Egypt
On 12 March 2018, Egypt's Transport Minister Hisham Arafat said that Egypt is in the process of launching a new high-speed railway linking the Mediterranean (Most likely referring to the northern coastal governates like Alexandria, Beheira) and the Red Sea with the participation of more than 10 international companies.[12][13]

In September 2020, a Chinese-Egyptian consortium consisting of the China Civil Engineering Construction Corporation and the Egyptian Samcrete and the Arab Organization for Industrialization won a US$9 billion to build a 543-km-long high-speed railway capable of top speeds of 250 km/h. The electric-powered trains would be manufactured in Port Said with a Chinese technology transfer to Egypt.[14]
The first 660 km was planned to begin at Mersa Matruh[15] on the Mediterranean Sea, pass through Al-Alamein, Borg El Arab, then to Wadi El Natroun, on to the 6th October City, through southern Cairo to the New Administrative Capital, and end in Ain Sokhna on the Gulf of Suez of the Red Sea, As of January 2021, surveying and route planning have been completed and construction is underway to build bridges and track.[16] This initial segment is intended to be used for both passengers and freight, and is projected to cost US$3 billion with a completion date of 2023. On 14 January 2021, a Memorandum of Understanding was signed between Siemens Mobility and the National Authority of Tunnels, an authority under the Ministry of Transportation of Egypt to design, install, and maintain Egypt's first high-speed rail system.[17][18] The initially-dubbed "second line" between Alexandria and Borg El Arab was combined into this contract, and both are under construction as of 2022.[19] The Siemens-led consortium was awarded a $4.5 billion contract to build the lines from Ain Sokhna to Marsa Matruh and to Alexandria in September 2021, and is scheduled for completion in 2027.[20] The line will be outfitted with Velaro high-speed passenger trains. This 660 km segment will be designed to carry up to 30 million passengers annually, cut travel times in half, and cut carbon emissions by 70%.[21] In February 2023, French construction company NGE signed a contract to build 330 km of the line between Ain Sokhna and Borg El Arab with 100 turnouts.[22]
A second line will stretch from Sixth of October City through Fayoum, Minya, Aswan, and Abu Simbel over 1,100 km on the west bank of the Nile.[23] Local stations will include Al-Ayat, Al-Fashn, Al-Adwa, Bani Mazar, Samalout, Abu Qurqas, Mallawi, and Dayrout.[24] Survey and construction work for this line began in March 2022 by Egyptian authorities, especially around 6 October City and Fayoum, with an anticipated design speed of 250 km/h, but preliminary operation of express trains at 230 km/h.[24] An extension of this line was announced in May 2022 from Aswan through Abu Simbel to Toshka and Sharq El Owainat in the Western Desert, as well as an extension to Wadi Halfa, in Sudan.[25][26] The Kuwait Fund for Arab Economic Development signed a $2.45 million feasibility study for a 283.5 km line from Aswan to Toshka and Abu Simbel, as well as the 80 km extension to Sudan, which includes a 6 km bridge across Lake Nasser.[27][28] In early 2023, the Transport Ministry affirmed that President Abdel Fattah al-Sisi approved the extension from Aswan to Abu Simbel with five high-speed rail stations and seven regional stations planned between Luxor and Abu Simbel.[29]
The third line is planned in the south from Safaga through Sahl Hasheesh, Hurghada, East Sohag, Qena, and Qus, ending in Luxor, at a total cost of $2.7 billion with a construction time of two years.[30] Contracts for building the second and third lines were planned to be signed by Siemens in March 2022; the 8.1 billion euro contract was signed on May 31, 2022 between the Egyptian government and Siemens (and its consortium partners Orascom Construction and The Arab Contractors), and includes the construction of the second and third line as well as 41 Velaro 8-car high-speed passenger trains, 94 Desiro high-capacity four-car regional train sets, and 41 Vectron freight locomotives, as well as ETCS Level 2 and a suitable power grid.[31]
The entire network is projected to cost US$23 billion and span over 2000 km.[18][23]
Intent to build an extension eastwards from Marsa Matruh through El Negaila to Sallum on the Libyan border, to Benghazi in Libya, was announced by Egyptian Transport Minister Kamel Al-Wazir in November 2020, and was again confirmed by the Libyan-Egyptian Chamber of Commerce on 18 January 2021.[32] An extension to Siwa was also mentioned.[26] Al-Wazir reiterated the Egyptian government's commitment to future extensions to Wadi Halfa in Sudan and Benghazi in Libya in March 2023 at the World High Speed Rail Conference in Marrakesh.[33] This is part of the Egyptian government's larger plan to build political and economic links with both Libya and Sudan, including to Wadi Halfa.[26][34]
Libya
Prior to the 2011 Libyan Revolution, the government under Gaddafi was actively building a high-speed rail line capable of 200 km/h operation from the Tunisian border to the Egyptian border, at a total cost of $7.9 billion. Russian Railways had won the $2.9 billion deal for the section between Sirte and Benghazi, with an anticipated completion in 2012; at least 14 km out of the planned 554 km line was laid.[35] China Railway had been working on a $2.6 billion link between Sirte and Khums, with plans for extension westwards to Tripoli. In 2010, the Libyan government proposed a feasibility study for a $2 billion high-speed rail line between Benghazi and Tobruk, expected to be completed by 2012. Trains were to run on diesel, with eventual electrification planned. Dorsch Afrique was also involved in designing the 150 km high-speed connection between Tobruk and Umm Saad on the Egyptian border.[36] Three kilometers of high-speed track were finished, including a station in Tripoli and one kilometer of tunnels, and thirty kilometers of right-of-way had been cleared in 2003. The rail line was subsequently plundered for its steel during the civil war.[37]
The Libyan government has tried to resume the project several times. In 2015, Prime Minister Abdullah al-Thinni visited Moscow and set up a commission to review the project.[38] In 2018, the Libyan government approached Russia to resume construction on the Sirte-Benghazi line, and Russian Railways responded that Tripoli would have to compensate the company for costs incurred after the project was halted in 2011.[39] In January 2021, the Egyptian government announced plans to extend its proposed high-speed link from Alamein through El Salloum to Benghazi in Libya.[40]
Morocco

A trans-Maghreb high-speed rail line linking Morocco, Algeria and Tunisia is being planned. The project is expected to begin in Morocco and move towards Algiers, and finally reach Tunis.[41] However, the difficult historical relations between Morocco and Algeria make the project not immediate. Part of this project line has opened as of November 2018 in the high-speed rail Al-Boraq, that service between Casablanca and Tangier, in Morocco and is the first of its kind on the African continent.
By 2040, Morocco additionally is planning to build a route from Kenitra to Marrakech for 40 billion MAD/~$4 billion (upgrading the current Kenitra-Casablanca segment to high-speed), and to build a route from Marrakech to Agadir for 50 billion MAD/~$5 billion.[42] China Railway Corporation has expressed interest in the latter project to the Moroccan government in the summer of 2021.[43] In March 2022, following completion of the design studies for the Marrakech-Agadir project, a Korea National Railway-led consortium secured a $32 billion contract with ONCF (Moroccan National Railways) for section three of the planned 230 km line.
The ONCF has announced plans to also build high-speed rail between Rabat-Fez-Oujda, on the Algerian border, by 2040.[44] With initial feasibility studies completed, in July 2022 the ONCF announced that the first section (Rabat-Khemisset-Meknes) has begun environmental and social review, spurred by the ongoing success of the already-built sections between Tangier and Casablanca.[45]
Namibia
As of 2020, the Namibian government is undertaking a detailed feasibility and design study to plan a line between the port in Walvis Bay through Windhoek to Gaborone (Botswana) and Pretoria (South Africa), as part of the African Union Agenda 2063. Construction would begin in 2023 at soonest.[46]
Sudan
A 250 km/h rail link from the Egyptian city of Aswan to Wadi Halfa in the north of Sudan has been proposed.[26] The $2.5 million feasibility study was signed with Kuwaiti investment in April 2022.[47] A further standard-gauge extension from Halfa to Khartoum has been proposed to give travelers from there a one-seat ride to Alexandria.[48]
Tunisia
The Tunisian government and Tunisian Railways (SNCFT) are currently planning a high speed rail in three parts: a new 180 km line from Ras Jedir on the Libyan border to Gabès, to be built to 250 km/h for passenger trains and 120 km/h for freight, estimated to cost TND 2.6 billion ($917 million). The second phase will continue from Gabès through Sfax, Sousse, Nabeul, Tunis, and finish in Bizerte, a 480 km segment that will involve both new track and upgrading existing lines, for an estimated TND 14 billion ($4.9 billion). The third phase will involve an upgrade of the current line between Tunis and Tabarka on the Algerian border, a 180 km segment whose cost is estimated at TND 9.4 billion ($3.3 billion). The total cost of the 840 km electrified standard gauge line traversing the country is estimated by the Tunisian government to be TND 26 billion ($9.2 billion), as of fall 2021.[49] No concrete action seems to have been taken beyond initiating a discussion of a partnership by the Tunisian president, Kaïs Saïed, with French president Emmanuel Macron on 22 June 2020.[50] The following year in June 2021, President Saïed attempted to secure a loan from the European Investment Bank to finance the project, which was refused as the country had already borrowed 7 billion DT ($2.3 billion) in the prior decade; the bank suggested upgrading current rail infrastructure instead.[51]
South Africa
On 7 June 2010, Minister of Transport Sbusiso Ndebele said that plans were seriously being considered for a high-speed line from Johannesburg to Durban. The line would reduce the current journey time from 12 hours to about 3 hours. The 721 km line would involve major engineering challenges, including traversing the Drakensberg mountains. A high-speed line from Johannesburg to Cape Town is also under study.[52][53] The $30 billion plan was seriously discussed with China Railway Group which wanted South Africa to contribute 40% of the capital, while South Africa was hoping that Chinese banks would provide a loan for the project.[54] As of 2020, South Africa's Department of Transport announced plans to establish a high speed rail network in the country by 2025, specifically between Pretoria, Johannesburg, and Durban.[55] The importance of this freight corridor was affirmed in Parliament in July 2021, the Chinese ambassador to South Africa confirmed in April 2022 its intent to collaborate in building a passenger/freight rail link between Johannesburg and Durban, but there remain significant questions about funding.[56] In fall 2022, South African President Cyril Ramaphosa outlined a National Rail Act to provide financing for feasibility studies.[57]
Americas
Argentina
A Buenos Aires–Rosario–Córdoba high-speed railway was planned,[58] operating at speeds of 320 km/h (200 mph). Construction was scheduled to begin in 2008 and work was expected to take around four years, but the project is currently "on hold" due to the financial crisis.[59]
The project would join the cities of Buenos Aires and Rosario at a distance of 286 km (178 mi) and Córdoba at a distance of 710 km (440 mi).[60]
Other projected high-speed rail lines include:
- Buenos Aires-Mar del Plata (400 km [250 mi]): A new line to the seaside beach resort city and major fishing port of Mar del Plata,[61] 400 km (250 mi) south of Buenos Aires city is in the planning stages.
- Buenos Aires-Mendoza (1200 km [750 mi]) (Planned).[62]
Brazil
The Rio-São Paulo High Speed rail (Portuguese: Trem de Alta Velocidade Rio-São Paulo; Abbreviation: TAV RJ-SP) is a high-speed rail proposal with the purpose of connecting Brazil's two largest metropoleis: São Paulo and Rio de Janeiro with an extension to Campinas, another metropolis conurbated with São Paulo and 100 km distant from it.[63][64] The proposed route is through one of Brazil's most mountainous and urbanized terrains resulting the need of around 40% of the tracks to be built through viaducts, bridges and tunnels. Such massive need of structures has made the proposed project's price spike to US$16 billion.[65]
Proposed:
- Brasília – Goiânia – Rio Verde – Itumbiara – Uberlândia – Uberaba – Ribeirão Preto – Campinas – São Paulo – Rio de Janeiro (1200 km).
- Belo Horizonte – São Paulo (594 km).
- Curitiba – São Paulo (410 km).
- Santos – São Paulo (80 km).
- Brasília – Goiânia (200 km).
Track gauge: 1,435 mm (4 ft 8+1⁄2 in) (standard gauge)
Proposed commercial speed: 350 km/h
Government mandatory stations: Rio de Janeiro Centre, Rio de Janeiro Intl Airport, Volta Redonda/Barra Mansa, São José dos Campos, São Paulo/Guarulhos Intl Airport, São Paulo Centre, São Paulo/Viracopos Intl Airport and Campinas Centre.
Cancelled due to current economic recession.
Canada
Although Canada does not currently have high-speed rail lines, there have been two routes frequently proposed as suitable for a high-speed rail corridor:
A possible international high-speed rail link between Montreal and Boston or New York City is often discussed by regional leaders, though little progress has been made.[66][67] On another international line between Vancouver and Seattle, work is in progress to improve the existing Amtrak Cascades service, though it will not reach speeds normally associated with high-speed rail. In Ontario, the Conservative Government elected in 2018 postponed its decision on high-speed lines, but still hopes to make efforts in that direction.
Chile
A "high-speed" 200 km/h rail connection between Santiago and Valparaíso was first proposed in 2018 by China Railway Group and again in 2019 by Spanish-based FCC and Talgo via an alternate route through Limache and Til Til. The project was initially planned to open in 2024, but was suspended in 2021 because of the Covid-19 pandemic.[68] Either plan would cost between $2–4 billion, which Pedro Pablo Errazuriz, head of the Chilean state-owned rail firm EFE, said was too expensive to make a priority in 2022.[69] However, in May 2022, President Gabriel Boric's administration has reiterated that the project is a priority for the government, and called for proposals by mid-year.[70]
Colombia
The Colombian National Agency of Infrastructure[71] (ANI) was interested in building a High Speed rail link as part of Colombia's '4G Modernization'. The Transport Minister had said that plans and studies for the bullet train would commence in 2015. However, Colombia has the smallest train ridership of any large Latin American nation. There have been many proposals since the 1990s when Japanese firms wanted to build a bullet train network from Bogota to nearby cities, but the project was cancelled.
Mexico
The Secretariat of Communications and Transport of Mexico originally proposed a high-speed rail link[72][73] that would transport passengers from Mexico City to Guadalajara, Jalisco, with stops in the cities of Querétaro, Guanajuato, Leon and Irapuato; and a connected line running from the port city of Manzanillo to Aguascalientes. The train which would travel at 300 km/h[74] allows passengers to travel from Mexico City to Guadalajara in just 2 hours[74] at an affordable price (the same trip by road would last 7 hours). The network was planned to connect the network to Monterrey, Chilpancingo, Cuernavaca, Toluca, Puebla, Tijuana, Hermosillo, Cordoba, Veracruz, Oaxaca, Colima, Zacatecas, Torreon, Chihuahua, Puebla, San Luis Potosi, Mexicali Saltillo and Acapulco by 2015, but nothing had materialized by 2020.[72] The whole project was projected to cost 240 billion pesos, or about 25 billion dollars.[72] In 2005, Mexican billionaire Carlos Helú expressed an interest in investing in high-speed rail.[75] Most recently the Yucatan Peninsula in Mexico has highlighted as one of the most probable areas for the development of high-speed rail in Latin America with the Transpeninsular Fast Train for bidding in September 2011.[76]
By 2014 the route for the 1st phase of the Mexico City-Guadalajara HST had been selected. This 1st stage was to have operated from the Buenavista station in Mexico City to Querétaro with a length of 212 km of high speed line.[77] The HST was to have been further extended into the city of Guadalajara with an immediately extension after the 1st stage to the cities of Celaya, Salamanca, Irapuato and Leon. The 1st phase was to have been completed by 2018.[78]
The first High Speed Line in Latin America had been announced in July 2014 with the opening of an international tender to build a passenger train linking Mexico City and Querétaro at up to 300 km/h, moving 23,000 passengers a day. The line was to have been extended over 210 km, with construction beginning that year and operations starting in the second half of 2017.[79]
On 6 November 2014, Mexico's president announced that the proposed bullet train was being postponed because there was only one bidder. Falling oil prices and the economic downturn was also believed to have played a role in the decision.[80] In July 2018, Mexican President Andrés Manuel López Obrador revived the project,[81] and in 2020 the Mexican government secured a 51.3 billion peso investment (US$2.3 billion) to fund the high speed rail project.[82] As of 2022, 80 million pesos (US$3.93 million) have been allocated for initial feasibility studies, with the remaining funds planned through 2025.[83]
In 2021, Mexican rail officials began a US$2 million feasibility study for a rail connection between San Antonio (US) and Monterrey (Mexico); unlike previous US$20 billion proposals for the line to be built for 250 mph (400 km/h) operation, this US$7 billion proposal examines a 100 mph (160 km/h) route which would take 4 hours.[84]
Panama
In 2019, China approached the Panamanian government with a feasibility plan for a 391 kilometer (243 mile) high speed line from Panama City to David, on the Costa Rican border.[85] This would have been financed partially under China's Belt and Road Initiative. The project was dismissed by the Panamanian president Laurentino Cortizo in September 2019, who stated that taking on the project would be a debt overload.[86]
United States

There are several high-speed rail services in the United States, notably the Acela Express, but all are limited to the Northeast Corridor.[87] Amtrak uses the Acela Express as a high-speed service between Washington, D.C. and Boston via New York City and Philadelphia along the Northeast Corridor (NEC) in the Northeast United States. The tilting design allows the train to travel at higher speeds on the sharply curved NEC without disturbing passengers, by lowering lateral forces. The Northeast Regional goes along the same route, but with more stops. All other high-speed rail services share part of the route.
There has been a resurgence of interest outside the Northeastern Corridor in recent decades, with many plans being examined for high-speed rail across the country:
- In 2002, the Texas High Speed Rail & Transportation Corporation (THSRTC), a grass roots organization dedicated to bringing high-speed rail to Texas, was established. In 2006, American Airlines and Continental Airlines formally joined THSRTC in an effort to bring high-speed rail to Texas as a passenger collector system for the airlines.
- A separate entity, Lone Star High-Speed Rail LLC, was formed in 2009 to plan a railway between Dallas and Houston. The company changed its name to Texas Central Railway in 2013, and has been developing the system based on technology used on Japanese Shinkansen lines. The 240-mile (390 km) route traverses open farms and ranches with one intermediate stop in the Brazos Valley. Regulatory approvals cleared in September 2020;[88] the service is expected to begin in 2026.[89][90]
- The California High-Speed Rail Authority was created in 1996 by the state to implement an extensive 800-mile (1,300 km) rail system that is estimated to cost about $40 billion. Once built, the system will not require operating subsidies, and it is expected to generate $1 billion in annual profits. Construction has been approved with the passing of proposition 1A, in which a $9.95 billion general obligation bond was authorized by voters. The system would provide high-speed service between and among major cities, like Sacramento, San Francisco, Los Angeles, and San Diego, and would allow travel between Los Angeles' Union Station and San Francisco's Transbay Terminal in two and a half hours. On 2 December 2010, the California High-Speed Rail Authority announced the first section of the Californian High-Speed Rail network had been selected and construction was to start in 2012, but delays postponed it to 2015. The line will run from near Madera south to Bakersfield, with stations at Fresno and Hanford, at a length of 105 kilometres (65 mi) running through a rural part of the San Joaquin Valley. The line will connect with traditional Amtrak lines at each end.[91] In December 2010, that funding was doubled after the newly elected governors of Ohio and Wisconsin decided to cancel right of way projects which had been allocated $1.2 billion of funding by the federal government. Of that amount, $616 million was then granted to California in addition to funding already promised, which, when combined with a state bond issue to match the new funding, provided over $1.2 billion in addition funding. This will be used to add an additional 88 kilometres (55 mi) of track, bringing the line to the edge of Bakersfield.[92]
- Brightline West, a project of Fortress Investment Group, is a line planned to be built between Los Angeles, California and Las Vegas, Nevada with trains running up to 200 miles per hour (320 km/h). Started as an independent venture in 2005, the project changed hands several times before being acquired by Brightline, who had recently begun their initial Florida route. Construction is expected to start in 2023 with service to commence in 2027.[93]
- In September 2010, Amtrak unveiled proposals for 355 km/h (221 mph) trains to run between Washington, D.C. and Boston, stopping at various cities along the way, including Baltimore, Philadelphia, and New York. The end-to-end journey time would be three hours. The proposals would cost $117 billion and would take 25 years to complete. Amtrak estimates that the capacity would be needed, as, even after current investment programs, the Acela trains will be full by 2030. The proposal envisages completion by 2040.[94]
- North American High Speed Rail Group is seeking to build a privately financed high speed rail line between Rochester and Minneapolis-St. Paul. The line is expected to cost $4.2 billion to build. The eventual goal is to extend high-speed rail service to Chicago.[95]
Asia
Bangladesh
Bangladesh considered building a high speed rail link between Dhaka and Chittagong in 2005. The government short-listed France's SNCF and Japan Railways for the project.[96] But the plan was then shelved. Spain and China had later, in 2014, expressed interests in developing the Bangladesh Railway into a high-speed network.[97] In summer of 2021, the Chinese ambassador in Dhaka, Li Jiming, stated that China was interested in investing in the construction of the line.[98] In March 2022, Russian-based RZD International approached Bangladesh Railway about financing the project, for which feasibility and design studies have already been completed; the 225 km route would cost an estimated $11.1 billion.[99] In June 2022, the Chinese ambassador to Bangladesh, Li Jiming, expressed interest in the project and wrote to Railways Minister Nurul Islam Sujan for accelerated negotiation of signing a memorandum of understanding between China Railway Group and Bangladesh Railways under a government-to-government Public Private Partnership.[100]
The economic feasibility has a good outlook: 90% of the country's trade runs through Chattogram port, and 80% of exports run on the current Dhaka-Chattogram highway, giving strong incentive to create a usable freight rail line. A 300 km/h direct passenger journey would hover at 55 minutes, increased to 75 minutes with intermediate stops in Narayanganj, Cumilla, and Feni; the current travel time is six hours.[100] In February 2023, Whip Iqbalur Rahim promised a bullet train between Dinajpur and Dhaka by 2027 if the Awami League comes to power.[101]
Cambodia
In December 2021, Prime Minister Hun Sen confirmed that the government of Cambodia is interested in high-speed-rail, with a feasibility study for upgrading the current standard line from Phnom Penh to Sihanoukville (266 km), and from Phnom Penh to Poipet (386 km).[102] He also stated intent to build new rail lines by continuing from Poipet through Siem Reap to Kampong Thom, and building a line from Phnom penh to Bavet on the Vietnamese border.[103] The current railways can only run between 20–30 km/h, largely due to damage from the civil war in the 1970s, and the line to Sihanoukville was rehabilitated in 2016, while the line to Poipet was only rehabilitated in 2018, which reconnected to the Thai rail network across the border in 2019.[104] The country's prime minister has assigned the Minister of Public Works and Transport with the task of finding an international development partner.[105] In early 2023, the Cambodian Prime Minister Hun Sen journeyed to China and signed a $44 million agreement (Yuan 300m) with CCP general secretary Xi Jinping, Chinese premier Li Keqiang and NPCSC chairman Li Zhanshu to upgrade the Phnom Penh-Poipet railway to 160 km/h operation following the results of the CRBC feasibilty study on the line, a project which is estimated to cost $4 billion in total.[106][107]
India
The Ministry of Railways under Government of India has proposed to build about 5,090 km (3,160 mi) route length tracks of High Speed Rail lines across eight corridors, with average operating speeds of 320 km/h (200 mph). Four more corridors are currently under consideration to be proposed under the National Rail Plan 2022, which will increase the number to 12 corridors, bringing the total length to 8,110 km (5,039 mi).[108] Formation of National High Speed Rail Authority (NHSRA), a body that will look after the implementation on High Speed Rail in India had been announced in Rail budget of 2012–2013, although no firm date has been set for construction initiation or completion. Central Japan Railway Company has promoted the Shinkansen for India,[109][110] while France has also shown interest in collaboration for long-term development of the Pune-Mumbai-Ahmedabad route.[111] Spain's Talgo has also expressed interest in the projects, and plans to open an office in India to promote its technology.[112]
In collaboration with Japan, India is building its first high-speed railway, the Mumbai–Ahmedabad high-speed rail corridor, on a 508 km (316 mi) long route between Mumbai and the western city of Ahmedabad. On 12 December 2015, India and Japan signed a deal for a US$15 billion deal to build a high-speed line between Mumbai and Ahmedabad. Japan will provide a very low interest loan of US$12 billion. This deal was part of a greater Memorandum of Understanding (MoU) involving transfer of defense technology and civil nuclear cooperation among others.[113] Pre-construction preparatory work began in the third quarter of 2017, and was expected to be completed in December 2023.[114] However, due to slow land acquisition in Maharashtra and due to the ongoing COVID-19 pandemic, which caused lack of labor and resulted in delays in work, the expected date of completion for the corridor's portion from Surat to Bilimora in Gujarat is now delayed to 2026, while the entire corridor will be completed by October 2028.[115][116] The National High Speed Rail Corporation (NHSRC) plans to operate the E5 Series Shinkansen trains at speeds up to 320 km/h (200 mph). It is expected to cost about ₹1.1 trillion (equivalent to ₹1.3 trillion or US$16 billion in 2020), of which 81% is financed by the Japan International Cooperation Agency.[117]
The Government of Kerala has proposed in constructing a high-speed rail corridor by the name of Silverline to carry both freight and passengers along the length of the state, from Kasargod in the north end to Kerala's capital, Thiruvananthapuram in the south end. The 532 km (331 mi) project reduces the current travel time of 12 hours to just under 4 hours from north to south with a maximum designed speed of 220 km/h (140 mph), versus the current average speed of 45 km/h.[118] The project is estimated to be completed by 2025 and is expected to cost ₹0.66 trillion (US$8.3 billion).[119] The Kerala government and the Union Ministry of Railways (jointly: Kerala Rail Development Corporation) plan intermediate stations in Kannur, Kozhikode, Tirur, Thrissur, Cochin Airport, Ernakulam, Kottayam, Chengannur, and Kollam; of the 1383 hectares needed for the project, 1198 are private land, and the project would displace 30,000 families.[118] Other criticisms of the project include the plan for standard gauge in a system that uses Indian gauge, low ridership estimates, hydrological problems, and stations distant from the city centers.[120] The project missed the mid-July 2022 deadline for completing the social impact assessments for the line, having only consulted 45 out of 190 villages involved, leaving the project in legal limbo in front of the Kerala High Court.[121] The Minister of Railways of India expressed his doubts about the feasibility of the Silver Line project on 29 July 2022.[122]
A third high speed rail project between Delhi and Varanasi is under construction and will cover an 813 km distance in less than 4 hours, at a speed of 330 km/h (compared to the 10 hour journey today).[123] The project is planned to have service at 22 minute intervals with thirteen stations, including Delhi (Kale Khan), Noida, Jewar Airport,[124] Mathura, Agra, Etawah, South Kannauj, Lucknow, Ayodhya, Rae Bareli, Prayagraj,Bhadoi, Banaras, and Varanasi, with a railway bridge over the Ganges River.[125]
A fourth high speed rail project proposed by the Karnataka state government would run 485 km from Mysuru (Mysore) through Bengaluru (Bangalore) to Chennai, cutting the current 9 hour journey to 3 hours (45 minutes between Mysuru and Bengaluru), at a cost of ₹1.15 trillion (US$14 billion).[126] As of summer 2022, the Karnataka government has begun acquiring land for the right of way, and is awaiting a Memorandum of Understanding with neighboring state Tamil Nadu to facilitate land acquisition for the project.
The network is proposed to have top speeds of 300–350 km/h (186–217 mph), and are envisaged to run on elevated corridors to isolate high-speed train tracks and thereby prevent trespassing. The current conventional lines between Amritsar-New Delhi, and Ahmedabad-Mumbai runs through suburban and rural areas, which are flat and have no tunnels. The Ahmedabad-Mumbai line runs near the coast and therefore, has more bridges, and parts of it are in backwaters or forests. The 1987 RDSO/JICA feasibility study found the Mumbai-Ahmedabad line to be the most promising.[127]
Under Construction
Approved
Proposed
High-speed Corridor | Speed | Length | Further extension | Status | Planned opening (According to NRP) [128] | ||
---|---|---|---|---|---|---|---|
km/h | mph | km | mi | ||||
North India[129] | |||||||
Delhi–Varanasi high-speed rail corridor | 320 | 200 | 865 | 537 | DPR* under preparation | 2031 | |
Delhi–Amritsar high-speed rail corridor | 320 | 200 | 480 | 300 | (Via Chandigarh) | Approved[130] | 2051 |
Delhi–Ahmedabad high-speed rail corridor | 320 | 200 | 886 | 551 | (Via Udaipur) | Land acquisition to begin | 2031 |
Amritsar–Jammu high-speed rail corridor | 320 | 200 | 190 | 120 | (Via Pathankot) | Proposed[131] | 2051 |
East India | |||||||
Varanasi–Howrah high-speed rail corridor | 320 | 200 | 711 | 442 | (Via Patna) | DPR under preparation [132] | 2031 |
Patna–Guwahati high-speed rail corridor | 320 | 200 | 850 | 530 | Proposed | 2051 | |
West India | |||||||
Mumbai–Ahmedabad high-speed rail corridor | 320 | 200 | 508.18 | 315.77 | (Via Surat, Bilimora) | Under Construction | 2026 (Surat-Bilimora)
2028 (full completion) |
Mumbai–Nagpur high-speed rail corridor | 320 | 200 | 736 | 457 | (Via Nashik, Aurangabad) | DPR under preparation | 2051 |
Mumbai–Hyderabad high-speed rail corridor[133] | 350 | 220 | 711 | 442 | (Via Pune, Solapur) | DPR under preparation | 2051 |
Pune–Nashik Road line[134] | 200 | 120 | 235.15 | 146.12 | (Via Narayangaon, Sangamner) | Land acquisition initiated | 2027 |
Ahmedabad–Rajkot high-speed rail corridor[135] | 220 | 140 | 225 | 140 | (Via Limbdi) | DPR Prepared | TBD |
Central India | |||||||
Nagpur–Varanasi high-speed rail corridor | 320 | 200 | 855 | 531 | Proposed | 2041 | |
South India | |||||||
Chennai–Mysuru high-speed rail corridor | 320 | 200 | 435 | 270 | (Via Bengaluru)[130] | DPR under preparation | 2031 |
Hyderabad–Bengaluru high-speed rail corridor | 320 | 200 | 618 | 384 | Proposed | 2041 | |
Silver Line (Thiruvananthapuram–Kasaragod)[136] | 200 | 120 | 529.45 | 328.98 | (Via Ernakulam) | DPR Prepared | TBD |
Total | |||||||
15 corridors | Average speed : ≈300 kmph | 8,834.78 | 5,489.68 | – | 0/15 | 2051 |
*DPR = Detailed Project Report
Indonesia
Since 2006, Indonesian authorities have expressed an interest in high-speed rail for the densely populated island of Java, probably linking the cities of Jakarta, Bandung, and Surabaya.[137] Since 2008, government with Japan International Cooperation Agency (JICA) and Japan Transportation Consultant has done pre-feasibility study. The Jakarta-Surabaya High-Speed Rail is 685 km (425 mi) long. It will connect both the cities in 35 minutes (compared with current 2 hours 53 minutes) with a maximum speed of 350 km/h and average speed 300 km/h. The construction project will need US$14.3 billion, exclude land acquisitions and detail engineering design, so the total cost predicted was $20 billion.

In July 2015, Indonesian Government revealed their plan to build high-speed rail in Indonesia.[138] Japan and China competed to win the project, previously both nations have done comprehensive studies on the project. On late September 2015, Indonesia awards this multibillion-dollar railway project to China.[139][140] On 16 October 2015, Indonesia and China signed an agreement to build Jakarta-Bandung High-Speed Rail as first phase of the project.[141] Groundbreaking has been done on 21 January 2016. The project has 60% of Indonesian consortium and 40% of China Railway International.[142] The project is 90% completed as of fall 2022, and is expected to begin its operations in the end of 2022.[143][144] The two governments are in talks to resolve the Rp 16,800,000,000 (US $1174157) cost overrun for the first section.[145]
Completion of the next phases of the project to Cirebon, Semarang, and Surabaya is uncertain given that the capital's relocation and completion of the Trans-Java highway might affect demand.[146] However, the Indonesian Transportation Ministry has outlined the construction of high-speed rail to Semarang as a priority as of spring 2022.[147]
Iran
Iran has a high-speed rail under construction connecting three major cities of Tehran, Qom and Isfahan. The line will have a station in Imam Khomeini International Airport. The route length will be 422 km (262 mi) with the operating speed of 350 km/h, decreasing the travel time from 5 hours to 90 minutes. The project costs over 7 billion Euros and will be open in 2022, built by China Railway Engineering Corporation.[148][149]
A 117 km (73 mi) double track branch from Qom to Arak will be built for 300 km/h headway at 1.2 billion euros (including Arak station and 6 viaducts), a contract which the Islamic Republic of Iran Railways initially awarded to Italian-based Ferrovie dello stato in 2017,[150][151] but was reawarded to Chinese corporations following enforcement of US-led sanctions in 2018,[152] alongside many other rail projects.[153]
Another high-speed rail was planned to link Tehran the capital to Mashhad, the second largest city in Iran. In 2016, the route was planned to have 800 km rail and the speed of 400 km/h which would have decreased the travel time from 8 hours to 3.5 hours.[154] A reduced $1.5 billion plan for electrification and upgrading of the existing 967 km line from 160 km/h to 200 km/h was signed by a consortium of Iranian (Mapna Group) and Chinese companies in July 2017, before the Chinese backed out in January 2021.[155]
Israel
In 2020, Israel's National Infrastructure Committee approved high-speed rail links between the four metropolitan cities – Jerusalem, Tel Aviv, Haifa and Beersheba. The project is slated for completion by 2040, with a top speed of 250 km/h.[156] The high-speed electrified connection between Tel Aviv and Haifa will cost $3.8 billion and reduce travel time from 1 hour to 30 minutes, due to be completed by 2030 but with no budget for rolling stock.[157] Further plans currently planned for completion by 2040 include an extension north of Haifa, a continuation from Tel Aviv through Ben Gurion Airport to Jerusalem, and an unspecified connection to Beersheva.[157]
Japan

A maglev line between Tokyo and Osaka, the Chuo Shinkansen, is under construction by the Central Japan Railway Company (JR Central). The Nagoya-Tokyo section is planned to be opened in 2027. The Nagoya-Osaka section is projected to be completed in 2037.
The route is to be privately financed through bond sales by JR Central, but the intermediate stations will be financed by local governments. JR Central expects at least 8 years between the completion of the Tokyo section and the start of construction of the Osaka to rebuild its financial position. The federal government is exploring options to accelerate the project.[158]
Research on high-speed rail systems based on magnetic levitation have been ongoing since the 1970s, led by JR Central. The trains and guideways are technologically ready and over 100,000 people have ridden them. Pre-series L0 series trains on the Yamanashi Test Line have reached speeds of 603 kilometres per hour (375 mph) (crewed), making them the fastest trains in the world.[159] The Yamanashi test track is to be incorporated into the under construction Tokyo–Osaka maglev route.
Extensions to the current network expansions, notably from Hakodate to Sapporo, have been approved for construction.[160] The route of the final extension of the Hokuriku Shinkansen has not been finalised. It is ultimately to provide a northern route through to Osaka.
Conventional routes planned in 1973 are on hold (to be built after current lines opening). Further Hokkaido Shinkansen extension was proposed in 1970s, even to Russian border via possible tunnel, tunnel to South Korea is also proposed.
Line | Speed | Length | Construction began | Expected start of revenue services |
---|---|---|---|---|
Hokkaido Shinkansen Extension (Sapporo – Asahikawa) | 320+ km/h | 130 km | on hold | 2045 |
Sapporo – Oshamambe | 200+ km/h | 180 km | on hold | 2045 |
Uetsu Shinkansen (Toyama – Aomori via Niigata) | 200+ km/h | 560 km | on hold | 2030+ |
Ōu Shinkansen (Fukushima – Akita via Yamagata) | 200+ km/h | 270 km | on hold | 2030+ |
Hokuriku Shinkansen (Tokyo – Osaka via Kanazawa) | 200+ km/h | 50 km | Tokyo to Kanazawa in operation, Kanazawa to Tsuruga under construction, Tsuruga to Osaka in planning | 2045 |
Trans-Chūgoku Shinkansen (Okayama – Matsue) | 260 km/h | 150 km | on hold | 2030+ |
San'in Shinkansen (Osaka – Shimonoseki via Tottori & Matsue) | 260 km/h | 550 km | on hold | 2030+ |
Shikoku Shinkansen (Osaka – Oita via Matsuyama) | 260 km/h | 440 km | on hold | 2045 |
Trans-Shikoku Shinkansen (Okayama – Kōchi) | 260 km/h | 150 km | on hold | 2045 |
East Kyūshū Shinkansen (Hakata – Kagoshima-Chūō via Ōita) | 260 km/h | 390 km | on hold | 2045 |
Trans-Kyūshū Shinkansen (Ōita – Kumamoto) | 260 km/h | 120 km | on hold | 2045 |
Kazakhstan
Qazaqstan Temir Zholy, the national rail company of Kazakhstan, has awarded a contract to oversee the design and construction of a high-speed line from Nur-Sultan (the country's capital) to Almaty (its largest city).[161][162] The line is expected to be 1,011 km (628 mi) long, and will travel via Karaganda and Balkhash.[161][162] A 10 km (6.2 mi) viaduct across Lake Balkhash is planned near Sayaq.[161][162] The trains are expected by be built by Tulpar-Talgo (a joint venture established in 2011 between Qazaqstan Temir Zholy and Spanish company Talgo[163]), and will have a maximum speed of 250 km/h (155 mph), completing the trip in five and a half hours.[161][162] The system will use Russian gauge, the same as used by Kazakhstan's existing conventional lines.[161][162]
In 2021, the Kazakh Prime Minister Asqar Mamin announced plans to extend the high-speed rail line terminating in Tashkent, Uzbekistan, across the border to Shymkent and Turkistan.[164][165]
North Korea
North Korea does not have a high-speed railway. Attempts were made in the 1970s to speed-up its network, when one electric trainset (using the bullet-train design) was built. However, the trainset never had regular services, due to the troubling economic crisis following the dissolution of the Soviet Union. In the 2000s, the Chinese government proposed a high-speed railway for the DPRK, but these proposals are still too far from planning or construction stage. Changes in foreign policy in during 2017 and 2018 encouraged both Koreas to start international railway projects. The Chairman of the State Affairs Commission has shown interest in high-speed rail technology[166]
Malaysia
A high-speed rail running at 300 km/h (186 mph) to link Kuala Lumpur and Singapore was proposed in 2006 by YTL Corporation, operator of the KLIA Express in Malaysia, although the company did propose a similar system back in the late 1990s. Plans for the project were put on hold in April 2008 due to high cost to the government, estimated at RM8 billion.[167] The project also faces opposition from rail operator rivals such as Keretapi Tanah Melayu, and the liberalisation of the Kuala Lumpur-Singapore air route further dampened prospects for the proposal.
In 2007, Siemens expressed interest in becoming the technology provider for the proposed rail link.[168] By the middle of 2009, YTL again revived talk on the project and expressed hope that the Malaysian government would relook at the proposal,[169] claiming that delays in the project has caused development costs to rise over the years.[170]
In 2010, Malaysia had made a proposal to revive the project.[171] In the new proposal, the route will be in two phases; the first one is from Kuala Lumpur to Singapore while the second phase will be from Kuala Lumpur to Penang.
On 19 February 2013, Singapore and Malaysia announced that they officially agreed to build a high-speed rail link between Kuala Lumpur and Singapore by 2020.[172] The KL – Singapore section was planned to be about 380 km long with an expected travel time of 90 minutes.[173] The high-speed railway terminus for Singapore was to be located in Jurong East at the Jurong Country Club site while the terminus for Malaysia was to be located at Bandar Malaysia in Sungai Besi.
After the landslide defeat of Najib Razak in May 2018, his successor, Mahathir Mohamad told the Financial Times that the project would be delayed in favor of cheaper alternatives, like spending RM 20 billion to upgrade the Keretapi Tanah Melayu (KTM) line so that trains can run at 200 km/h and align the KTM line to Jurong East Station.[174] On 5 September 2018, an agreement to defer the project until 31 May 2020 was signed between Singapore and Malaysia with completion pushed back to 1 January 2031 instead of 31 December 2026, following initial plans to scrap it.[175] In addition, Malaysia remitted S$15 million in abortive costs to Singapore on 31 January 2019.[176]
Subsequently, on 31 May 2020, Singapore agreed to Malaysia's request to delay the project for the final time to discuss and clarify proposed changes, ending on 31 December 2020.[177] As no agreement could be reached by that day, on 1 January 2021, the HSR project was terminated. As a result, Malaysia needed to pay compensation to Singapore of about S$102.8 million, which was transferred on 29 March 2021.[178][179] In March 2022, talks were scheduled again between the Malay and Singaporean governments to revive the high-speed rail project under new terms.[180]
Line | Speed | Length | Construction began | Expected start of revenue services |
---|---|---|---|---|
Kuala-Lumpur – Singapore High Speed Rail | >300 km/h | 350 km | Planned (changed from 2018 to December 2020, now rebooted) | 2026 (changed to 2031, now rebooted) |
On 26 February 2022, Thailand and Malaysia agreed to carry out a feasibility study between Kuala Lumpur and Bangkok.[180] On 17 May 2022, the two countries set up a joint committee to coordinate the planning of the Bangkok-Kuala Lumpur HSR project.[181] The project is still under discussion with no concrete plans as of May 2023.[182]
Myanmar
Plans have been published to build a high-speed railway between Yangon and Kunming in China, a distance of 1920 km. Construction is said to start after agreements with China was signed in 2011.[11] The project was put on hold in 2014 due to financial feasibility and national security concerns. The project was rebooted in 2019.[183][184]
Oman
Oman, which currently has no rail network, has planned a 2,144 km national high-speed rail network, mainly connecting the seaports of Salalah, Duqm, and Sohar, and linking to the Gulf Railway at Hafeet on its border with the United Arab Emirates.[185] The project was put on hold in 2014 due to oil prices collapsing, and the link to the Gulf Railway was paused in 2016 as other countries paused the project.[186] The planned network will be double-tracked, non-electrified, and have 220 km/h passenger traffic but plan to increase to 350 km/h, and international connections to Yemen through Mazyounah and to the Emirates through Al-Buraimi.[187]
Pakistan
According to the country's railway minister, when the ministry asked about such a service in Pakistan as a part of the CPEC Project, the Chinese laughed and recommended a 160 kmph semi-high speed service instead. The railway minister further added that there was no market for such a project and they could not afford it.[188] However, in 2021, Haier Pakistan suggested a 1,872 km passenger between Peshawar and Karachi along the current motorway which could run at 350 km/h and reduce the travel time to 5 hours and 30 minutes.[189]
Persian Gulf Countries
The countries of the Gulf Cooperation Council (UAE, Oman, Qatar, Bahrain, Kuwait and Saudi Arabia) plan a 2200-kilometre rail network,[190] Etihad Railway, which may include high-speed rail from Dubai to Abu Dhabi.[191] However it presently runs only a freight line in between.
In 2010, the government of Qatar has announced it intends to have high-speed rail links to Bahrain and Saudi Arabia built in time for its hosting of the 2022 FIFA World Cup.[192] This project was sidetracked by the Qatar crisis, but in early 2022, the Qatari and Saudi ministers of transport resumed talks about the proposed highspeed rail link.[193]
In 2022, the Saudi Crown Prince proposed a megaproject in Tabuk (The Line) which would feature a 500 km/h rail line.[194] As of September 2022, the Saudi transportation authorities are studying a high-speed link between Riyadh and Eastern Province, with a planned journey time of 1 hour and 15 minutes.[195] In May 2023, the Kuwaiti government proposed feasibility study for a 111km line from Nuwaiseeb Point to Al-Shaddadiyah (Kuwait City) for $3.25 million, which would link its network to Saudi Arabia.[196]
Philippines
The San Miguel Corporation proposed building a bullet train system connecting Laoag City in the northern part of Luzon island, with Manila and the Bicol Region in Southeastern Luzon. As of 2010, this project has been put on hold.[197][198]
In April 2013, the National Economic and Development Authority (NEDA) announced plans by the Metro Pacific Investments Corporation (MPIC) to fund the Clark-Metro Manila high-speed train project under a Build-Operate-Transfer scheme. The project will be called "Express Airport Trains" and will have at least three stops in Metro Manila. It will be built between the lanes of the North Luzon Expressway (NLEx). The trains are planned to have stops in Quezon City, Manila, and Makati.[199] However, it was later revealed that the new "Airport Express" service has a maximum speed of 160 km (99 mi) and does not qualify as true high-speed rail. It would rather qualify as higher-speed rail similar to trains on the Tel Aviv–Jerusalem railway which was also marketed during its proposal stage as a high-speed line. Similarly, the South Main Line reconstruction project, dubbed "South Long Haul", will have express trains that have the same maximum speed.[200]
Current railway projects such as the PNR South Long Haul are being designed for eventual upgrading to high-speed rail, and there are plans for HSR.[201] There are also plans for a high-speed rail network in Mindanao as part of future upgrades to the upcoming Mindanao Railway network with a top speed of 250 km/h (160 mph).[202]
Singapore
Thailand

The State Railway of Thailand and the Thai Ministry of Transport have plans for several high-speed rail lines. A HSR line to the eastern seaboard was first proposed in 1996 but there was no progress for over a decade. In 2009, the government requested the Office of Transport and Traffic Policy and Planning (OTP) to create a plan for new HSR network in Thailand that included an eastern HSR line to Rayong. In October 2009, it was reported that funding was being sought for four lines, linking Bangkok to Chiang Mai (711 km), Nong Khai (600 km), Chanthaburi (330 km), and Padang Besar (983 km).[203] In November, it was reported that the Thai cabinet had approved the plan, with the shorter Eastern HSR route to Chanthaburi being intended for construction first.[204] The total cost of all routes are 800 billion baht or US$25 billion. In October 2010, the Thai parliament approved initial proposals for a high-speed rail network to be built with Chinese industrial partners; 5 lines capable of 250 km/h would radiate from Bangkok, with the line to Ubon Ratchathani later dropped.[205] The routes were finalized before the 2011 election with the promise to begin construction the next year if the government was re-elected, but they lost the election.
After the 2011 election of opposition leader Yingluck Shinawatra, the new government reviewed all HSR plans, cutting them into phases with priority between Bangkok and Pattaya, Hua Hin, and Nakhon Ratchasima, expecting to tender the lines in 2014.[206]
After the May 2014 coup there were further delays while the military government reviewed all HSR lines, initially deferring all projects. Transport Minister Prajin Juntong and his Japanese counterpart Akihiro Ota signed a deal on 27 May 2015 to conduct a feasibility study for the full Northern HSR.[207] In early 2016, the military government (NCPO) agreed to proceed with the eastern HSR route and suggested that it could be extended to Don Mueang International Airport beyond the terminus at Bang Sue Intercity Terminal thus providing a direct link between the three major airports of Bangkok, including Suvarnabhumi Airport, and U-Tapao International Airport.[208] In 2017, the Office of Traffic Policy and Planning, alongside the Ministry of Transport and the State Railway of Thailand, agreed to this revised plan. In October 2017, the Eastern Economic Corridor Office (EEC Office) finalized previous plans to build the 10 station Eastern HSR line linking Don Mueang airport, Bang Sue, Makkasan, Suvarnabhumi Airport, Chonburi, Si Racha, Pattaya, U-Tapao Airport, and Rayong. In early 2018, the section to Rayong was excluded due to environmental and safety concerns and it was decided that the line would terminate at U-Tapao Airport.[209] In October 2019, after months of delay, the Thai government signed an agreement with a Charoen Pokphand-China Railway Construction consortium worth $7.4 billion to build the Eastern HSR from Bangkok to Pattaya in a public-private partnership, with assets reverting to state ownership after 50 years.[210]
The Japan International Cooperation Agency conducted a feasibility study for the Northern HSR to Chiang Mai, and in 2018 reported that the passenger projections were too low for economic viability.[211] The 670 kilometer line was estimated to cost 400 billion baht, and both private investors and the Japanese government turned away from the project.[212] However, the Ministry of Transport denies that Japan cancelled the project.[213] On 14 December 2022, the Department of Railways and MLIT-JICA discussed speeding up feasibility studies for the Bangkok-Chiang Mai HSR, to be finished by March 2023, and requested a study on the economic impact of the station area development.[214]
The Southern HSR to Hua Hin would be 211 km, and estimated at 152 billion baht, and a full extension to the Malaysian border was discussed in September 2021.[215] In 2022, Malaysia and Thailand agreed to set up a joint committee to coordinate a Bangkok-Kuala Lumpur high speed rail project, with a feasibility study begun in February.[216]
As of summer 2022, Thailand has fully committed to building the $12 billion Northeastern HSR to the Laotian border by 2028 at a 250 km/h double-tracked standard-gauge.[217] As of March 2023, Japan and Thailand continue to discuss beginning construction between Bangkok and Chiang Mai.[218] In May 2023, Thailand agreed to a technology transfer deal with China on condition of adopting Chinese rail standards.[219]
Turkey
The Turkish government has significantly invested in high speed rail, with some lines like the Ankara-Istanbul high-speed railway having opened in 2014, the Ankara-Konya high-speed railway having opened in 2011, with the extension to Karaman opened in winter 2022. Continuation of the line from Karaman to Ulukışla is currently under construction in 2022, and further plans to link Aksaray, Ulukışla, and Mersin have an anticipated opening in 2024, but are not yet tendered.[220] The Turkish government aims to connect 52 provinces with high-speed train networks by 2053, and will elaborate on further lines as current construction comes to completion.
Lines currently under construction include the Ankara–Sivas high-speed railway, which was originally planned to open in late 2021, but was delayed initially to 2022 due to construction deficiencies, and will reduce travel times from 12 hours to under 2 hours.[221][222][220] Work on the 405 km line is planned to open in April 2023, with stations at Elmadağ, Kırıkkale, Yerköy, Yozgat, Sorgun, Akdağmadeni, Yıldızeli, and Sivas, with 49 km of tunneling and 49 km of viaducts designed for 250 km/h operation.[223][224] A further 247 km extension from Sivas to Kars is concretely planned as an electrified and double-tracked line with a design speed of 250 km/h, and the five-station design study between Sivas and Erzincan was completed in July 2021.[225]
A spur from Yerköy to Kayseri has not yet been tendered, but is planned to be completed by 2025, reducing travel times between Ankara and Kayseri from seven hours to two hours. The 142 km spur to Kayseri would be double-tracked electrified rail designed for 250 km/h operation with 9 tunnels totaling 12.9 km.[226] Construction on the spur officially began in July 2022,[227] and will include intermediate stations at Şefaatli, Yenifakılı, and Himmetdede.[228]
The Ankara-Izmir high-speed railway is a planned 588 km double-tracked electrified railway built for 250 km/h operation, whose initial section to Afyonkarahisar was scheduled to open in 2022,[229] but the works were interrupted in 2018 and then restarted in 2022. The extension to Izmir will contain 49 tunnels totaling 41 km, 56 viaducts totaling 23 km, and six new stations, reducing the current 9-hour road trip to a 3.5 hour travel time.[230]
A 106 km spur off the Istanbul-Ankara line from Osmaneli to Bursa is planned to open by 2023, after construction delays due to earthquake risk and expropriation lawsuits; further extension to Bandirma was tendered in 2020, and the full 201 km line will be built for 200 km/h operation and will cost 9.5 billion lira ($650million USD), bringing travel times between Ankara and Bursa to 2 hours and ten minutes.[231]
A 229 km high speed rail line on the European side of the Bosporus will link Halkalı Train Station in Istanbul with Kapıkule Station in Edirne, with an anticipated opening of 2023, and will decrease travel time from 4 hours to 1 hour 20 minutes. The double-tracked electrified railway will be built for 200 km/h operation and cost 10.5 billion lira ($716 million USD), of which more than half is provided by a European Union grant.[232][233]
Turkmenistan
President Gurbanguli Berdimuhamedov announced that Turkmenistan would build a high-speed train between Turkmenbashi and Turkmenabat in 2012.[234]
Uzbekistan
In addition to the current high speed network of Uzbekistan from Tashkent through Samarkand to Bukhara, in December 2021 the Asian Development Bank approved a $162 million loan for electrification between Bukhara and Khiva, constituting 60% of the anticipated cost.[235] The 452 km line already has a design speed of 250 km/h and is only missing electrification for high-speed rail service; in July 2022 a contract was awarded to DB E&C for electrification with construction set to begin in fall 2022, with intermediate stops at Navbokhar, Parvoz, Kiyikli, Zhaikhun, Turon, Khazarasp, and Urgench.[236] High-speed rail service to Khiva is planned to be launched in 2024, reducing travel time between Bukhara and Khiva from 8 to 3 hours; in November 2022, President Shavkat Mirziyoyev announced an electrification extension from Khiva to Nukus.[237]
Vietnam
Vietnam's national railway company, Vietnam Railways, has proposed a 1,630-kilometre (1,013 mi) high-speed rail link between Hanoi and Ho Chi Minh City, capable of running at 250 to 300 km/h (155 to 186 mph).[238] The funding of the $56 billion line would mostly come from the Vietnamese government, with Japanese aid. Technology used on the Japanese Shinkansen has been suggested to be used for this new railway.[239]
Current technology allows trains travelling on the current, single-track Hanoi to Ho Chi Minh City line to complete the journey in approximately thirty hours.[240] Once completed, the high-speed rail line would have 2 parallel standard gauge tracks with no direct road crossings, and would allow trains to complete the Hanoi–Ho Chi Minh City journey in approximately 6 hours. The existing line uses narrow gauge tracks common in Southeast Asia.[241]
Vietnamese prime minister Nguyễn Tấn Dũng had originally set an ambitious target to complete the line by 2013, three years sooner than the previously announced nine-year construction time.[242] Later reports suggested Japanese development aid would only be available in stages, with completion of the line not expected until the mid-2030s; the same reports asserted that aid would be conditioned upon the export of Shinkansen technology.[238][239] On 19 June 2010, after a month of deliberation, Vietnam's National Assembly rejected the high-speed rail proposal due to its high cost, leaving the project's future in doubt; National Assembly deputies are said to have asked for further study of the project.[243][244]
In January 2011, Vietnamese Minister of Transport, Hồ Nghĩa Dũng, suggested the line might be completed by 2030. The length of the proposed line was listed as 1555 km long with trains running at 300 km/h. After the rejection of the original plan by the house of deputies, Minister Dung has asked for a new feasibility plan by the end of 2011, whilst the Japanese development agency has suggested an interim solution where the line could be built to separate north and south sections.[245] In 2021, the Vientamese Ministry of Transport announced plans to begin in 2028 with the a 250 km segment from Hanoi to Vinh and a 450 km segment between Ho Chi Minh City and Nha Trang, with a total cost of $5bn and a design speed of 320 km/h.[246] In July 2022, Prime Minister Pham Minh Chinh requested support from the Japan Bank for International Cooperation for $10 billion in aid towards the project.[247] In March 2023, the Chinese Communist Party reaffirmed the strategic importance of the North-South high-speed rail project to begin construction before 2030 and be completed by 2045, with special focus on the sections Hanoi-Vinh and Ho Chi Minh-Nha Trang; the project is estimated to sprawl 1559 km with operation speed above 320 km/h and cost over $58 billion.[248]
Europe
Belarus
In 2017, Belarusian authorities agreed to offer land territories to CRCC Asia for construction of high-speed corridor between European Union (EU) and Russia. Chinese Engineering Companies are also interested in building highways and Russian High-Speed Railways, running in connection with this route with possible interchange with Moscow–Kazan High-Speed Rail Corridor.[249] In 2019, Belarus also participated in the discussion of the planned St.Petersburg–Hamburg High-Speed Rail Corridor, but it is not yet added to official proposals.
Belgium
The 25N line opened in 2012–2018 is designed for speeds up to 220 km/h, but is limited to 160 km/h. In order to reduce traffic and time consumption, an existing line from Mechelen to Antwerp has been upgraded. Construction began in June 2013 and was completed in November 2021. It was opened to traffic on 14 December 2021.[250]
Czechia
In 2017, the Government of the Czech Republic approved a high-speed rail development program, predicted to cost 645 billion korunas, or over 25 billion euros.[251] The entire network will cover about 660 kilometers, and will include both the construction of new lines as well as upgrading existing lines to 200 km/h.
- RS1 – Prague–Brno–Ostrava, with possible extension to Katowice in Poland.
- RS2 – Brno–Breclav, with possible extensions to Vienna in Austria and Bratislava in Slovakia.
- RS3 – Prague–Plzen, with possible extension to Munich in Germany.
- RS4 – Prague–Ústí nad Labem, with possible extension to Dresden in Germany.
- RS5 – Prague–Liberec or Hradec Králové, with possible extension to Wrocław in Poland.
In 2018, Správa železnic, the Czech Railway Infrastructure Manager, began working on three pilot projects for increasing speed on pre-existing lines.[252] These include the sections between Prague and Poříčany (30 km), Brno and Vranovice (25 km), and Přerov and Ostrava (60 km).
In 2020, German Deutsche Bahn (DB) and Government of Czech Republic agreed to undertake construction of the new high speed rail link between Prague and Dresden (RS4), and started feasibility studies. The project is estimated to cost a total of 5.4 billion euros, and will include a 25 km tunnel beneath the Ore Mountains. The travel time on the current route is 2 hours and 15 minutes, but the new link is predicted to reduce travel times between Prague and Dresden to just 60 minutes. The first section, between Prague and Lovosice, is predicted to be completed before 2035, with the rest completed by 2050.[253]
Denmark
- A high-speed rail is being planned as a double track between the Copenhagen–Ringsted Line, which opened in 2019. It initially allows 200 km/h with the rail infrastructure prepared for 250 km/h when signalling is upgraded.
- There are plans to upgrade the existing railway Ringsted–Odense to 200 km/h or more.
- The existing Ringsted–Rødbyhavn is being upgraded to 200 km/h, in preparation for the completion of the Fehmarn tunnel, allowing fast connection between Copenhagen and Hamburg.
- In 2021 construction began on the new Vestfyn Line, a new 250 km/h line connection Odense on the island of Funen to the existing bridge to Jutland, but with considerations for alignment to a future bridge allowing high speed crossing of the belt.
- There are plans to build a new railway for 250 km/h Odense–Aarhus.
These projects are planned to reduce the travel time Copenhagen–Aalborg to three hours compared to 4:20 as of 2018, and to one hour between each of Copenhagen, Odense, Aarhus and Aalborg.
- A proposal led by lobbyists is the HH Tunnel Helsingør–Helsingborg, with connecting 60 km (37 mi) high speed railway Copenhagen–Helsingør. This one has no decided year for realisation.
- A proposal led by lobbyists is also the 35 km (22 mi) Kattegat Bridge with connecting high speed railway, able to connect Copenhagen with Aarhus in less than two hours, and complementing the congested and vulnerable Great Belt Bridge.
Finland
- Helsinki–Turku high-speed railway: a proposed rail link between Helsinki and Turku with planned maximum speed of 300 km/h (190 mph)
- Plans exist for a high-speed connection between Helsinki and Tampere with a travel time of one hour through the planned Lentorata tunnel from Helsinki to Kerava via Helsinki Airport station, and either upgrade the Riihimäki–Tampere railway to high speed standard or build a new parallel line.
- An eastern high-speed line between Helsinki and Kouvola via the airport and Porvoo is also planned, known as Itärata.
Hungary
On 28 January 2020, a call for tenders was issued for a detailed feasibility study of the proposed line between Budapest and Cluj-Napoca in Romania. The section within Hungary is expected to accommodate speeds of 250–350 km/h while the Romanian section will have a line speed of 160 km/h.[254]
Iceland
• An airport rail link is under planning, The train will be called the 'Lava Express', travelling as it does past the famous lava fields of South-West Iceland. The line will be 49 km long, of which 14 km will be underground, towards the Reykjavik end. The average speed of the train will be 180 km/h, with a maximum speed of 250 km/h. However, as of 2021, the Airport Rail Link's construction has been postponed due to the ongoing COVID-19 pandemic. The date of the start of the construction is currently unconfirmed, and will be decided later.
Ireland
In 2020 the Irish Government confirmed it will be launching a study into an approximately 500 km high-speed railway from Belfast via Dublin to Cork and Limerick,[255] which could cost around €15 billion.[256]
Netherlands
The proposed HSL-Oost line was cancelled in 2009. The section of that proposed line between Amsterdam and Utrecht is four-tracked. 2 tracks out of 4 are capable for 200 km/h, but electrification voltage is not enough, the line is planned to be re-electrified to 25 kV AC. Another problem on that section as in more parts in the Netherlands is that the ground isn’t stable enough for higher speed due to peat.[257]
Norway
- The Norwegian government has examined five long-distance high-speed lines radiating out from Oslo to Bergen, Kristiansand/Stavanger, Trondheim, Gothenburg, and Stockholm. A sixth line would be a coastal line between Bergen, Haugesund and Stavanger. At least two investigations on cost and benefit have been made, released 2007 and 2012.[258] These plans were shelved in 2013, although still open for restart in a decade or so.
- There are ongoing and coming projects for high-speed upgrades on the closest 50–100 km from Oslo on each of these lines (except direction Stockholm). They have good potential for regional trains. Upgrade and new construction to high-speed standard have to some extent already taken place like for Gardermobanen. The time plan is to have 200 km/h or more from Oslo to Porsgrunn (partially slower), to Hamar and to Råde east of Moss around 2020–2025, and to Halden and Hønefoss later, maybe 2030.
The regional projects near Oslo have higher priority than the long-distance projects. They are also preconditions for the long-distance projects, since they will be used by long-distance trains.
Poland
- Warsaw to Poznań and Wrocław via Łódź (planning postponed in 2011)
- Warszawa-Toruń-Gdańsk high-speed railway
- Central Rail Line was designed for speeds of up to 250 km/h. 200 km/h is used in commercial service, however higher speeds are planned later.
Portugal
Portugal's Prime Minister António Costa announced in September 2022 a $4.7 billion passenger rail line running round 300 km (185 miles) from Lisbon-Oriente to Porto-Campanhã, cutting travel time by over 50% to 75 minutes non-stop, and 105 minutes with stops in Leiria, Coimbra and Aveiro.[259] A future second phase will include another 150 km (100 miles) to Porto Airport, Braga, Valença, and a connection to Vigo in Spain.
- Lisbon–Porto high-speed rail line (proposed in 2020)[260]
Romania
In 2021, the European Commission approved 3.9 billion euros for rail in Romania's National Recovery and Resilience Plan, which will modernize railways, rolling stock, and signaling systems. A 120 million euro feasibility study for a high-speed line between Constanta through Bucharest to the Hungarian border was begun in 2022 and expected to be completed by 2026. Among the possible options are a fully high-speed 590 km route be through Sibiu, Cluj, and Oradea which could cost 17 billion euros; another possibility is a hybrid line with some sections at 200 km/h, and some sections at 160 km/h.[261]
Russia
Since 1980s, the several proposals of high-speed network were made. Vladimir Putin announced plans to build a 770 km high-speed rail line that would connect Kazan and Moscow at the Economic Forum at St. Petersburg in 2013. Plans for the railroad estimate that it will be the first true high-speed line in Russia with trains operating at up to 350 km/h, reducing travel time from 13-hour to 3.5 hours. In comparison, trains on the Moscow–St. Petersburg line run at up to 250 km/h.[262] In 2019, the date of opening changed to 2024, the initial track length was shortened from 770 km to 301 km.
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
High Speed Main Line | Zhelesnodorozhnaya (Balashikha, Moscow's suburb)–Gorokhovetz | 360 km/h (220 mph) or 400 km/h (250 mph) (different sources) | Planned, to be built until 2024, construction delayed | 301 km (187 mi) |
Gorokhovetz–Kazan | 360 km/h (220 mph) or 400 km/h (250 mph) (different sources) | To be constructed after 2024 | 461 km (286 mi) | |
Kazan–Naberezhnye Chelny | 360 km/h (220 mph) or 400 km/h (250 mph) (different sources) | Proposed in 2019 | 220 km (140 mi) |
Sweden
Many of the newly built railway lines in Sweden are adapted for speeds up to 250 km/h as Botniabanan, Grödingebanan, Mälarbanan, Svealandsbanan, Västkustbanan, Vänernbanan (Gothenburg – Trollhättan).[263] The problem that is slowing down high-speed rail in Sweden is the present signaling system (ATC), which does not allow speeds over 200 km/h. It can be upgraded, but it will not be done since it shall be replaced by the European signaling system ERTMS level 2 on major lines in the near future, allowing high speeds up to 250 km/h.[264] ERTMS level 2 has been installed and is being tried out on Botniabanan, and that railway allows 250 km/h, although no passenger train goes above 200 for now. The train set X55-Regina has been delivered to the rail company SJ with the max speed of 200 km/h but with the option to upgrade the EMU to 250 km/h when possible.[265] Also the mix with freight trains slow down the practical speed.
There are four major high-speed projects proposed in Sweden with speeds between 250 and 350 km/h.
- Norrbotniabanan, Umeå – Luleå, is a future major rail project that will be built for 250 km/h with mixed passenger and freight traffic in northern Sweden, mainly to relieve the highly congested and old single track Main Line Through Upper Norrland increase freight traffic, and greatly speed up passenger traffic along the coast.[266]
- Ostlänken: Järna – Linköping, which would relieve the congested and slow conventional main lines on the stretch Järna-Linköping, Södra stambanan.[267][268]
- Götalandsbanan: Gothenburg – Jönköping – Linköping on to Stockholm via Ostlänken. It would reduce travel time Gothenburg-Stockholm from 3.05 h to 2h.[269]
- Europabanan: Jönköping – Lund. Possibly extended to Helsingborg, Helsingör (Tunnel under Øresund) and Copenhagen.[270]
The three first listed, but not Europabanan, have been prospected in detail by Trafikverket. In several cases the detailed alignment has been decided. There is a political interest to build all these four. The Swedish Moderate government decided in 2012 to build Ostlänken, but with mostly max 250 km/h, after putting all projects on hold in the budget of 2011.[271] The Social Democrat government entering in 2019 stated they want to build them, as of 2019 construction has to start on all lines.[267]
Ukraine
In the early 2000s, Ukraine planned to build 2593 km of upgraded high speed rail tracks between 2005 and 2015.[272] The rolling stock was purchased in 2010. However, the maximum operating speed in Ukraine is still 160 km/h, and subsequent lack of maintenance has caused a number of derailments.
In 2011, a Moscow-Kyiv high-speed line was proposed, but Ukraine canceled the project following the 2014 conflict between the two countries. Russia, which had already purchased the rolling stock for the planned rail line to Kyiv, instead deployed the trains on the Moscow-Nizhny Novgorod line. In October 2017, it was claimed that a 330 km line between Lviv and Warsaw would begin construction in 2018, but the project has yet to break ground. In January 2023, Ukraine Railways signed a cooperation agreement with the Polish government to develop a standard-gauge high-speed rail line from Warsaw through Lviv to Kyiv with a 250 km/h operating speed.[273]
United Kingdom
High Speed 2 (HS2) is a planned high-speed rail line mainly between London and Manchester, which will connect cities both directly and indirectly via connections to the existing British railway network. The first phase of High Speed 2 will connect London and Birmingham and is expected to be completed between 2029 and 2033.[274] The second phase will connect Birmingham to Manchester, and a new East Midlands Hub station which will serve Nottingham and Derby.
The first phase is currently under construction. High Speed North is a proposed east–west line connecting Liverpool, Manchester and Leeds which will also connect to HS2.
Beyond HS2 Report. In May 2018, Greengauge 21 released a report entitled ‘Beyond HS2’ which looked at how the rail network could develop by 2050. It proposed several projects:[275]
- New High Speed Line from Colchester and Cambridge (via Stansted) to Stratford (possibly extending to Canary Wharf)
- A New Higher Speed Line from Perth and Dundee to the Shotts Line
- A new High Speed Line avoiding Motherwell
- A new connection between the HS2 Eastern Leg and Kingsbury allowing services to continue to Bristol, Cardiff and Plymouth via Cheltenham Spa.
- A new link between WCML and Crossrail
- A new link between Langley and Heathrow
- A new link between Richmond and Waterloo to Heathrow T2
- A new link between Heathrow and Staines
- A new Northern Powerhouse Rail
- A new line between Darlington and Newcastle
Oceania
Australia
There have been several proposals to develop a HSR line between Sydney and Canberra (via SYD airport and CBR airport) to link the two cities and to provide an effective second airport for Sydney. The line is also proposed to eventually continue on to Melbourne (also possibly via MEL airport). It is worth noting that the SYD-MEL air traffic corridor is one of the busiest in the world, HSR would allow for journey times city center to city center quicker than flights plus associated procedures and travel. In September 2010, Infrastructure Partnership Australia (IPA) and AECOM proposed an east coast very fast train corridor from the Sunshine Coast and Brisbane (Queensland) and onto Sydney (N.S.W), Canberra (A.C.T.) and through to Melbourne (Victoria). East Coast High Capacity Infrastructure Corridors
Line | Speed | Length | Construction began | Expected start of revenue services |
---|---|---|---|---|
Geelong Line (Melbourne-Geelong) | 300 km/h | 71 km | Proposed | 2020s (claimed)[276] |
In May 2022, a leaked government document showed a draft for building a 250 km/h rail network around Sydney-Wollongong-Newcastle over the coming decades: Parramatta and Newcastle would have travel times slashed from 2.5 hours down to 1 hour, and Parramatta-Gosford trips would take 25 minutes. Parramatta to Canberra would take 90 minutes.[277]
New Zealand
As part of ongoing studies to increase the speed of a rail service from Auckland to Hamilton, potential for a new standard gauge line was identified at a cost of NZ$14.425 billion; with trains travelling at 250 km/h and taking 69 minutes to travel between the two cities.[278][279]
References
- General definitions of highspeed. Archived 10 December 2006 at the Wayback Machine uic.asso.fr/ 28 November 2006. Retrieved 3 January 2007.
- "Flagship Projects of Agenda 2063". African Union. Retrieved 28 May 2022.
- "Towards the African Integrated High Speed Railway Network (AIHSRN) Development" (PDF). African Union. Retrieved 28 May 2022.
- Zuma, Nkosazana Dlamini (2 April 2016). "Talking points to the 4th General Assembly of the African Forum of Former Heads of State and Government" (PDF). African Union. Retrieved 28 May 2022.
- "Second Continental Report: On the Implementation of Agenda 2063" (PDF). African Union. February 2022. Retrieved 28 May 2022.
- "Detailed Scoping Study (DSS) of Vision 2063 Africa Integrated High Speed Railway Network and Master Plan". Virtual PIDA Information Centre. 1 February 2020. Retrieved 28 May 2022.
- Kaulbeck, George (12 February 2020). "Detailed Scoping Study (DSS) -- of Vision 2063 Africa Integrated High Speed Railway Network and Master Plan". Program for Infrastructure Development in Africa. Retrieved 28 May 2022.
- "Tlemcen: Le LGV se rapproche de Maghnia à petite vitesse". ITA (in French). Retrieved 4 November 2021.
- "Tlemcen: La "LGV" vers Oued Tlelat sur de bons rails". Djazairess. Retrieved 4 November 2021.
- "» Tlemcen – Akkid Abbas HSR Project, Algeria". Retrieved 4 November 2021.
- "Développement du rail à l'ouest : Des projets et des attentes | El Watan". www.elwatan.com. Retrieved 4 November 2021.
- "Egypt plans railway project to link Mediterranean with Red Sea – Egypt Independent". Egypt Independent. 13 March 2018. Retrieved 11 April 2018.
- "Egypt to Construct High-Speed Railway To Link Between Mediterranean and Red Sea: Minister | Egyptian Streets". egyptianstreets.com. 14 March 2018. Retrieved 11 April 2018.
- "Chinese-led consortium to build $9bn high-speed railway in Egypt, report says". Global Construction Review. 16 September 2020. Retrieved 22 January 2021.
- "Egypt's high-speed electric train route to include 15 stations". Egypt Independent. 7 October 2020. Retrieved 22 January 2021.
- "Egypt agrees deal for $23 billion high-speed rail link". Arab News. 15 January 2021. Retrieved 22 January 2021.
- "Siemens Mobility to commission first high-speed rail network in Egypt". Global Railway Review. Retrieved 22 January 2021.
- "Egypt takes step toward $23bn high-speed rail network – News – GCR". Global Construction Review. 18 January 2021. Retrieved 22 January 2021.
- "Egypt agrees with Siemens to implement express train 2nd, 3rd phases". EgyptToday. 24 February 2022. Retrieved 16 March 2022.
- Zand, Bernhard (13 September 2021). "Egypt Picks Europe Over China: High-Speed Rail To Connect Red Sea and Mediterranean". Der Spiegel. ISSN 2195-1349. Retrieved 4 November 2021.
- "Siemens to finalise more contracts for Egypt's $4.45bn high-speed rail system by year-end". The National. 13 October 2021. Retrieved 4 November 2021.
- Dharma, RanjithKumar (24 February 2023). "NGE wins high-speed rail contract in Egypt". Railway Technology. Retrieved 1 April 2023.
- "Egypt, Siemens to ink contract for 2 lines of high-speed electric rail in May". Zawya. 16 May 2022. Retrieved 24 May 2022.
- "Egypt's Transport Ministry starts construction of 2nd express train line". Egypt Independent. 14 March 2022. Retrieved 1 May 2022.
- "Egypt's High-Speed Electric Train to be extended to Toshki in Western Desert". EgyptToday. 16 May 2022. Retrieved 24 May 2022.
- "Egypt Expands Railway Network to Include Sudan, Libya". Asharq AL-awsat. Retrieved 1 May 2022.
- "Kuwait to fund studies for Egypt-Sudan line". International Railway Journal. 12 April 2022. Retrieved 24 May 2022.
- "Egypt, Sudan connecting Khartoum with Cairo-Cape Town rail line". Arab News. 12 June 2021. Retrieved 25 May 2022.
- "Egypt extends route of Giza-Aswan high-speed electric train to Abu Simbel". Egypt Independent. 23 January 2023. Retrieved 1 April 2023.
- "Siemens to implement 2nd, 3rd lines of Egypt's first high speed train: Ministry". EgyptToday. 12 April 2022. Retrieved 24 May 2022.
- "Siemens finalises contract for entire Egyptian high-speed rail system". RailTech.com. Retrieved 21 June 2022.
- Zaptia, Sami (20 January 2021). "Egypt and Libya contemplating extending Egypt's rail line to Benghazi". Libya Herald. Retrieved 4 November 2021.
- "Egypt plans to extend high-speed rail lines to Sudan, Libya: Transport minister". EgyptToday. 8 March 2023. Retrieved 1 April 2023.
- Ngueyap, Romuald (21 January 2021). "L'Egypte envisage d'étendre son futur TGV jusqu'à Benghazi en Libye (French)". Agence Ecofin. Retrieved 4 November 2021.
- "First 14 km of Libyan rail network in place". Railway Gazette International. Retrieved 1 May 2022.
- "Libya to approve final part of coastal high-speed railway". MEED. 30 November 2010. Retrieved 1 May 2022.
- Oryx. "This Was Gaddafi's Personal Italian High-Speed Train". Oryx. Retrieved 1 May 2022.
- "Russian-Libyan Rail Project may be Resumed | Libya Business News". 21 April 2015. Retrieved 1 May 2022.
- "Talks to Resume Construction of Sirte-Benghazi Railway | Libya Business News". 2 October 2018. Retrieved 1 May 2022.
- "Egypt may extend high-speed electric train to Libya". EgyptToday. 18 January 2021. Retrieved 1 May 2022.
- "Train from Tunis to Casablanca, New High Speed Link Between Morocco, Algeria and Tunisia – Tunisia Live". 27 April 2015. Archived from the original on 16 August 2016. Retrieved 5 August 2016.
- "Morocco : 100 bln MAD for Kénitra-Marrakech-Agadir high-speed rail". en.yabiladi.com. Retrieved 28 April 2021.
- tarik (2 June 2021). "Un groupe chinois se positionne sur le projet du TGV Marrakech-Agadir". Infomédiaire (in French). Retrieved 2 January 2022.
- "Morocco seeks to more than double its railway network by 2040, reaching 4,400 km". Ecofin Agency. Retrieved 1 May 2022.
- "Morocco to Launch Rabat-Fez High-Speed Train". Morocco World News. 16 July 2022. Retrieved 22 July 2022.
- "Namibia to pilot SADC high-speed railway project | Confidente". Retrieved 28 May 2022.
- "Egypt, Kuwait Fund sign $2.5m grant deal for railway project". Arab News. 9 April 2022. Retrieved 1 May 2022.
- "Egypt and Sudan in talks to build new 900km-long railway line". Railway Technology. 9 April 2021. Retrieved 25 May 2022.
- Republic of Tunisia. "LGV (Ras Jedir - Gabès - Tunis) et (Tunis Tabarka)". Instance générale des partenariats public-privé. Retrieved 4 November 2021.
- Sarra, Abdou (3 July 2020). "La Tunisie aura-t-elle son TGV ?". Webmanagercenter. Retrieved 4 November 2021.
- "Le TGV de Kais Saied n'est pas une priorité". Espace Manager (in French). Retrieved 16 March 2022.
- "Ambitious plans will still need funding". Railway Gazette International. 7 June 2010. Archived from the original on 8 September 2012.
- "The rise of Chinese railway diplomacy". 24 September 2010.
- "Chinese Company in Talks on South Africa Rail Project". The New York Times. 25 August 2010. ISSN 0362-4331. Retrieved 20 April 2022.
- Onyango, Seth (13 September 2021). "African economies place bet on bullet trains for growth". The Star. Retrieved 4 November 2021.
- de Wet, Phillip (20 April 2022). "China is keen to help build a Johannesburg to Durban high-speed train". Business Insider: South Africa. Retrieved 20 April 2022.
- "Plans for new high-speed trains in South Africa". Businesstech. 19 October 2022. Retrieved 24 October 2022.
- Argentina confirms high speed rail consortium Railway Gazette International 17 January 2008.
- "2009-02-01". Retrieved 22 October 2010.
- 'Cobra' offers high speed future Archived 15 April 2012 at the Wayback Machine Railway Gazette International August 2007.
- "El Tren bala hacia Mar del Plata". Clarín (in Spanish). 2008. Retrieved 21 February 2008.
- New prospects for very high speed rail travel 28 April 2008
- In Tokyo Rio governor assures high speed rail Archived 12 October 2010 at the Wayback Machine Rio 2016. Retrieved 21 June 2009.
- Brazil to build high-speed rail linking Rio and Sao Paulo Pravda. 28 May 2007. Retrieved 21 June 2009.
- Brazil eyes 2-phase high speed train tender in Feb Reuters. Retrieved 21 June 2009.
- Vermont Agency of Transportation (VTRANS) Archived 24 April 2011 at the Wayback Machine, State of Vermont, Boston to Montreal High-Speed Rail (BMHSR) Planning and Feasibility Study
- "U.S. Department of Transportation: Barack Obama 2009 HSR proposal". Archived from the original on 24 May 2009.
- Cooperativa.cl. "Proyecto de tren rápido Santiago-Valparaíso se congeló producto de la pandemia". Cooperativa.cl (in Spanish). Retrieved 17 March 2022.
- "BNamericas - Santiago-Valparaíso high-speed rail link not..." BNamericas.com. Retrieved 17 March 2022.
- "BNamericas - Plans for Santiago-Valparaíso high-speed tra..." BNamericas.com. Retrieved 6 May 2022.
- "Portal ANI". Portal ANI.
- http://www.azcentral.com/arizonarepublic/business/articles/0106mextrain06.html
- "Bullet Train to Mexico City Looks to be Back on Track ? | Guadalajara Reporter". Archived from the original on 30 April 2011. Retrieved 30 October 2010.
- "Systra : Project for a Mexico City - Guadalajara High Speed Line. Rail transport engineering, public transport engineering". Archived from the original on 1 May 2011. Retrieved 30 October 2010.
- "Slim to invest in Santa Cruz". The America's Intelligence Wire. 21 January 2005.
- "Mexico to build cross-peninsular high-speed railway line" 16 June 2011; see http://www.globalmasstransit.net/archive.php?id=6819
- "Route selected for Mexico City - Querétaro high speed line". Railway Gazette International. Retrieved 11 May 2023.
- "Tips to Improve the Style of Your College Essay Significantly | theguadalajarareporter.com". Retrieved 11 May 2023.
- "Mexico tenders for high-speed train linking capital and Queretaro". Reuters. 27 July 2014. Retrieved 11 May 2023.
- "Mexico Suddenly Canceled Its Multi-Billion-Dollar Deal for a Bullet Train". Business Insider. Retrieved 6 August 2016.
- "Mexico-Queretaro train back on drawing board in new transport plan". Mexico News Daily. 10 July 2018. Retrieved 17 March 2022.
- "BNamericas - Mexico green lights US$2.3bn high-speed trai..." BNamericas.com. Retrieved 17 March 2022.
- "TM Sourcing Announces The Start Of "El Bajío" Train". Mexico Business. Retrieved 17 March 2022.
- Diamond, Randy (1 September 2021). "Can new interest in S.A.-to-Monterrey train make it reality?". mySA. Retrieved 17 March 2022.
- "China gives Panama its plan for a $4bn high-speed rail line to Costa Rica". Global Construction Review. 21 March 2019. Retrieved 11 June 2020.
- "Tren chino, fuera de las prioridades de Cortizo". La Estrella de Panamá (in Spanish). Retrieved 2 January 2022.
- Goldberg, Bruce (June 2006). "Metroliner's Amazing Rave". Trains: 53.
- "FRA approvals pave way for Texas high speed line construction". Railway Gazette. 23 September 2020. Retrieved 26 September 2020.
- "Texas central selects Renfe as operating partner". www.rtands.com. 11 October 2018.
- "High speed rail moves ahead: Texas Central proceeds with addition of Italian engineering, construction group". Corsicana Daily Sun. 9 October 2018. Retrieved 16 October 2018.
- "California picks first high speed section". Railway Gazette International.
- "Grant reallocations double California's high speed pilot section". Railway Gazette International.
- "High-speed train connecting LA and Las Vegas expected to open in 2027". Spectrum News 1. Retrieved 24 April 2023.
- "Amtrak proposes Northeast Corridor high speed line". Railway Gazette International.
- Heather J. Carlson (27 July 2016). "Not so fast: high-speed rail plan advancing slower than expected". Retrieved 6 August 2016.
- "Yahoo News – Latest News & Headlines".
- "Spain keen to invest in rail sector". Archived from the original on 16 September 2014. Retrieved 16 September 2014.
- "China wants to invest in Dhaka-Ctg high-speed train". New Age | The Most Popular Outspoken English Daily in Bangladesh. Retrieved 8 April 2022.
- Adhikary, Tuhin Shubhra (3 March 2022). "Russia keen on funding three rail projects". The Daily Star. Retrieved 16 March 2022.
- Adhikary, Tuhin Shubhra (8 June 2022). "High-speed rail network: China seeks MoU ASAP". The Daily Star. Retrieved 21 June 2022.
- "JS whip: Bullet train on Dinajpur-Dhaka route by 2027". www.dhakatribune.com. 4 February 2023. Retrieved 1 April 2023.
- "Cambodia to examine possibility of developing and expanding existing railways into high-speed railways - Khmer Times". 17 December 2021. Retrieved 8 April 2022.
- "PM Mulls High Speed Rail Plan ⋆ Cambodia News English". Cambodia News English. 16 December 2021. Retrieved 8 April 2022.
- Pisei, Hin. "Cambodia-Thailand rail reconnected after 45 years". www.phnompenhpost.com. Retrieved 8 April 2022.
- "Cambodia considers high-speed rail development - Khmer Times". 4 April 2022. Retrieved 8 April 2022.
- "PM on his way back to Cambodia after successful China trip - Khmer Times". 11 February 2023. Retrieved 1 April 2023.
- Smith, Kevin (13 February 2023). "China pledges funding for Cambodian railway upgrade". International Railway Journal. Retrieved 1 April 2023.
- "Railways likely to propose creation of four new bullet train corridors taking total to 12 - The New Indian Express". www.newindianexpress.com. Retrieved 25 January 2022.
- "Japan hopes to sell bullet trains to India | Local | House of Japan - Japan News Technology Autos Culture Life Style". Archived from the original on 15 November 2011. Retrieved 27 February 2012.
- "India to get shinkansen sales blitz | the Japan Times Online". Archived from the original on 23 April 2012. Retrieved 27 February 2012.
- "France to help India realise high-speed train dream | mydigitalfc.com". Archived from the original on 1 January 2013. Retrieved 27 February 2012.
- "Spains Talgo eyes high-speed train biz, plans office in India". 6 October 2011.
- "Japan and India agree bullet train, nuclear deals". news.yahoo.com. Retrieved 25 January 2022.
- "First glimpse of Mumbai-Ahmedabad bullet train - Mumbai-Ahmedabad bullet train". The Economic Times. Retrieved 25 January 2022.
- "India's First-ever Bullet Train Set to Roll by 2026, says Railway Minister". News18. 8 December 2021. Retrieved 25 January 2022.
- "India's bullet train faces 5-year delay: High costs, Japan firms not so keen". The Indian Express. 6 September 2020. Retrieved 25 January 2022.
- "Confident Of Running First Bullet Train In 2026: Ashwini Vaishnaw". odishabytes. 6 June 2022. Retrieved 2 August 2022.
- "Kerala's SilverLine: why it has been planned, why it is facing protests". The Indian Express. 22 December 2021. Retrieved 2 August 2022.
- "Project at a glance". Archived from the original on 25 November 2021. Retrieved 25 November 2021.
- "SilverLine debate: Has K-Rail fallen for the trap set by Japan?". OnManorama. Retrieved 2 August 2022.
- "Deadline for social impact study over, SilverLine loses steam". The New Indian Express. Retrieved 2 August 2022.
- "SilverLine a burden on Kerala, Indian Railways: Ashwini Vaishnaw". The New Indian Express. Retrieved 2 August 2022.
- "Delhi-Varanasi Bullet Train to Cover 800km distance in less than 4 hours". TimesNow. Retrieved 2 August 2022.
- Sikarwar, Ayushi (28 July 2022). "Delhi-Varanasi Bullet Train: 10 hours long journey confined for 3, Railway's mega plan on floor". NewsroomPost. Retrieved 2 August 2022.
- Tekwani, Muskaan. "Aerial inspection of New Delhi-Lucknow-Varanasi bullet train's elevated tracks underway". Knocksense. Retrieved 2 August 2022.
- "Mysuru-Chennai High-Speed Rail: Govt. To Acquire Land". Star of Mysore. 30 July 2022. Retrieved 2 August 2022.
- INTRODUCTION OF HIGH SPEED CORRIDORS ON I.R.: IMPACT AND CHALLENGES BEFORE CIVIL ENGINEERS - Parmod Kumar, EDCE(G)/Railway Board
- "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". The Times of India. 23 January 2021.
- Agarwal, Anshu (31 January 2021). "Delhi likely to get 2 stations under 3 proposed Bullet train projects". Business Standard India.
- Agarwal, Anshu (22 February 2021). "Aarvee-GSL Wins Chennai-Mysuru HSR's LiDAR & Alignment Design".
- "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". Times of India. 23 January 2021.
- "Growever Wins Varanasi – Howrah HSR's LiDAR & Alignment Design". 9 April 2021.
- "High speed rail corridor: Travel time from Mumbai to Hyderabad and Nagpur to reduce by 50 percent". Mumbaimirror.indiatimes.com. 31 January 2020. Retrieved 11 June 2020.
- "Big boost for city as Pune-Nashik high-speed rail project gets Centre's in-principle approval". Hindustan Times. 5 February 2023. Retrieved 20 April 2023.
- "Ahmedabad-Rajkot new rail link approved; to help Saurashtra region avail Bullet Train services". Financialexpress. Retrieved 20 April 2023.
- Shah, Narendra (23 December 2022). "A Silverline Project to connect entire Kerala". Metro Rail News. Retrieved 20 April 2023.
- "Indonesia to Build Railway for High-Speed Trains". RedOrbit, 7 February 2006.
- "Indonesia Plans 'Beauty Contest' Between China and Japan for High-Speed Train". Jakarta Globe. 14 July 2015. Retrieved 1 October 2015.
- "Indonesia to award fast train contract to China – Japanese embassy official". Reuters. 29 September 2015. Retrieved 1 October 2015.
- "Indonesia awards multi-billion-dollar railway project to China over Japan". ABC. 30 September 2015. Retrieved 1 October 2015.
- "Proyek Kereta Super Cepat Jakarta-Surabaya Pakai Dana Utang 40 Tahun". 21 February 2012.
- "Groundbreaking of High Speed Rail Project Jakarta – Bandung". WIKA. 21 January 2016.
- Bestari, Fardi (13 April 2021). "Progres Pembangunan Proyek Kereta Cepat Jakarta - Bandung" [Jakarta - Bandung High Speed Rail Project Development Progress]. Tempo.co (in Indonesian). Retrieved 25 January 2022.
- Dita Alangkara (14 October 2022). "Indonesia Gears Up to Start its First High-Speed Rail Line". The Diplomat. Retrieved 24 October 2022.
- "Indonesia in Talks with China on High-Speed Rail Cost Overrun". D-Insights. 2 August 2022. Retrieved 2 August 2022.
- Fahky, Adimas (11 February 2022). "Govt urged to review Jakarta-Semarang high-speed train project". Antara News. Retrieved 16 March 2022.
- Adimas Raditya, F P (9 February 2022). "Transportation Ministry outlines prioritised railway projects in 2022". Antara News. Retrieved 16 March 2022.
- "تامین اعتبار ۲ میلیارد یورویی در مرحله اول توسعه راهآهن تهران-قم- اصفهان/ تکمیل آزادراه کنارگذر شرق اصفهان/ عقد قرارداد توسعه فرودگاه اصفهان با چهارمین شرکت عمرانی جهان" (in Persian). 24 August 2016. Retrieved 12 September 2016.
- "Pandemic Not Likely to Stop China From Building Influence in Iran". VOA. Retrieved 2 January 2022.
- "Iran, Italy Sign High-Speed Rail Deal". Financial Tribune. 11 July 2017. Retrieved 2 January 2022.
- "Italy's state train company to help Iran develop rail system". Reuters. 9 February 2016. Retrieved 2 January 2022.
- "Chinese firms to build Qom-Arak railway line". irandaily.ir. Retrieved 2 January 2022.
- "Iranian Railway Projects In Jeopardy Of Being Canned, Due To Trump's Sanctions". caspiannews.com. Retrieved 2 January 2022.
- "در صورت تامین مالی طرح قطار پرسرعت، مسیر تهران – مشهد تا پنج سال دیگر 3 ساعت و نیمه می شود". danakhabar.com. Retrieved 12 September 2016.
- "China quits Tehran-Mashhad railway electrification project". Mehr News Agency. 23 January 2021. Retrieved 2 January 2022.
- Mirovsky, Arik (17 November 2020). "The goal: Tel Aviv to Beersheva by train in 35 minutes". Globes. Retrieved 20 November 2020.
- "Israel Plans 30-Minute High-Speed Train From Haifa to Tel Aviv". The Algemeiner. Retrieved 16 March 2022.
- "Abe says gov't will bring forward Tokyo-Osaka maglev train service - the Mainichi". Archived from the original on 2 June 2016. Retrieved 13 June 2016.
- "Japanese maglev train breaks 600 kph record in last of test runs". International Business Times UK. 21 April 2015.
- "Shinkansen to get 3 new sections : National : DAILY YOMIURI ONLINE (The Daily Yomiuri)". Archived from the original on 7 July 2012. Retrieved 30 June 2012.
- "Kazakhstan plans 1 000 km high speed line". Railway Gazette International. 13 March 2013.
- "Kazakhstan to build first high-speed line". International Railway Journal. 13 March 2013.
- "President Opens Train Manufacturing Plant "Tulpar-Talgo"". 9 December 2011.
- Hashimova, Umida. "What a New High-Speed Railway Tells Us About Kazakhstan-Uzbekistan Relations". thediplomat.com. Retrieved 20 April 2022.
- "Ташкент и Туркестан свяжет высокоскоростная ж/д магистраль". Газета.uz (in Russian). 28 January 2021. Retrieved 20 April 2022.
- "Ким Чен Ын прокатится на поезде ВСМ". www.rzd-partner.ru.
- "KL-Singapore bullet train derailed by high cost". 23 April 2008. Archived from the original on 23 April 2008.
- "Siemens keen on Kuala Lumpur-Singapore high-speed train deal". 7 April 2007. Archived from the original on 17 July 2010.
- "BERNAMA - YTL Hopes for Bullet Train Project to Materialise". Archived from the original on 4 June 2011. Retrieved 17 December 2009.
- "Fast track the Sípore bullet train project". 4 July 2009. Archived from the original on 4 July 2009.
- http://www.sun2surf.com/article.cfm?id=47759%5B%5D
- "KL-Singapore high-speed link to kick off". Investvine.com. 20 February 2013. Retrieved 27 February 2013.
- Senator Datuk Abdul Rahim Rahman (25 June 2011). "High-speed rail will spur growth in hub cities". The Star.
- "Report: KL-Singapore rail link could be RM50b cheaper | Malay Mail". www.malaymail.com. Archived from the original on 19 June 2018. Retrieved 19 June 2018.
- Yong, Charissa (5 September 2018). "Malaysia, Singapore ink agreement to defer high-speed rail project for 2 years; KL to pay S$15m for suspending work". The Straits Times. Retrieved 1 October 2018.
- Lim, Adrian (31 January 2019). "Deferred High-Speed Rail deal: Malaysia informs Singapore of $15m remittance". The Straits Times. Retrieved 1 October 2018.
- Yusof, Amir (31 May 2020). "Malaysia, Singapore agree to defer HSR project until Dec 31: Khaw Boon Wan". CNA. Retrieved 16 July 2021.
- Tham, Yuen-C (1 January 2021). "KL-Singapore High Speed Rail terminated after both countries fail to reach agreement on M'sia's proposed changes to project". The Straits Times. Retrieved 1 January 2021.
- Baharudin, Hariz (29 March 2021). "Malaysia pays S'pore $102.8 million for costs incurred in terminated HSR project". The Straits Times. Retrieved 16 July 2021.
- Azman, Nur Hanani (16 March 2022). "KL-Bangkok HSR may not be economically viable". The Malaysian Reserve. Retrieved 16 March 2022.
- Jaafar, Fayyadh (19 July 2022). "Govt to continue high-speed rail projects". The Malaysian Reserve. Retrieved 23 July 2022.
- Shadique, Jassmine (11 May 2023). "Malaysia and Singapore keen to revive KL-Singapore HSR project". New Straits Times. Retrieved 16 May 2023.
- "Full steam ahead for China-Myanmar high-speed railway". Asia Times Online. 21 February 2019. Retrieved 31 August 2019.
- "China-Myanmar high-speed railway quietly back on track". The Myanmar Times. 6 July 2018. Retrieved 31 August 2019.
- Prabhu, Conrad; Observer, Oman Daily. "Nod for GCC Railway Authority spurs hopes for revival of Omani rail project". www.zawya.com. Retrieved 6 May 2022.
- "Oman halts work on trans-Gulf rail link". Global Construction Review. 4 May 2016. Retrieved 6 May 2022.
- "Oman Rail". 12 February 2017. Archived from the original on 12 February 2017. Retrieved 6 May 2022.
- "Pakistan can't afford to have bullet trains: Railway minister". The Times of India. 30 November 2016. ISSN 0971-8257. Retrieved 20 April 2023.
- "Javed Afridi hints at introducing bullet train from Peshawar to Karachi". Global Village Space. 15 January 2021. Retrieved 6 May 2022.
- "2010-10-01". Retrieved 12 October 2010.
- "High speed Dubai to Abu Dhabi rail plan revealed". arabiansupplychain.com. Retrieved 12 October 2010.
- International2010-12-09T11:18:00, Railway Gazette. "Urban rail network to underpin Qatar World Cup". Railway Gazette International.
- "Saudi-Qatar reconciliation, from a divisive canal to a railroad connection". Doha News | Qatar. 11 January 2022. Retrieved 14 January 2022.
- "Saudi Arabia's The Line is what happens when tech bro culture meets Middle Eastern autocracy". New Statesman. 1 August 2022. Retrieved 2 August 2022.
- "Ministry studies project linking Riyadh and Eastern Province with a fast train". Saudigazette. 5 September 2022. Retrieved 1 April 2023.
- Writer, Staff; Times, Arab. "Systra tasked with studying railway link between Saudi Arabia & Kuwait". www.zawya.com. Retrieved 9 May 2023.
- "San Miguel mulls bullet train project". Philstar.com (The Philippine Star Online). 26 March 2010. Archived from the original on 6 September 2012.
- "Philippine San Mig eyes airport, bullet train deals for infrastructure". The Malaysian Insider. 11 April 2010. Archived from the original on 28 March 2010.
- "NEDA says MRT-7 and bullet train projects under BOT". Manila Bulletin. 17 April 2013.
- "Towards Improving Connectivity Between the Bicol and Calabarzon Regions". nro5.neda.gov.ph. National Economic and Development Authority. Archived from the original on 14 November 2019. Retrieved 8 February 2020.
- Agence France-Presse. "FACT CHECK: No, this is not a map of the Philippines' high-speed rail system". ABS-CBN News. Retrieved 8 February 2019.
- Sarmiento, Bong (27 November 2019). "Dream train for Mindanao still in the doldrums". MindaNews. Retrieved 1 February 2020.
- "SRT to seek funds for infrastructure". The Nation. 29 October 2009. Archived from the original on 8 October 2012.
- "SCabinet approves Bt100 billion hi-speed rail construction plan". MCOT English News. 11 November 2009. Archived from the original on 19 November 2009.
- "Thailand to negotiate with China on high-speed proposal – International Railway Journal". 30 October 2010. Archived from the original on 1 November 2010. Retrieved 30 October 2010.
- Marukatat, Saritdet (13 May 2013). "Rayong added to high-speed rail link". Bangkok Post. Retrieved 23 July 2022.
- "Japan sets high-speed railway survey". Bangkok Post. 29 July 2015.
- Mahitthirook, Amornrat (25 January 2016). "Military government set to link 3 airports". Bangkok Post. Retrieved 23 July 2022.
- Theparat, Chatrudee; Chantanusornsiri, Wichit (14 February 2018). "EEC high-speed railway to steer clear of Rayong on safety fears". Bangkok Post. Retrieved 23 July 2022.
- "Thailand signs agreement to build Bangkok-Pattaya rail link". South China Morning Post. 24 October 2019. Retrieved 23 July 2022.
- Hongtong, Thodsapol (25 July 2018). "Losses predicted for high-speed railway". Bangkok Post. Retrieved 23 July 2022.
- Hongtong, Thodsapol (27 September 2019). "Govt mulls end of fast train plan". Bangkok Post. Retrieved 23 July 2022.
- "ก.คมนาคม ยันญี่ปุ่นไม่ยกเลิกลงทุนรถไฟความเร็วสูง". thaipbs.or.th (in Thai). 27 October 2018.
- ""กรมราง" ถก "ญี่ปุ่น" เร่งศึกษาลงทุนรถไฟความเร็วสูง "กรุงเทพฯ-เชียงใหม่" จบใน มี.ค. 66". 14 December 2022.
- "Muhyiddin floats idea of KL-Bangkok high-speed rail in Parliament | Coconuts". coconuts.co/. Retrieved 23 July 2022.
- Bernama (17 May 2022). "Malaysia, Thailand agree to set up special committee on HSR project". Free Malaysia Today. Retrieved 23 July 2022.
- "Thailand Sets 2028 Target to Finish High-Speed Rail Link with China". VOA. Retrieved 23 July 2022.
- "Bangkok-Chiang Mai rail project gears up". Bangkok Post. 8 March 2023. Retrieved 1 April 2023.
- Chen, Stephen (15 May 2023). "China will transfer high-speed railway tech to Thailand, engineers say". South China Morning Post. Retrieved 16 May 2023.
- "Ankara-Sivas YHT hattı yıl sonunda hizmete alınacak". www.trthaber.com (in Turkish). Retrieved 20 April 2022.
- "Testing underway on Ankara – Sivas high speed line". Railway Gazette International. 9 March 2020. Retrieved 20 April 2022.
- "Ankara Sivas High Speed Train Project Completion Date Announced". Raillynews. 1 January 2020. Retrieved 20 April 2022.
- "Domestic Rail Used for the First Time on Ankara Sivas High Speed Train Line". 16 March 2023. Retrieved 1 April 2023.
- "99,67 percent physical progress was achieved in Ankara-Sivas High Speed Line". 22 November 2022. Retrieved 1 April 2022.
- "The design of the high-speed railroad Sivas-Erzincan in Turkey was completed | RailTarget". www.railtarget.eu. Retrieved 20 April 2022.
- "Bakan Karaismailoğlu'ndan Kayseri'ye hızlı tren müjdesi - Son Dakika Haberler". 16 December 2021. Archived from the original on 16 December 2021. Retrieved 20 April 2022.
- Preston, Robert (30 July 2022). "Work starts on Yerköy - Kayseri high-speed line in Turkey". International Railway Journal. Retrieved 2 August 2022.
- "Turkey breaks ground for new high-speed line". RailTech.com. Retrieved 2 August 2022.
- "Ankara İzmir YHT 2022 Yılı Sonunda Tamamlanıyor | RayHaber | RaillyNews". 29 June 2020. Archived from the original on 29 June 2020. Retrieved 20 April 2022.
- "Ankara-İzmir Yüksek Hızlı Tren Hattı'nda çalışmalar hızlanıyor". www.trthaber.com (in Turkish). Retrieved 20 April 2022.
- Ozarfat, Esra (1 April 2021). "Bursa'nın hızlı treni 2023'te raylarda". Dunya. Archived from the original on 1 April 2021. Retrieved 20 April 2022.
- "Halkalı-Kapıkule 'hızlı' demir yolu hattının yapımı sürüyor". www.aa.com.tr. Retrieved 20 April 2022.
- "Halkalı-Kapıkule Demir Yolu Projesi'nin Edirne'deki viyadük çalışmaları sürüyor". www.aa.com.tr. Retrieved 20 April 2022.
- "Turkmenistan will build high-speed train line". Railly News. 5 January 2012. Retrieved 20 April 2022.
- Asian Development Bank (29 December 2021). "Loan Agreement (Ordinary Operations) for Loan 4170-UZB: Central Asia Regional Economic Coperation (sic) Corridor 2 (Bukhara-Miskin-Urgench-Khiva) Railway Electrification Project". Asian Development Bank. Retrieved 21 June 2022.
- Allan, Keri (2 August 2022). "DB Engineering and Consulting to Oversee Rail Electrification Project in Uzbekistan". Railway-News. Retrieved 2 August 2022.
- "High-speed trains to Nukus to be launched in Uzbekistan". m.akipress.com. Retrieved 1 April 2023.
- "The hare and the tortoise". Railway Gazette International. 21 September 2009.
- "Vietnam to build high-speed rail with Japan aid". Reuters News. 20 July 2006. Retrieved 20 July 2006.
- "Vietnam Railways Website (English)". Vietnam Railways. Archived from the original on 10 May 2008. Retrieved 10 May 2008. Check the timetable from Ha Noi to Sai Gon (or vice versa) to see journey times.
- "Railway plans to build 880 km express line". Viet Nam News. 20 July 2006. Retrieved 20 July 2006.
- Bill Hayton (20 July 2006). "Vietnam plans new railway link". BBC News. Retrieved 20 July 2006.
- "National Assembly rejects express railway project". VietNamNet Bridge. 21 June 2010. Archived from the original on 28 June 2010. Retrieved 21 June 2010.
- "Vietnamese legislators reject $56B bullet train in rare move against Communist leaders". Metro News Vancouver. Associated Press. 21 June 2010. Retrieved 21 June 2010.
- "Cross-border upgrading advances".
- "Vietnam announces start date for 1,500km North–South railway". Global Construction Review. 2 November 2021. Retrieved 20 March 2022.
- Tuan, Viet (22 July 2022). "PM requests Japan's help for north-south high speed railway". VN Express. Retrieved 23 July 2022.
- VnExpress. "Trans-Vietnam high-speed railway work to start by 2030 - VnExpress International". VnExpress International – Latest news, business, travel and analysis from Vietnam. Retrieved 1 April 2023.
- "ЗА ЧАС ИЗ СМОЛЕНСКА ДО МИНСКА: КИТАЙЦЫ ПЛАНИРУЮТ ПОСТРОИТЬ В БЕЛАРУСИ СКОРОСТНУЮ ЖЕЛЕЗНУЮ ДОРОГУ (in Russian) An hour from Smolensk to Minsk: The Chinese plan to build a high-speed railway in Belarus". rus-bel.online. 22 May 2017. Retrieved 25 January 2022.
- "Infrabel and SNCB to open Mechelen rail bypass". International Railway Journal. 9 December 2020. Retrieved 25 January 2022.
- "Vláda schválila více peněz pro vědu i školství a plán rozvoje vysokorychlostní železnice v ČR". www.vlada.cz (in Czech). Retrieved 26 January 2021.
- Sura, Jan (23 April 2018). "Polabí či Moravská Brána. SŽDC začala řešit "izolované" vysokorychlostní tratě". Retrieved 25 January 2021.
- Hayes, Mike (3 March 2020). "Dresden-Prague high-speed rail gets nod". khl.
- "Budapest – Cluj high-speed design tender gets underway". International Railway Journal. 3 February 2020. Retrieved 4 February 2020.
- "Study to investigate Belfast – Dublin – Cork high-speed line". International Railway Journal. 4 August 2020. Retrieved 26 September 2020.
- "Review of €15bn high-speed rail line linking Dublin, Belfast, Cork". Irish Times. 5 August 2020. Retrieved 26 September 2020.
- treinreiziger.nl (14 December 2021). "Spoorbodem zorgt voor problemen: snelheidsbeperkingen voor nieuwe treinen dreigen". Treinreiziger.nl (in Dutch). Retrieved 10 February 2022.
- Jernbaneverket: Oppsummering og hovedkonklusjoner for høyhastighetsutredningen (Norwegian)
- Russell, Edward; September 29th, Skift; EDT, 2022 at 6:48 AM. "Portugal Plans $4.7 Billion Lisbon-Porto High-Speed Rail Line". Skift. Retrieved 24 October 2022.
- Portugal, Rádio e Televisão de. "Governo quer linha ferroviária de Alta Velocidade entre Lisboa e Porto". Governo quer linha ferroviária de Alta Velocidade entre Lisboa e Porto.
- "Romania to study first high-speed railway and revamp rail infrastructure". RailTech.com. Retrieved 29 April 2022.
- "Potential Investors Get Preview of Moscow-Kazan High-Speed Rail Project". 4 March 2014. Retrieved 5 August 2016.
- "BanaVäg i Väst - BanaVäg i Väst". Archived from the original on 27 October 2010. Retrieved 17 September 2012.
- "The Swedish ERTMS Programme - Trafikverket". Archived from the original on 25 August 2010. Retrieved 17 September 2012.
- "Vagnguide - Motorvagn X55 | Järnväg.net - guiden till Sveriges tåg och järnvägar". Archived from the original on 18 August 2012. Retrieved 17 September 2012.
- "Norrbotniabanan - Trafikverket". Archived from the original on 2 April 2015. Retrieved 28 March 2015.
- "Ostlänken - Trafikverket". Archived from the original on 16 September 2012. Retrieved 17 September 2012.
- http://www.trafikverket.se/PageFiles/11971/Kapacitetssituation%202009.pdf%5B%5D Överbelastad kapacitet|Trafikverkets kapacitetsrapport 2009.|page|14
- "Götalandsbanan - Trafikverket". Archived from the original on 25 May 2012. Retrieved 20 July 2010.
- "Europabanan". Archived from the original on 23 September 2009. Retrieved 11 November 2010.
- "Statens budget 2011" [State Budget 2011]. Government.se (in Northern Sami). Regeringskansliet. Archived from the original on 22 March 2011.
- "Скоростной железнодорожный транспорт в Украине | Харьковчане за электротранспорт".
- "Ukrainian Railways to study first high-speed rail line to Poland in European gauge". RailTech.com. Retrieved 1 April 2023.
- "HS2 Phase One full business case". GOV.UK. Archived from the original on 19 April 2020. Retrieved 17 April 2020.
- Greengauge 21 (May 2018). Beyond HS2 (PDF) (Report).
- "Mapping Australia's high-speed rail routes". www.railway-technology.com. 6 November 2018.
- Rabe, Matt O'Sullivan, Tom (11 May 2022). "'Radically faster': Parramatta at centre of NSW's high-speed rail future". The Sydney Morning Herald. Retrieved 11 May 2022.
- "Multibillion-dollar cost of Hamilton to Auckland Rapid Rail service revealed". Stuff (Fairfax). 25 August 2020.
- "Hamilton to Auckland Intercity Connectivity – Interim Indicative Business Case" (PDF). July 2020.