Aqua Line (Pune Metro)
Aqua Line of the Pune Metro is the second line of the city's mass transit network. It will run from Ramwadi to Vanaz via Mangalwar Peth and Deccan Gymkhana. The section from Vanaz to Garware College was inaugurated on 6th March 2022 by Prime Minister Narendra Modi. The trials of next section from Garware College to Ruby Hall Clinic have been started. The section from Garware College to Ruby Hall Clinic is expected to open soon.
Aqua Line | |
---|---|
Overview | |
Status | Operational |
Locale | Pune |
Termini | |
Stations | 16 5 (Operational) |
Service | |
Type | Rapid Transit |
System | Pune Metro |
Operator(s) | MahaMetro |
Rolling stock | Titagarh Firema |
History | |
Opened | 6 March 2022 |
Technical | |
Line length | 14.66 km (Planned) 5 km (Operational) 9.66 km (Under Construction) |
Character | Elevated |
Route
The elevated line will cover a distance of 14.66 km (9.11 mi) and will have 16 stations. It will connect with the Purple Line and Line 3 at the Civil Court interchange station. The maintenance depot for the Aqua Line will be located near the Vanaz station on the former garbage depot land.[1][2]
List of stations
Following is a list of stations on this route-
Aqua Line | |||||||
---|---|---|---|---|---|---|---|
# | Station name | Opening | Connections | Layout | |||
English | Marathi | ||||||
1 | Vanaz | वनाझ | March 6, 2022 | None | Elevated | ||
2 | Anand Nagar | आनंदनगर | March 6, 2022 | None | Elevated | ||
3 | Ideal Colony | आयडियल कॉलनी | March 6, 2022 | None | Elevated | ||
4 | Nal Stop | नळ स्टॉप | March 6, 2022 | None | Elevated | ||
5 | Garware College | गरवारे महाविद्यालय | March 6, 2022 | None | Elevated | ||
6 | Deccan Gymkhana | डेक्कन जिमखाना | Under construction | None | Elevated | ||
7 | Chhatrapati Sambhaji Udyan | छत्रपती संभाजी उद्यान | Under construction | None | Elevated | ||
8 | PMC Bhavan | पुणे महानगरपालिका भवन | Under construction | None | Elevated | ||
9 | Civil Court | दिवाणी न्यायालय | Under construction | Purple Line & Line 3 | Elevated | ||
10 | Mangalwar Peth | मंगळवार पेठ | Under construction | None | Elevated | ||
11 | Pune Railway Station | पुणे रेल्वे स्टेशन | Under construction | Pune Junction railway station | Elevated | ||
12 | Ruby Hall Clinic | रुबी हॉल क्लिनिक | Under construction | None | Elevated | ||
13 | Bund Garden | बंड गार्डन | Under construction | None | Elevated | ||
14 | Yerwada | येरवडा | Under construction | Rainbow BRTS | Elevated | ||
15 | Kalyani Nagar | कल्याणी नगर | Under construction | Rainbow BRTS | Elevated | ||
16 | Ramwadi | रामवाडी | Under construction | Rainbow BRTS | Elevated |
References
- "MahaMetro takes possession of 35 hectares of land for project". The Times of India. 27 April 2018. Retrieved 4 May 2018.
- "MahaMetro gets land for depot and multi-modal hub". The Times of India. 17 March 2018. Retrieved 4 May 2018.