Shiraz Metro

The Shiraz Metro (Persian: متروی شیراز, Metro-yé Shiraz) is the rapid transit system in Shiraz, Fars, Iran, operated by Shiraz Urban Railway Organization. Construction began in 2001, and service in the first line officially commenced on 11 October 2014.[3]

Shiraz Metro
SURO
Overview
OwnerShiraz Municipality
LocaleShiraz, Fars, Iran
Transit typeRapid transit
Number of lines6 (2 active)
Number of stations23
Daily ridership100,000 (2019) 25,000 (During Covid- 2020)[1]
Annual ridership18,000,000 (2019) [2]
Websitehttp://shirazmetro.ir
Operation
Began operation11 October 2014
Operator(s)Shiraz Urban Railway Organization
Number of vehicles13 trains
Train length5-cars
Headway12 minutes
Technical
System length32.5 km (20.2 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1.5 kV DC overhead line
System map

Lines

The Shiraz Metro consists of 6 lines. As of 2023, Line 1 and 2 are operating,[4] Line 3 is under construction, and the remaining 3 lines are at different stages of design and planning.

Line Number Year First Opened Expected Year of Extension Length (km) Total No. of Stations Type Condition
1 2014 2020 24.5 20 Metro Active
2 2023 TBA 15 13 Metro Active
3 TBA TBA 10 7 Metro Under construction
4 TBA TBA TBA TBA Metro Design phase
5 TBA TBA TBA TBA Metro Design phase
6 TBA TBA TBA TBA Metro Primary design phase
Current total 32.5 23

Line 1

Shiraz Metro's Line 1

Constructions for Line 1 were started in 2001, and the first phase for this line was officially commenced by Vice-president Eshaq Jahangiri on October 11, 2014. The first phase runs for 11 kilometres between Ehsan Sq. in the north-western part of the city and Namazi Sq. in downtown with eight stations in between. Line 1 runs over the ground surface between Mirza-yé Shirazi and Shahed stations.[5] The second phase was recently commenced and service in now operational all the way to the Gol-é-Sorkh Sq., located just by the city airport in the south-eastern part of the city. This has extended Line 1 to 24.5 kilometres with 19 underground and 1 surface stations in between.

At the 13.5-kilometre (8.4 mi) southern end of Line 1, two separate tunnels, each with a diameter of 6 metres (20 ft), were constructed,[3] with the rest was built as a double track cut-and-cover tunnel. Stations in shallow underground sections have side platforms, while deep-level stations have island platforms.

Stations
One of the stations
Shiraz Line 1 stations
Number Name Location Condition Began operation
1 Shahid Dastgheyb Next to Shiraz Airport Active 2017
2 Shahid Doran Modares Boulevard Active 2017
3 Forsat-e Shirazi Modares Boulevard Active 2018
4 Janbazan Modares Boulevard Active 2018
5 Ghadir Modares Boulevard Active 2018
6 Razi Modares Boulevard Active 2017
7 Fazilat Modares Boulevard Active 2017
8 Kaveh Modares Boulevard Next to Bus Terminal Active 2018
9 Valiasr Valiasr Square Active 2017
10 Vakilorroaya Zand Street Active 2020
11 Zandiyeh Zand Boulevard Active 2015
12 Imam Hossein Imam Hossein Square Active 2019
13 Namazi Namazi Square Active 2014
14 Shahid Avini Shahid Avini Street Active 2017
15 Shahid Motahari Shahid Motahari Square Active 2017
16 Qasrodasht Qasrodasht Square Active 2014
17 Shahed Shahed Boulevard Active 2015
18 Mirza-ye Shirazi Mirza-ye Shirazi Boulevard (MoalyAbad Boulevard) Active 2015
19 Shari'ati Mirza-ye Shirazi Boulevard (MoalyAbad Boulevard) Active 2014
20 Ehsan Ehsan Square Active 2014

Line 2

Approved Expansion plans

The 15-kilometre (9.3 mi) Line 2 officially opened on February 8, 2023, with 3 stations as the first phase.[4] It intersects with Line 1 at Imam Hossein Sq.[3]

Line 2 runs to Mian Rood and Aadel Abad via Enghelab Street and Basij Square. There are two separate tunnels, each with 7 metre in diameter, at the depth of 15 metres. Among the 13 planned stations, 2 of them will be on the surface.

Line 3 (to Sadra)

The seven-station, 10-kilometre (6.2 mi) Line 3 is under construction. First station will start from Mirza-ye Shirazi Metro Station in Line 1 and connects to Sadra, Fars, new city in northwest of Shiraz.[3]

Future Lines

Envisioned Expansion plans

Lines 4, 5 and 6 are in the design stage.

Rolling stock

Line 1 is being operated using a fleet of 27 five-car 1.5 kV DC overhead electric train-sets which were supplied by the Chinese CNR Corporation and a local partner (IRICO), under a contract awarded in November 2010.[5]

Network Map


See also

References

  1. "افزایش ظرفیت حمل مسافر مترو در شیراز". 2 September 2020.
  2. "کدام شهرهای کشور مترو دارند؟ (Jan 29 2019)". www.isna.ir. 29 January 2019. Retrieved 18 July 2019.
  3. "Shiraz metro Line 1 opens". Railway Gazette International. 15 October 2014. Retrieved 29 November 2014.
  4. "Line 2 of Shiraz metro". IRNA. Retrieved 9 February 2023.
  5. Ltd, DVV Media International. "Shiraz metro Line 1 opens". railwaygazette.com.

Media related to Shiraz Metro at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.