Vande Bharat Express
Vande Bharat Express is a medium-distance superfast express service operated by Indian Railways. It is a reserved, air-conditioned chair car service connecting cities that are less than 800 km (500 mi) apart or take less than ten hours to travel with existing services. The train entered commercial service on 15 February 2019.
Vande Bharat Express | |
---|---|
![]() ![]() Vande Bharat Express trains in different liveries | |
Overview | |
Service type | Inter-city semi-high-speed rail |
Status | Active |
Predecessor | Shatabdi Express |
First service | 15 February 2019 |
Website | indianrail |
Route | |
Line(s) used | 51 |
On-board services | |
Class(es) | AC Chair Car (C) AC Executive Class (E) |
Seating arrangements |
|
Catering facilities | On-board catering |
Observation facilities | Wide windows |
Entertainment facilities |
|
Baggage facilities | Overhead racks |
Other facilities | |
Technical | |
Rolling stock | Vande Bharat (trainset) |
Track gauge | 1,676 mm (5 ft 6 in) broad gauge |
Electrification | 25 kV 50 Hz AC Overhead line |
Operating speed | 160 km/h (99 mph) (maximum) 83 km/h (52 mph)[1][2] (average) |
Average length | 384 m (1,260 ft) (16 coaches) 192 m (630 ft) (8 coaches) |
The trainsets are self-propelling Electric Multiple Units (EMU)s with eight or sixteen coaches. The trainset was designed and manufactured by Integral Coach Factory in Chennai. Introduced in 2018, the trainsets achieved semi-high speeds of 183 km/h (114 mph) on trials, but the operational speed is limited due to track restrictions, halts and traffic congestion. The maximum operational speed of 160 km/h (99 mph) is achieved by the Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express and Hazrat Nizamuddin-Khajuraho Vande Bharat Express on the Tughlakabad–Agra section.
History
Efforts to increase speed (1960–2016)
In 1960, the Railway Board of India commissioned a study to increase the speed of its trains, which was restricted to 96 km/h (60 mph) on the existent broad gauge lines.[3] A target of 160 km/h (99 mph) with an intermediate stage of 120 km/h (75 mph) was set for passenger trains. Research Design and Standards Organisation (RDSO) started work on the same and using the coaches were manufactured by the Integral Coach Factory (ICF) at Madras and hauled by diesel locomotives, Rajdhani Express capable of reaching speeds of up to 120 km/h (75 mph) were introduced in 1969.[4][5] With the introduction of WAP-1 electric locomotives, Shatabdi Express introduced in 1988, were capable of running at a maximum speed of 130 km/h (81 mph).[6] [7][8]

From the late 1990s, the ICF coaches were replaced by safer and newer LHB coaches designed by Linke-Hofmann-Busch of Germany.[9][10] In December 2009, the Ministry of Railways of Government of India envisaged the implementation of high-speed rail projects to provide services at 250–350 km/h (160–220 mph) with the up-gradation of existing tracks, construction of new lines and introduction of high speed trainsets.[11][12] In 2014, proposals were made to introduce semi-high-speed 160–200 km/h (99–124 mph) services between major cities.[13] In 2016, Gatimaan Express was inaugurated which achieved speeds of 160 km/h (99 mph) between Delhi and Agra.[14]
In June 2016, Indian Railways sought Requests For Qualification (RFQ) to jointly manufacture five thousand Electric Multiple Unit (EMU) sets with interested international and domestic parties.[15] In 2015, Talgo conducted trial runs on the Mumbai–Delhi line, completing the journey in ten hours, almost six hours quicker than the existing fastest train with an average speed of 117.5 km/h (73.0 mph). There were significant issues such as the adaptation of rakes, maintenance, higher costs and robustness.[16] Indian Railways could not reach a direct agreement and the deal never materialised.[17]
Making an indigenous trainset (2016–19)
After foreign proposals for introducing semi-high-speed trains were unsuccessful, the Make in India campaign fuelled the cause for developing the next generation EMU semi-high-speed trainsets locally. ICF worked on an indigenous design, which was constructed at the Integral Coach Factory.[18] These trainsets known as Train 18 initially, were introduced in 2018 and reached speeds of up to 183 km/h (114 mph) in trials.[19] It trainset was later renamed to Vande Bharat.[20]
Introduction and further (2019–present)

On 15 February 2019, the first Vande Bharat Express between New Delhi and Varanasi was flagged off at the New Delhi railway station by Prime Minister Narendra Modi.[21][22] The train covered a distance of 759 km (472 mi) in 8 hours at an average speed of 95 km/h (59 mph) and reduced the existing travel time along the route by 15%.[23] In October 2019, the second service was launched between New Delhi and Katra.[24]
After the inauguration of the first two services, Indian Railways stopped production of new trainsets owing to internal issues.[25] In 2019, Indian Railways resumed tenders for the production of new sets with more time provided to come up with the cheapest bid for the upgrades required.[26] The second generation trainsets entered service on 30 September 2022.[27] Since Vande Bharat trains provide fast service across short-distances, similar to the Shatabdi Express, the trains will eventually replace the existing Shatabdis.[28] As of 2023, ICF is developing long-distance version of the trainset with sleeper cars.[28]
The country has set a target of having 4,500 Vande Bharat trains by 2047.[29]
Rolling stock

Vande Bharat Express uses self-propelled EMU trainsets manufactured by Integral Coach Factory in Chennai.[30] The trainsets have sixteen or eight chair cars.[31] A standard sixteen car rake consists of two Driving Trailer Coaches, one each on every end along with two non-driver trailer coaches, four trailer coaches with pantographs and eight motor coaches.[32] A second generation sixteen car trainset weighs 392 tonnes and costs ₹115 crore (US$14 million).[33][34] The chassis of a coach is 23 m (75 ft) long, and is made of stainless steel.[35]
During its trial runs, the trainsets had clocked speeds of up to 183 km/h (114 mph) with an acceleration of 0–100 km/h (0–62 mph) in 52 seconds.[36][19] The operational speed is limited due to track restrictions, halts and traffic congestion. The maximum operational speed of 160 km/h (99 mph) is achieved by the Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express and Hazrat Nizamuddin-Khajuraho Vande Bharat Express on the 174 km (108 mi) Tughlakabad–Agra section.[37]
Facilities
The train has two classes of accommodation with the AC Executive Class being the premium class and the AC chair being the other. The executive class coach can seat 52 passengers and is equipped with rotating seats in a 2x2 configuration.[38] The chair car coaches can seat 78 passengers per coach (44 in first and last coaches) and are equipped with retractable seats in 2x3 configuration.[39] The coaches are fully air conditioned and equipped with electric outlets, reading lights, CCTV cameras, automatic doors, bio-vacuum toilets, Sensor-based water taps and Passenger information system.[40] The coaches have wider windows with roller blinds and overhead racks for luggage.[41] The service offers onboard catering with both vegetarian and non-vegetarian meal options included in the fare as standard.[42]
Services
As of 25 April 2024, 51 Vande Bharat trains are in service, which includes seventeen 16-car services and thirty-four 8-car services.
S.No. | Service | Train number | Zone | Halts | Cars | Frequency | Distance | Travel time | Speed | Inaugural run | Ref | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Maximum[lower-alpha 1] | Average | |||||||||||
1 | New Delhi–Varanasi | 22436/22435 | NR | 2 | 16 | Except Thu | 757 km (470 mi) | 08h 00m | 130 km/h (81 mph) | 95 km/h (59 mph) | 15 February 2019 | [43] |
2 | New Delhi–SMVD Katra | 22439/22440 | NR | 4 | 16 | Except Tue | 655 km (407 mi) | 08h 05m | 130 km/h (81 mph) | 81 km/h (50 mph) | 3 October 2019 | [44] |
3 | Mumbai Central–Gandhinagar Capital | 20901/20902 | WR | 5 | 16 | Except Wed | 520 km (320 mi) | 06h 25m | 130 km/h (81 mph) | 81 km/h (50 mph) | 30 September 2022 | [45][46] |
4 | New Delhi–Amb Andaura | 22447/22448 | NR | 4 | 16 | Except Tue | 437 km (272 mi) | 05h 15m | 130 km/h (81 mph) | 83 km/h (52 mph) | 13 October 2022 | [47] |
5 | MGR Chennai Central–Mysuru | 20607/20608 | SR | 2 | 16 | Except Wed | 496 km (308 mi) | 06h 30m | 130 km/h (81 mph) | 76 km/h (47 mph) | 11 November 2022 | [48] |
6 | Bilaspur–Nagpur | 20825/20826 | SECR | 5 | 8 | Except Sat | 412 km (256 mi) | 05h 30m | 130 km/h (81 mph) | 75 km/h (47 mph) | 11 December 2022 | [49][50] |
7 | Howrah–New Jalpaiguri | 22301/22302 | ER | 3 | 16 | Except Wed | 561 km (349 mi) | 07h 30m | 130 km/h (81 mph) | 75 km/h (47 mph) | 30 December 2022 | [51] |
8 | Visakhapatnam–Secunderabad | 20833/20834 | ECoR | 5 | 16 | Except Sun | 698 km (434 mi) | 08h 30m | 130 km/h (81 mph) | 82 km/h (51 mph) | 15 January 2023 | [52] |
9 | Mumbai CSMT–Solapur | 22225/22226 | CR | 5 | 16 | Except Wed (22225)
Except Thu (22226) |
454 km (282 mi) | 06h 35m | 130 km/h (81 mph) | 69 km/h (43 mph) | 10 February 2023 | [53][54] |
10 | Mumbai CSMT–Sainagar Shirdi | 22223/22224 | CR | 4 | 16 | Except Tue | 340 km (210 mi) | 05h 10m | 130 km/h (81 mph) | 66 km/h (41 mph) | [55][56] | |
11 | Rani Kamalapati (Habibganj)–Hazrat Nizamuddin | 20171/20172 | WCR | 3 | 16 | Except Sat | 700 km (430 mi) | 07h 36m | 160 km/h (99 mph) | 92 km/h (57 mph) | 1 April 2023 | [57][58] |
12 | Secunderabad–Tirupati | 20701/20702 | SCR | 5 | 16 | Except Tue | 661 km (411 mi) | 08h 20m | 130 km/h (81 mph) | 79 km/h (49 mph) | 8 April 2023 | [59][60] |
13 | MGR Chennai Central–Coimbatore | 20643/20644 | SR | 3 | 8 | Except Wed | 497 km (309 mi) | 06h 00m | 130 km/h (81 mph) | 83 km/h (52 mph) | [61] | |
14 | Ajmer–Chandigarh | 20977/20978 | NWR | 7 | 16 | Except Wed | 700 km (430 mi) | 08h 25m | 130 km/h (81 mph) | 83 km/h (52 mph) | 12 April 2023 | [62][63] |
15 | Kasaragod–Thiruvananthapuram | 20633/20634 | SR | 8 | 16 | Except Thu | 589 km (366 mi) | 08h 10m | 110 km/h (68 mph) | 72 km/h (45 mph) | 25 April 2023 | [64][65] |
16 | Howrah–Puri | 22895/22896 | SER | 7 | 16 | Except Thu | 500 km (310 mi) | 06h 25m | 130 km/h (81 mph) | 78 km/h (48 mph) | 18 May 2023 | [66][67] |
17 | Dehradun–Anand Vihar Terminal | 22458/22457 | NR | 6 | 8 | Except Wed | 302 km (188 mi) | 04h 45m | 110 km/h (68 mph) | 64 km/h (40 mph) | 25 May 2023 | [68][69] |
18 | New Jalpaiguri–Guwahati | 22227/22228 | NFR | 5 | 8 | Except Tue | 407 km (253 mi) | 05h 30m | 110 km/h (68 mph) | 74 km/h (46 mph) | 29 May 2023 | [70][71] |
19 | Mumbai CSMT–Madgaon | 22229/22230 | CR | 7 | 8 | Except Fri | 580 km (360 mi) | 07h 45m | 120 km/h (75 mph) | 75 km/h (47 mph) | 27 June 2023 | [72][73] |
20 | Patna–Ranchi | 22349/22350 | ECR | 6 | 8 | Except Tue | 379 km (235 mi) | 06h 00m | 130 km/h (81 mph) | 63 km/h (39 mph) | [74] | |
21 | KSR Bengaluru–Dharwad | 20661/20662 | SWR | 3 | 8 | Except Tue | 490 km (300 mi) | 06h 25m | 110 km/h (68 mph) | 76 km/h (47 mph) | [75][76] | |
22 | Rani Kamalapati (Habibganj)–Rewa | 20173/20174 | WCR | 8 | 8 | Except Tue | 568 km (353 mi) | 08h 00m | 110 km/h (68 mph) | 71 km/h (44 mph) | [77] | |
23 | Indore–Nagpur | 20911/20912 | WR | 4 | 8 | Except Sun | 635 km (395 mi) | 08h 20m | 110 km/h (68 mph) | 76 km/h (47 mph) | [78] | |
24 | Jodhpur–Sabarmati (Ahmedabad) | 12461/12462 | NWR | 5 | 8 | Except Tue | 449 km (279 mi) | 06h 00m | 130 km/h (81 mph) | 75 km/h (47 mph) | 7 July 2023 | [79][80] |
25 | Gorakhpur–Prayagraj (Allahabad) | 22549/22550 | NER | 4 | 8 | Except Sat | 500 km (310 mi) | 07h 30m | 110 km/h (68 mph) | 67 km/h (42 mph) | [81][82] | |
26 | Udaipur City–Jaipur | 20979/20980 | NWR | 7 | 8 | Except Tue | 435 km (270 mi) | 06h 20m | 130 km/h (81 mph) | 69 km/h (43 mph) | 24 September 2023 | [83][84] |
27 | MGR Chennai Central–Vijayawada | 20677/20678 | SR | 4 | 8 | Except Tue | 514 km (319 mi) | 06h 40m | 130 km/h (81 mph) | 77 km/h (48 mph) | [85] | |
28 | Chennai Egmore–Tirunelveli | 20665/20666 | SR | 6 | 8 | Except Tue | 650 km (400 mi) | 07h 50m | 110 km/h (68 mph) | 83 km/h (52 mph) | [86][87] | |
29 | Kacheguda–Yesvantpur | 20703/20704 | SCR | 4 | 8 | Except Wed | 612 km (380 mi) | 08h 15m | 110 km/h (68 mph) | 74 km/h (46 mph) | [88] | |
30 | Patna–Howrah | 22348/22347 | ECR | 7 | 8 | Except Wed | 532 km (331 mi) | 06h 35m | 130 km/h (81 mph) | 81 km/h (50 mph) | [89] | |
31 | Ranchi–Howrah | 20898/20897 | SER | 6 | 8 | Except Tue | 458 km (285 mi) | 07h 10m | 130 km/h (81 mph) | 64 km/h (40 mph) | [90][91] | |
32 | Puri–Rourkela | 20836/20835 | ECoR | 9 | 8 | Except Sat | 504 km (313 mi) | 07h 45m | 130 km/h (81 mph) | 65 km/h (40 mph) | [92] | |
33 | Mangaluru Central–Thiruvananthapuram | 20631/20632 | SR | 9 | 8 | Daily | 621 km (386 mi) | 08h 40m | 110 km/h (68 mph) | 72 km/h (45 mph) | [93][94] | |
34 | Ahmedabad–Okha | 22925/22926 | WR | 8 | 8 | Except Wed (22926)
Except Tue (22925) |
499 km (310 mi) | 06h 30m | 110 km/h (68 mph) | 77 km/h (48 mph) | [95] | |
35 | Varanasi–New Delhi | 22415/22416 | NR | 2 | 16 | Except Tue | 757 km (470 mi) | 08h 05m | 130 km/h (81 mph) | 94 km/h (58 mph) | 18 December 2023 | [96][97] |
36 | Anand Vihar Terminal–Ayodhya Cantonment | 22426/22425 | NR | 2 | 8 | Except Wed | 628 km (390 mi) | 08h 20m | 130 km/h (81 mph) | 75 km/h (47 mph) | 30 December 2023 | [98][99] |
37 | SMVD Katra–New Delhi | 22478/22477 | NR | 5 | 16 | Except Wed | 655 km (407 mi) | 08h 10m | 130 km/h (81 mph) | 80 km/h (50 mph) | [100] | |
38 | Amritsar–Delhi Junction | 22488/22487 | NR | 5 | 8 | Except Fri | 447 km (278 mi) | 05h 30m | 130 km/h (81 mph) | 81 km/h (50 mph) | [101] | |
39 | Coimbatore–Bengaluru Cantonment | 20642/20641 | SR | 5 | 8 | Except Thu | 374 km (232 mi) | 06h 25m | 110 km/h (68 mph) | 58 km/h (36 mph) | [102] | |
40 | Mangaluru Central–Madgaon | 20646/20645 | SR | 2 | 8 | Except Thu | 317 km (197 mi) | 04h 45m | 120 km/h (75 mph) | 67 km/h (42 mph) | [103] | |
41 | Jalna–Mumbai CSMT | 20705/20706 | SCR | 6 | 8 | Except Wed | 435 km (270 mi) | 06h 50m | 110 km/h (68 mph) | 64 km/h (40 mph) | [104] | |
42 | Kalaburagi (Gulbarga)–SMVT Bengaluru | 22231/22232 | CR | 5 | 8 | Except Thu (22232)
Except Fri (22231) |
547 km (340 mi) | 08h 45m | 130 km/h (81 mph) | 63 km/h (39 mph) | 12 March 2024[105][106] | |
43 | New Jalpaiguri–Patna | 22233/22234 | NFR | 6 | 8 | Except Tue | 471 km (293 mi) | 06h 55m | 130 km/h (81 mph) | 67 km/h (42 mph) | [107] | |
44 | Lucknow–Dehradun | 22545/22546 | NER | 3 | 8 | Except Mon | 545 km (339 mi) | 08h 20m | 110 km/h (68 mph) | 65 km/h (40 mph) | [108] | |
45 | Ahmedabad–Mumbai Central | 22962/22961 | WR | 4 | 16 | Except Sun | 490 km (300 mi) | 05h 25m | 130 km/h (81 mph) | 90 km/h (56 mph) | ||
46 | Mysuru Junction–MGR Chennai Central | 20663/20664 | SWR | 4 | 8 | Except Wed | 497 km (309 mi) | 06h 25m | 130 km/h (81 mph) | 77 km/h (48 mph) | ||
47 | Hazrat Nizamuddin–Khajuraho | 22470/22469 | NR | 6 | 8 | Except Mon | 659 km (409 mi) | 08h 20m | 160 km/h (99 mph) | 79 km/h (49 mph) | [109] | |
48 | Secunderabad–Visakhapatnam | 20707/20708 | SCR | 5 | 8 | Except Thu | 698 km (434 mi) | 08h 45m | 130 km/h (81 mph) | 80 km/h (50 mph) | ||
49 | Ranchi–Varanasi | 20887/20888 | SER | 6 | 8 | Except Fri | 536 km (333 mi) | 07h 50m | 110 km/h (68 mph) | 68 km/h (42 mph) | [110] | |
50 | Bhubaneswar–Visakhapatnam | 20841/20842 | ECoR | 7 | 8 | Except Mon | 444 km (276 mi) | 05h 45m | 130 km/h (81 mph) | 75 km/h (47 mph) | [111] | |
51 | Patna–Gomti Nagar (Lucknow) | 22345/22346 | ECR | 5 | 8 | Except Fri | 545 km (339 mi) | 08h 25m | 130 km/h (81 mph) | 65 km/h (40 mph) | [108] |
See also
- List of megaprojects in India
- Vande Bharat (sleeper trainset)
- Vande Metro
- High-speed rail in India
- Amrit Bharat Express
- RapidX
Notes
- Maximum permissible speed over different sections as approved by the Commissioner of Railway Safety
References
- "Vande Bharat Express averages 83 kmph, falls short of its top speed of 130 kmph". Mint. 18 April 2023. Retrieved 7 March 2024.
- "Built to hit 180 kmph, WHY do Vande Bharat Express trains run at 83 kmph average speed? RTI reply reveals". Financial Express. 19 April 2023. Retrieved 7 March 2024.
- "Railways golden girl: 50 years of the Rajdhani story". Hindustan Times. 9 March 2019. Retrieved 1 December 2023.
- Railway Budget of 1969–70 (PDF) (Report). Indian Railways. Retrieved 1 December 2023.
- "Kolkata loses last connect to first Rajdhani". The Times of India. 22 May 2016. Retrieved 1 December 2023.
- "WAP-1 locomotive" (PDF) (Press release). Government of India. 9 October 1989. Retrieved 1 December 2023.
- "'Shatabdi is the heart of Indian railways'". The Times of India. 30 May 2014. Retrieved 1 December 2023.
- "Trains faster than Rajdhani, Shatabdi on the cards". The Economic Times. 23 January 2018. Retrieved 5 November 2022.
- "Indian Railways Passenger Coaches: Safety Features and Technologies Adopted" (PDF). International Journal of Engineering Technology Science and Research. April 2017. Archived (PDF) from the original on 28 February 2018. Retrieved 27 February 2018.
- Debroy, Bibek (9 February 2018). "A 70-Year-Old Vs a 30-Year-Old: LHB Coaches Perform Better than ICF Ones". Business Standard. Retrieved 6 June 2023.
- Indian Railways: Vision 2020 (PDF) (Report). Indian Railways. 18 December 2009. Retrieved 29 November 2014.
- "India getting ready for bullet trains". Central Chronicle. 18 December 2009. Archived from the original on 17 July 2011. Retrieved 1 December 2023.
- "Rail Budget 2014: High-speed trains proposed to connect major cities". The Economic Times. 8 July 2014. ISSN 0013-0389. Retrieved 19 May 2023.
- "200 km in 90 mins: Delhi-Agra high speed train sets new speed record". The Economic Times. 3 July 2014. Retrieved 10 July 2014.
- "Indian Railways to invite bids for manufacturing modern coaches". The Statesman. 2 May 2017. Retrieved 19 May 2023.
- Dhoot, Vikas (24 July 2015). "Train from Spain: Government considering Talgo proposal to run trial runs of faster trains between Mumbai, Delhi". The Economic Times. New Delhi. Retrieved 24 July 2015.
- Rakesh Ranjan (2 January 2018). "Talgo high-speed trains stop in their tracks after government waves red flag". India Today. Retrieved 22 August 2021.
- "RDSO design light aluminum coaches of Train-18 which can cruise at 200 KMPH". The Times of India. 23 June 2022.
- "Vande Bharat clocks 183 km but glass filled to the brim with water stays stable". The Economic Times. 6 September 2022. Retrieved 31 October 2023.
- "Train 18 named Vande Bharat Express: Piyush Goyal". The Economic Times. 27 January 2019. ISSN 0013-0389. Retrieved 20 May 2023.
- "Vande Bharat Express flagged off: How to book, fares and more". Hindustan Times. 15 February 2019. Retrieved 20 May 2023.
- "Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi". Business Today. 7 February 2019. Retrieved 17 February 2019.
- "Train 18, India's first engine-less train, set to hit tracks on October 29". The Indian Express. 24 October 2018. Retrieved 1 December 2023.
- "Vande Bharat Express: Reach Katra in 8 hours from Delhi - Amit Shah flags off Vande Bharat Express". The Economic Times. 3 October 2019. Retrieved 20 May 2023.
- "Fresh Tender System For Vande Bharat Express After 'Favouritism Charges'". NDTV. Press Trust of India. 16 July 2019. Retrieved 30 June 2023.
- "40 new Vande Bharat Express trains by 2022". Hindustan Times. 4 September 2019. Retrieved 20 May 2023.
- "Vande Bharat Express 2.0: PM flags off a new train between Gandhinagar and Mumbai, here's all to know". Business Today. 30 September 2022. Retrieved 5 December 2022.
- "'Vande Bharat may soon replace Rajdhani and Shatabdi' — In conversation with BG Mallya, GM at ICF, Chennai". Financial Express. 9 March 2023. Retrieved 1 December 2023.
- "Indian Railways to introduce Vande Bharat Express trains on THESE routes". mint. 16 December 2023. Retrieved 5 March 2024.
- RDSO Specification (PDF) (Report). RDSO. Retrieved 21 March 2023.
- "Indian Railways enters new league! Swanky 160 kmph engine-less Make in India train is too good; 15 features". The Financial Express. 27 March 2018. Retrieved 20 May 2023.
- VBE Maintenance Manual Volume II (PDF) (Report). Indian Railways. Retrieved 1 December 2023.
- "New, upgraded Vande Bharat trains to cost about Rs 115 crore: Officials". The Financial Express. 28 May 2022. Retrieved 20 May 2023.
- "Vande Bharat train gets safety nod, likely to be flagged off on September 30". Hindustan Times. 10 September 2022. Retrieved 5 December 2022.
- Gupta, Moushumi Das (23 October 2022). "Hi-tech machines, 9,000+ workforce — inside Integral Coach Factory making Vande Bharat trains". The Print. Retrieved 24 October 2022.
- "Vande Bharat Express: A Make in India Success Story" (PDF) (Press release). 16 January 2023. Retrieved 13 November 2023.
- "Vande Bharat Express trains running at average speed of 83 kph against permissible limit of 130 kph, reveals RTI reply filed in MP". Free Press Journal. 17 April 2023. Retrieved 1 December 2023.
- "Passengers from south T.N. to get a new travel experience on Vande Bharat Expres". The Hindu. 23 September 2023. Retrieved 1 December 2023.
- "New Vande Bharat Express features". The Times of India. 9 August 2022. Retrieved 1 December 2023.
- "Indian Railways to roll out 'Make in India' 160 kmph self-propelled 'world-class' train sets at half the cost of import!". The Financial Express. 20 February 2017. Retrieved 20 May 2023.
- "Salient Features of Vande Bharat Express Trains" (Press release). Government of India. 2 August 2023. Retrieved 24 November 2023.
- "Mumbai-Goa Vande Bharat express flagged off". The Times of India. 27 June 2023. Retrieved 1 December 2023.
- "New Delhi–Varanasi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "New Delhi–Shri Mata Vaishno Devi Katra Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "PM to flag off Vande Bharat 2 from Gandhinagar to Mumbai on Sept 30". The Indian Express. 13 September 2022. Retrieved 13 September 2022.
- "Mumbai Central–Gandhinagar Capital Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "New Delhi–Amb Andaura Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "MGR Chennai Central–Mysuru Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Bilaspur–Nagpur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "6th Vande Bharat train to be inaugurated on December 11". Hindustan Times. 4 December 2022. Retrieved 5 December 2022.
- "Howrah–New Jalpaiguri Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Visakhapatnam–Secunderabad Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Mumbai CSMT–Solapur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "CR strengthening tracks to increase speed of Vande Bharat trains". The Indian Express. 17 February 2023. Retrieved 2 April 2023.
- "Mumbai CSMT–Sainagar Shirdi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "CSMT-Shirdi Vande Bharat Express Train Speed Set to Increase to 130 KMPH, to Reduce Travel Time by 30 Mins". India.com. Retrieved 1 December 2023.
- "Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- Chauhan, Arvind (21 March 2023). "From April 1, Vande Bharat Express to connect Bhopal with Delhi via Agra". The Times of India. Retrieved 1 December 2023.
- "Secunderabad–Tirupati Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Secunderabad-Tirupati Vande Bharat Express to get faster, have additional coaches. Check revised timings". The Economic Times. 16 May 2023. Retrieved 23 May 2023.
- "MGR Chennai Central–Coimbatore Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Ajmer–Delhi Cantonment Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Jaipur-Delhi Vande Bharat to take 1.45 hours at 150 kmph, schedule, launch month revealed". Daily News and Analysis. 25 March 2023. Retrieved 18 April 2023.
- "PM Flags Off Kerala's First Vande Bharat Express". NDTV. 25 April 2023. Retrieved 1 December 2023.
- "Kasaragod–Thiruvananthapuram Vande Bharat Express (via Kottayam)". Indiarailinfo. Retrieved 1 December 2023.
- "Howrah-Puri Vande Bharat Express: Check route, fare, timing, speed and how to book ticket". Zee Business. 11 May 2023. Retrieved 1 December 2023.
- "Howrah–Puri Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Dehradun–Anand Vihar Terminal Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "PM Modi flags off Delhi-Dehradun Vande Bharat Express. Check timings, ticket price". India Today. 25 May 2023. Retrieved 25 May 2023.
- "New Jalpaiguri–Guwahati Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- Das, Dipaneeta (26 May 2023). "PM Modi to flag off Northeast's first Vande Bharat Express on May 29". India Today. Retrieved 30 June 2023.
- "Mumbai CSMT–Madgaon Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Mumbai-Goa Vande Bharat Express speed likely to be restricted". mid-day.com. 1 June 2023.
- "Patna–Ranchi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "KSR Bengaluru–Dharwad Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Bengaluru-Dharwad Vande Bharat Timings to Change Starting October 7". Times Now. 7 October 2023. Retrieved 1 December 2023.
- "Rewa-Rani Kamalapati (Habibganj) Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Indore-Nagpur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Jodhpur-Sabarmati Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Vande Bharat Express: Lucknow to Gorakhpur via Ayodhya in Under 4 Hours, Check Details". News18. 5 July 2023. Retrieved 1 December 2023.
- "Gorakhpur-Lucknow Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Trial Run for Gorakhpur-Lucknow Vande Bharat Begins, Likely to Connect Ayodhya". News18. 1 July 2023. Retrieved 2 July 2023.
- "Udaipur-Jaipur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- Jain, Smriti (24 September 2023). "PM Modi flags off 9 new Vande Bharat Express trains for 11 states; check routes, timetable, stoppages full details". The Times of India. Retrieved 1 December 2023.
- "MGR Chennai Central–Vijayawada Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Chennai Egmore–Tirunelveli Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Chennai-Tirunelveli Vande Bharat Express likely to be inaugurated by PM Modi on August 6". News9. 31 July 2023. Retrieved 31 July 2023.
- "Kacheguda-Yesvanthpur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Patna-Howrah Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Ranchi-Howrah Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- Singh, Sachin (20 September 2023). "Ranchi News: Vande Bharat Express to Howrah All Set to Roll Out on September 24 - Route and Schedule Inside!". DNP INDIA. Retrieved 20 September 2023.
- "Puri-Rourkela Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Kasaragod–Thiruvananthapuram Vande Bharat Express (via Alappuzha)". Indiarailinfo. Retrieved 1 December 2023.
- "PM launches Vande Bharat train service between Mangaluru and Thiruvananthapuram". thehindu.com. Retrieved 12 March 2024.
- "Ahmedabad–Jamnagar Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Varanasi–New Delhi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- Athrady, Ajith (18 December 2023). "PM Modi flags off second Vande Bharat train between Varanasi and Delhi". Deccan Herald. Retrieved 31 December 2023.
- "Ayodhya Dham–Anand Vihar Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "PM Modi flags off 2 new Amrit Bharat, 6 Vande Bharat Express trains during Ayodhya visit; check routes & other details". The Times of India. 30 December 2023. ISSN 0971-8257. Retrieved 31 December 2023.
- "SMVD Katra–New Delhi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Amritsar–Delhi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Coimbatore–Bangalore Cantonment Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Mangaluru–Madgoan Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "Jalna–Mumbai CSMT Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
- "PM Modi flags off 10 new Vande Bharat Express trains today, four existing routes extended – Check full routes, new destinations and more". Financialexpress. 12 March 2024. Retrieved 12 March 2024.
- Mukhopadhyay, Sounak (12 March 2024). "Watch: PM Modi flags off 10 new Vande Bharat trains". mint. Retrieved 12 March 2024.
- "Vande Bharat Express: पटना से न्यू जलपाईगुड़ी तक दौड़ेगी हाई स्पीड ट्रेन, इन स्टेशनों से होकर गुजरेगी; ट्रायल रन पूरा - Vande Bharat Train will run from Patna to New Jalpaiguri will pass through these routes trial run completed". Jagran (in Hindi). Retrieved 10 March 2024.
- "यूपी: चारबाग़ की जगह गोमतीनगर से चलेगी वन्दे भारत एक्सप्रेस, दिनों में भी हुआ बदलाव, जानिए पूरा शेड्यूल". Amar Ujala (in Hindi). Retrieved 10 March 2024.
- Joshi, Prerna. "4 घंटे में निजामुद्दीन से खजुराहो पहुंचाएगी Vande Bharat, हरी झंडी दिखाएंगे प्रधानमंत्री नरेंद्र मोदी". News24 Hindi (in Hindi). Retrieved 10 March 2024.
- "Ranchi Varanasi Vande Bharat Express: लगभग 8 घंटे में बनारस पहुंच जाएगी वंदे भारत, इस स्टेशन पर भी होगा स्टॉपेज; ये है डिटेल - Ranchi Varanasi Vande Bharat Express Run via Bokaro Know All Details Here". Jagran (in Hindi). Retrieved 10 March 2024.
- "Two Vande Bharat trains to Puri and Secunderabad from March 12". The Times of India. 9 March 2024. ISSN 0971-8257. Retrieved 10 March 2024.
External links
Media related to Vande Bharat Express trains at Wikimedia Commons