K Line (Los Angeles Metro)
The K Line is a light rail line running north-south between the Jefferson Park and Westchester neighborhoods of Los Angeles, California, passing through various South Los Angeles neighborhoods and the city of Inglewood. It is one of seven lines in the Los Angeles Metro Rail system operated by the Los Angeles County Metropolitan Transportation Authority (LACMTA). It was opened on October 7, 2022, making it the system's newest line.[1]
K Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() K Line train approaching Hyde Park station, November 2022 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | Crenshaw/LAX Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Partially open | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Los Angeles County Metropolitan Transportation Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | 807 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 7 (1 under construction, 1 delayed opening) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | kline | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Light rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Los Angeles Metro Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Division 16 (Westchester) Division 22 (Hawthorne) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Kinki Sharyo P3010 operating in 1 or 2 car consists | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | October 7, 2022[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | At-grade in exclusive right-of-way, with underground and aerial sections | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead line, 750 V DC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 65 mph (105 km/h) (max) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The current K Line represents the initial operating segment of the Crenshaw/LAX Line project, which began construction in 2014. A segment connecting to the C Line via a wye is expected to open in 2024; the C and K Lines will be integrated and services realigned at that time, although the service pattern has yet to be determined. A connection to the new LAX Automated People Mover is planned for late 2024.[2]
Service description

Route
The Metro K Line's northern terminus is at Expo/Crenshaw station, a transfer point to the E Line. The K Line station here is underground and does not provide a track connection to the at-grade E Line. Provisions are in place to allow the line to extend north. The route follows Crenshaw Boulevard from Exposition Boulevard south to 67th Street. It travels underground in a one-mile (1.6 km) deep bore tunnel, which transitions into an at-grade segment in the median of Crenshaw Blvd (between 48th and 59th Streets) where trains run synchronized to existing traffic signals. From 59th and 67th Streets, the line returns underground into a shallow cut and cover tunnel for a half-mile (0.8 km).
South of there, the route emerges from the tunnel and enters the Harbor Subdivision right-of-way, which runs parallel to Florence Avenue and Aviation Boulevard. The line mostly operates at-grade in this exclusive right-of-way, briefly transitioning onto elevated viaducts to cross over major thoroughfares including La Brea Avenue and Interstate 405. Traveling the complete length of the line takes approximately 18 minutes.[3]
The current southern terminus of the line is Westchester/Veterans station. The extension under construction continues along an exclusive right-of-way, crossing over Manchester Boulevard, Century Boulevard and Imperial Highway. At Century Boulevard, Aviation/Century Station will sit on a viaduct. The line will then briefly enter an open trench as it passes close to the LAX runways[4] before connecting at a wye to the existing C Line just to the west of Aviation/LAX station. Until this extension opens, Metro is operating a bus shuttle called the "C & K Line Link" from Westchester/Veterans to Aviation/LAX.
Hours and frequency
K Line service hours are approximately from 4:30 a.m. until 12:00 a.m. daily. Trains operate every ten minutes during peak hours Monday through Friday, and every 12 minutes during the daytime on weekdays and all day on the weekends. Night service is every 20 minutes.[5]
Station listing
The project includes nine new stations:[6]
Station | Opened/opening[2] | City (Neighborhood) | Major connections and notes |
---|---|---|---|
Expo/Crenshaw | October 7, 2022[1] | Los Angeles (Jefferson Park) | ![]() Park and ride: 450 spaces (closed Sunday) |
Martin Luther King Jr. | Los Angeles (Baldwin Hills/Leimert Park) | ||
Leimert Park | Los Angeles (Leimert Park) | ||
Hyde Park | Los Angeles (Hyde Park) | ||
Fairview Heights | Inglewood | Park and ride: 200 spaces | |
Downtown Inglewood | SoFi Stadium via shuttle bus![]() | ||
Westchester/Veterans | ![]() | ||
LAX/Metro Transit Center | Late 2024 | Los Angeles (Westchester) | ![]() |
Aviation/Century | 2024 |
History

Los Angeles Railway Line 5 yellow streetcars served Crenshaw and Florence Boulevards until 1955 when the service was replaced with buses.[7]
Extending the Green Line to LAX was an early goal of Los Angeles transit planners. Studies in 1984 and 1988 outlined a route from the junction near Aviation/Century and running to the northeast, similar to later plans for the second section of the Sepulveda Transit Corridor.[8]
A north-south line along Crenshaw was planned following the Los Angeles riots of 1992 as a way to better serve transit-dependent residents in the corridor while at the same time providing stimulus for positive economic growth in the South Los Angeles region.[7] It was championed by State Senator Diane Watson and County Supervisor Yvonne Brathwaite Burke, both representing portions of the corridor.
A Major Investment Study was initiated in 1993,[9] and after more than a decade of study, a Final Environmental Impact Report was completed in May 2011.[10] The FTA gave its approval to build the line in 2012,[11] and heavy construction began in June 2014, funded by Measure R.[12] Los Angeles County Supervisor Mark Ridley-Thomas was a key advocate for tunnelling and other grade separation along the line. [13][14][15]
The route was designated as the K Line in November 2019.[16] Originally scheduled to open in 2019, the project saw repeated delays. In April 2020, Metro announced that the completion date for the project would be pushed to no earlier than May 2021 due to construction issues. The support structures for bridges and tunnels had concrete plinths that were incorrectly installed, requiring extensive repairs to sections where tracks had already been installed.[17] The northern portion of the line ultimately opened on October 7, 2022.[1]
Future developments
LAX/Metro Transit Center
The line was from its inception intended to offer a connection to LAX via an Automated People Mover (APM). However, at the time the line was designed, it was unclear where exactly that connection would take place. While initial expections were that the connection would be at Aviation/Century station, ultimately the route chosen for the LAX Automated People Mover intersected with the new line at 96th Street, about half a mile to the north, requiring the design of an infill station while the overall line was still under construction.
In 2014, Metro approved the planning and scoping of this station, which was called Aviation/96th in planning documents but was ultimately designated LAX/Metro Transit Center station.[18][19] This station is intended to serve as Metro Rail's main gateway to the airport itself, while the Aviation/Century station will serve destinations along the busy Century Boulevard corridor.
While initial plans called for the full length of the project to be opened for service while the LAX/Metro Transit Center was under development, delays in the opening of the main line meant that major construction on the station was already underway by the time the line was ready. As a result, the line opened on October 7, 2022 only from Expo/Crenshaw to Westechester/Veterans.[1] The full length of the line, including Aviation/Century and the connection to the C Line, is now planned to open in 2023, while LAX/Metro Transit Center itself will open in 2024.[2]
Future service patterns



Varying service patterns have been proposed for integrating the completed Crenshaw/LAX Line into the rest of the system over the course of its planning and construction, all of which have involved sharing trackage and infrastructure facilities with the existing C Line. Although some early proposals would've sent trains through all three directions of the wye that will connect the existing C Line with the new segment, this was rejected by Metro because it would cause too much wear and tear on the track switch mechanisms.[20][21]
The debate over service patterns proved somewhat contentious, as the final pattern must balance the needs of riders, operational needs, and the political constituencies of Metro's board members.[22] In 2018, with the line then scheduled to open within the year, the Metro Board of Directors overrode a recommendation by operations staff that would've had a single line operating between Expo/Crenshaw and Norwalk station. Passengers from the Redondo Beach area would have been served by a shuttle to the LAX area, where they would need to transfer to another train to continue east or north. Instead, board members approved a one-year pilot of a configuration that would combine an Expo-to-Norwalk line with another line that would connect Redondo Beach with Willowbrook/Rosa Parks station, allowing transfers to the A and J Lines.[23][24] The approved plan would incur higher operating expenses but board members argued it would retain better transfer opportunities for South Bay residents.[25]
Ongoing construction delays led to a reassessment of that plan in 2022. Metro recommended public outreach aimed at reformulating the operating plan before the connection to the C Line opens in 2023;[2] in March of 2023, Metro indicated that it would recommend Option 2 in the figure above, in which the K Line would run north-south from Expo/Crenshaw to Redondo Beach, and the C Line would run from Norwalk to LAX.[26]
Centinela Avenue grade separation
Metro has plans to convert the current at-grade crossing at Centinela Avenue to an above-grade crossing, which the agency estimates could be finished by 2026 or 2027.[27]
Northern extension to Hollywood

The original plans for the Crenshaw Corridor project connected Wilshire Blvd to LAX. However, once LRT was selected as the preferred mode, the cost for the entire route exceeded the project budget, so part of the corridor north of Exposition Boulevard was deferred until funds became available.
The final design for the Crenshaw/LAX project included a tunneled station at Crenshaw/Expo to accommodate a potential northward extension, which increased the cost of the original project by $236 million.[28]
With the passage of Measure M and the enthusiastic support of the City of West Hollywood, the K Line Extension, which would travel north from the current Expo/Crenshaw terminus, connecting along the way to the B and D Lines, is currently under development. Three options are being studied, all ending at the potential Hollywood Bowl Station. The San Vicente Alternative, known as the hybrid, follows Crenshaw and San Vicente, turning north on Fairfax to serve Farmers Market (Los Angeles) and CBS Television City before turning on Beverly to connect back to San Vicente near Cedar-Sinai towards West Hollywood at Pacific Design Center. Finally serving new stations on Santa Monica Blvd, the route curves north again towards Hollywood. The other two options follow a traditional North/South routing on either Fairfax or La Brea.
Incident
- On February 18, 2023, an eastbound train collided with a cement mixer at the Cedar Ave crossing between Downtown Inglewood and Westchester stations.[29]
See also
References
- Patel, Tine (October 7, 2022). "LA Metro's new K Line opens today". CBS. Archived from the original on October 7, 2022. Retrieved October 7, 2022.
- "Crenshaw/LAX Line Operating Plan Update" (PDF). Metro. April 21, 2022. Archived (PDF) from the original on May 12, 2022. Retrieved April 24, 2022.
- "K Line". Archived (PDF) from the original on November 6, 2022.
- Cho, Aileen (January 31, 2018). "Above, Below and Through: How They Build L.A.'s New Light Rail Line". Engineering News-Record. Archived from the original on October 3, 2022. Retrieved October 3, 2022.
- "Metro K Line schedule". September 23, 2022. Retrieved September 24, 2022.
- Hymon, Steve (July 23, 2015). "Actions taken today by Metro Board of Directors". The Source. Metro (LACMTA). Archived from the original on April 12, 2022. Retrieved July 27, 2015.
The Board adopted the official names for the stations along the Crenshaw/LAX Line that is currently under construction. The names, from north to south: Expo/Crenshaw, Martin Luther King, Jr., Leimert Park, Hyde Park, Fairview Heights, Downtown Inglewood, Westchester/Veterans and Aviation/Century.
- Barrett, Matthew (2014). "Los Angeles Transportation Transit History – South LA" (PDF). LACMTA. Archived (PDF) from the original on March 20, 2022. Retrieved January 28, 2021.
- COASTAL CORRIDOR RAIL TRANSIT PROJECT NORTH SEGMENT (PDF). Metro (Report). Bechtel. August 1988. Archived (PDF) from the original on October 24, 2020. Retrieved September 1, 2020.
- "Crenshaw/LAX Transit Corridor (project website)". Metro (LACMTA). June 27, 2013. Archived from the original on February 21, 2022. Retrieved September 11, 2013.
- "Planning & Programming Committee Crenshaw/LAX Transit Corridor Adopt the Locally Preferred Alternative Maintenance Facility Site" (PDF). Metro (LACMTA). April 20, 2011. Archived (PDF) from the original on April 7, 2012. Retrieved January 22, 2014.
- "FTA approves L.A. Metro light rail project". Metro Magazine. January 5, 2012. Archived from the original on February 4, 2014. Retrieved January 23, 2014.
- "Measure R". Metro (LACMTA). Archived from the original on August 26, 2010. Retrieved August 30, 2010.
- Ridley-Thomas, Mark (December 2009). "MTA Board Unanimously Adopts $1.7 Billion Crenshaw To LAX Transit Corridor Light Rail System Championed By Supervisor Ridley-Thomas". Archived from the original on May 27, 2010. Retrieved August 20, 2010.
- "Crenshaw/LAX Transit Corridor Project Park Mesa Heights Grade Separation Analysis" (PDF). Metro (LACMTA). September 16, 2010. Archived (PDF) from the original on March 25, 2012. Retrieved January 22, 2013.
- "Board votes to add Leimert Park Village station to Crenshaw/LAX Line — if the funds can be found". The Source. Metro (LACMTA). May 26, 2011. Archived from the original on March 25, 2012. Retrieved January 22, 2013.
- "Letter Line ID Project" (PDF). Metro (LACMTA). Archived (PDF) from the original on April 26, 2020. Retrieved July 23, 2020.
- Nelson, Laura J. (April 10, 2020). "Construction problems delay Metro's $2-billion Crenshaw Line opening until 2021". Los Angeles Times. Archived from the original on February 14, 2022. Retrieved April 10, 2020.
- Hymon, Steve (June 18, 2018). "Report explains operating plan for Crenshaw/LAX Line and Green Line". metro.net. Archived from the original on November 25, 2018. Retrieved December 6, 2018.
- Nelson, Laura J. (June 26, 2014). "Train station to connect Metro rail lines with LAX approved". Los Angeles Times. Archived from the original on May 16, 2015. Retrieved May 21, 2015.
- Sumers, Brian (January 21, 2014). "Metro breaks ground on new $2 billion L.A. Crenshaw/LAX Line". Daily Breeze. Archived from the original on February 4, 2016. Retrieved January 31, 2016.
- "City Council approves long-awaited people mover to LAX". Los Angeles Times. April 11, 2018. Archived from the original on April 12, 2018. Retrieved April 12, 2018.
- "Crenshaw/LAX Line Operations Plan Being Debated, Will Affect Green Line". streetsblog.org. June 22, 2018. Archived from the original on June 8, 2019. Retrieved December 6, 2018.
- Chiland, Elijah (July 3, 2018). "Will the Crenshaw Line strand South Bay riders?". Curbed LA. Archived from the original on May 21, 2020. Retrieved December 6, 2018.
- StreetsblogLA (December 6, 2018). "Metro bd mtg: Barger votes yes. Hahn Crenshaw/Green C3 motion passes 7-4-2 (Ridley-Thomas, Kuehl abstained)". twitter.com. Archived from the original on July 28, 2021. Retrieved December 6, 2018.
- "Crenshaw/LAX Line and Green Line Operating Plan Presentation – Sports Competitions – American Football". Scribd. Archived from the original on July 28, 2021. Retrieved December 6, 2018.
- "C & K Line Operating Plan Update" (PDF). Archived (PDF) from the original on March 6, 2023. Retrieved March 17, 2023.
- "Centinela Grade Separation Project". Metro. Archived from the original on November 2, 2022. Retrieved November 2, 2022.
- "Crenshaw/LAX Transit Corridor Project Final Environmental Impact Report/Final Environmental Impact Statement Executive Summary" (PDF). Metro (LACMTA). August 2011. p. ES-26. Archived (PDF) from the original on February 1, 2014. Retrieved January 21, 2014.
- "New footage shows Metro train smash into concrete truck stuck on tracks in Inglewood". ABC7 Los Angeles. KABC Television, LLC. Archived from the original on March 6, 2023. Retrieved March 6, 2023.
External links
