Line 6 (Mumbai Metro)

Pink Line 6 of the Mumbai Metro, or the Swami Samarth Nagar-Jogeshwari-Vikhroli-Kanjurmarg Line, is part of the metro system for the city of Mumbai, India. Major section of the line will run through the Jogeshwari–Vikhroli Link Road which is going to be fully elevated. It is being made through the MoU between DMRC and MMRDA.

Mumbai Metro Pink Line 6
Overview
StatusLine 6 (under construction)
OwnerMMRDA & DELHI METRO RAIL CORPORATION LTD
Line number6
LocaleWestern Suburbs, Mumbai
Termini
  • Lokhandwala
  • Kanjurmarg
Stations13
WebsiteLine 6
Service
TypeRapid Transit
SystemMumbai Metro
History
Commenced2017 (2017)
Planned opening2025 (2025)
Technical
Line length14.47 km (8.99 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Line 6
Kanjurmarg Depot
0.000
Vikhroli EEH
Central line Left arrow Kalyan and CSMT Right arrow
0.9736
Kanjurmarg (West)
Gandhi Nagar (Kanjurmarg) on Green Line 4
2.6316
IIT Powai
3.6960
Powai Lake
4.5453
Rambaug (Powai)
5.5576
Saki Vihar Road
Aarey Colony on Aqua Line 3
Aarey Colony Ramp
SEEPZ on Aqua Line 3
6.6939
SEEPZ Village
7.8168
Mahakali Caves
9.3646
Shyam Nagar
10.3265
Jogeshwari East on Red Line 7
Western line Left arrow Dahanu Road and Churchgate Right arrow
11.4863
Jogeshwari (West)
12.4754
Adarsh Nagar
Lower Oshiwara on Yellow Line 2
13.2042
Swami Samarth Nagar (Lokhandwala)

Plans

The 14.47 km (8.99 mi) long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg (Pink Line) is to have 13 stations and cost Rs. 6,672 crore. It is to be an elevated corridor.

It is to connect Swami Samarth Nagar-Lokhandwala in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, Jogeshwari-Vikhorli Link Road, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W) and Vikhroli - Eastern Express Highway. Pink Line is to provide interchange with Yellow Line at Adarsh Nagar, with Aqua Line at SEEPZ, with Green Line at Kanjurmarg (West), with Red Line at Jogeshwari Vikhroli Link Road and the Mumbai Suburban Railway at Jogeshwari on Western Railways and Kanjurmarg on Central Railway. Construction is to begin by December 2018.[1] [2] It is to be ready by 2021–22.[3]

Construction

The line was approved by Chief Minister Fadnavis on 19 October 2016. The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities were to determine the location of trees along the alignment with an accuracy of up to 10 cm (3.9 in), utilizing a differential GPS (DGPS), while a digital aerial triangulation system is to help determine the types of trees, their heights and diameters.[4]

Current status

Sr. No.Name of Work Description Status as of[5]
21 May 2019 July 2019 Sep 2019 Oct 2019 Nov 2019 Dec 2019 Jan 2020 07 Sep 2020 01 Nov 2020 01 Mar 2021 2 Aug 2021 21 March 2022 19 July 2022
1Soil Investigation Works soil investigation work for pier foundation completed 39.4% 45.1% 58% 70.66% 73.84% 80.79% 82.18% 83.26% 85.82% 94.18% 94.47% 94.67% 95.35%
2Utility Works Works completed 25.2% 30.0% 36.6% 49.53% 53.01% 56.17% 56.45% 56.70% 59.58% 65.14% 70.71% 80.18% 84.35%
3Piling Works piling work for foundations completed 7.8%% 9.9% 14.10% 18.32% 23.64% 30.25% 33.37% 45.55% 48.36% 59.01% 70.86% 84.01% 86.85%
4Pile Cap Works Pile Cap work completed 0.5% 0.9% 2.05% 4.16% 6.71% 11.63% 14.75% 28.28% 34.32% 48.62 59.13% 74.29% 81.84%
5Pier Works Pier work completed 0.52 2.14% 3.35% 5.67% 7.03% 19.79% 24.42% 37.12% 40.26% 71.49% 86.85%
6 Pier Cap Works Pier Caps Cast Nil 71.19%
Pier Caps Erected Nil 71.01%
7 Flyover Pier Cap Pier Caps Cast 90.91%
Pier Caps Erected Nil 68.19%
8 U Girder Works Pier Caps Cast 69.16%
Pier Caps Erected Nil 51.64%
9 Station Work Work is in progress at all the 13 stations Swami Samarth Nagar, Adarsh Nagar,Jogeshwari (West), Jogeshwari-Vikhroli Link Road, Shyam Nagar,Mahakali Caves, SEEPZ Village, Saki Vihar Road, Rambaug, Powai Lake, IIT Powai, Kanjurmarg (West), Vikhroli (EEH) 15.82% 18.00% 21.00% 34% 43.50%

Stations

The line will consist of 13 stations starting from Swami Samarth Nagar in Lokhandwala Complex, Andheri (West) to Vikhroli (East). It will have interchanges with Lines 2, 7, 3 and 4.[6]

Pink Line 6
# Station Name Status Interstation Distance Connections Layout
EnglishMarathi
1Swami Samarth Nagar (Lokhandwala)स्वामी समर्थ नगर (लोखंडवाला)Under Construction0 km (0 mi)NoneElevated
2Adarsh Nagarआदर्श नगरUnder Construction0.7288 km (0.4529 mi)Yellow Line 2Elevated
3Jogeshwari (West)जोगेश्वरी (पश्चिम)Under Construction0.9891 km (0.6146 mi)Jogeshwari railway station,
Western Line (Mumbai Suburban Railway)
Elevated
4JVLR Junctionजेवीएलआर जंक्शनUnder Construction1.598 km (0.993 mi)Red Line 7Elevated
5Shyam Nagarश्याम नगरUnder Construction0.9619 km (0.5977 mi)NoneElevated
6Mahakali Cavesमहाकाली लेणीUnder Construction1.5478 km (0.9618 mi)NoneElevated
7SEEPZ Villageसीप्झ गावUnder Construction1.1228 km (0.6977 mi)Aqua Line 3 (Under Construction)Elevated
8Saki Vihar Roadसाकी विहार रोडUnder Construction1.1363 km (0.7061 mi)NoneElevated
9Rambaug (Powai)रामबाग (पवई)Under Construction1.0122 km (0.6290 mi)NoneElevated
10Powai Lakeपवई तलावUnder Construction0.8493 km (0.5277 mi)NoneElevated
11IIT Powaiआयआयटी पवईUnder Construction1.0644 km (0.6614 mi)NoneElevated
12Kanjurmarg (West)कांजूरमार्ग (पश्चिम)Under Construction1.658 km (1.030 mi)Green Line 4 (Under Construction),
Kanjurmarg railway station,
Central Line (Mumbai Suburban Railway)
Elevated
13Vikhroli EEHविक्रोली इइएचUnder Construction1.056 km (0.656 mi)NoneElevated

References

  1. "Work on Mumbai's Metro-6 corridor to kick off by December". hindustantimes.com. 13 August 2018. Retrieved 13 August 2018.
  2. "Mumbai: MMRDA plans to begin work on five more Metro lines by December". The Indian Express. 7 April 2017. Retrieved 7 April 2017.
  3. "Mumbai's east-west connectivity to get a boost with another Metro corridor". hindustantimes.com. 2 March 2017. Retrieved 2 March 2017.
  4. "MMRDA to begin tree count for Metro 6". mid-day. 6 April 2017. Retrieved 6 April 2017.
  5. "Mumbai Metropolitan Region Development Authority - Metro Line - 6".
  6. "DPR for Line 6". MMRDA.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.