Surat high-speed railway station

Surat high-speed railway station is a under construction railway station on the Mumbai–Ahmedabad high-speed rail corridor.[1] It is located in the city of Surat, Gujarat, India. This station is India's first high-speed railway station.[2][3] The railway station is scheduled to be completed by December 2024.[2] The Surat station will be operational by 2026 along with the country's first high-speed railway.[4][5][6]

Surat
General information
LocationSurat - Bardoli Rd, Surat, Gujarat
India
Coordinates21°10′49″N 72°55′50″E
Owned byNational High Speed Rail Corporation Limited
Operated byNational High Speed Rail Corporation Limited
Line(s)Mumbai–Ahmedabad high-speed rail corridor
Platforms2
Tracks2
Construction
Structure typeElevated
ParkingYes
Other information
Statusunder construction
History
Opened2026 (2026)
ElectrifiedYes
Location
Surat station is located in Gujarat
Surat station
Surat station
Location within Gujarat
Interactive map

Lines

Surat high-speed railway station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and is located 266.200 km from the official starting point of the Mumbai–Ahmedabad high-speed rail corridor in Mumbai.[7]

Station layout

The Surat High-Speed Railway station will have two elevated opposite platforms, With the under constructed station building will be located underneath. The Railway station will have two side platforms, which will serve 2 tracks for regular service.

References

  1. "Surat bullet train station: Railway Ministry shares first look; details here". www.businesstoday.in. Retrieved 21 December 2022.
  2. "Surat to get India's 1st bullet train station, Union minister tweets 1st look". www.hindustantimes.com. Hindustan Times. 10 February 2022. Retrieved 21 December 2022.
  3. "In Pics: Glimpses Of India's First Bullet Train Station In Surat". www.indiatimes.com. Retrieved 21 December 2022.
  4. "Country's first bullet train to be operational by 2026: Vaishnaw". indianexpress.com. The indian Express. 7 Jun 2022. Retrieved 21 December 2022.
  5. "First Bullet Train To Start Between Surat And Bilimora: Vaishnaw". www.businessworld.in. Retrieved 21 December 2022.
  6. "'Surat-Bilimora section will be completed by Aug 2026'". timesofindia.indiatimes.com. Times of India. Retrieved 21 December 2022.
  7. "Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor Final Report Volume 6" (PDF). www.jica.go.jp. Retrieved 21 December 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.