List of missions to the Moon
As part of human exploration of the Moon, numerous space missions have been undertaken to study Earth's natural satellite. Of the Moon landings, Luna 2 of the Soviet Union was the first spacecraft to reach its surface successfully,[1] intentionally impacting the Moon on 13 September 1959. In 1966, Luna 9 became the first spacecraft to achieve a controlled soft landing,[2] while Luna 10 became the first mission to enter orbit.

Between 1968 and 1972, crewed missions to the Moon were conducted by the United States as part of the Apollo program. Apollo 8 was the first crewed mission to enter orbit in December 1968, and it was followed by Apollo 10 in May 1969. Six missions landed humans on the Moon, beginning with Apollo 11 in July 1969, during which Neil Armstrong became the first person to walk on the Moon. Apollo 13 was intended to land; however, it was restricted to a flyby due to a malfunction aboard the spacecraft. All nine crewed missions returned safely to the Earth.
While the United States focused on the crewed Apollo program, the Soviet Union conducted uncrewed missions that deployed rovers and returned samples to the Earth. Three rover missions were launched, of which two were successful, and eleven sample return flights were attempted with three successes.
Missions to the Moon have been conducted by the following nations and organisations (in chronological order): the Soviet Union, the United States, Japan, the European Space Agency, China, India, Luxembourg, Israel, Italy, South Korea, and the United Arab Emirates. The Moon has also been visited by five spacecraft not dedicated to studying it; four spacecraft have flown past it to gain gravity assistance, and a radio telescope, Explorer 49, was placed into selenocentric orbit in order to use the Moon to block interference from terrestrial radio sources.
Statistics
Country | Flyby | Orbit | Impact | Lander | Rover | Return | Crewed landing |
---|---|---|---|---|---|---|---|
![]() |
— | ||||||
![]() |
|||||||
![]() |
— | — | |||||
![]() |
— | — | — | — | |||
![]() |
— | ||||||
![]() |
— | — | |||||
![]() |
— | — | — | — | — | ||
![]() |
— | — | — | ||||
![]() |
— | — | — | — | — | — | |
![]() |
— | — | — | — | — | ||
![]() |
— | — | — |
Missions by date

Mission | Spacecraft | Launch date | Carrier rocket | Operator | Mission type | Outcome |
---|---|---|---|---|---|---|
Pioneer 0
(Able I)[3] |
Pioneer 0 | 17 August 1958 | Thor DM-18 Able I[3] | ![]() |
Orbiter | Launch failure |
First attempted launch beyond Earth orbit; failed to orbit due to turbopump gearbox malfunction resulting in first-stage explosion.[3] Reached apogee of 16 kilometres (9.9 mi).[4] | ||||||
Luna E-1 No.1 | Luna E-1 No.1 | 23 September 1958 | Luna | ![]() |
Impactor | Launch failure |
Failed to orbit; rocket disintegrated due to excessive vibration.[3][5] | ||||||
Pioneer 1
(Able II)[3] |
Pioneer 1 | 11 October 1958 | Thor DM-18 Able I[3] | ![]() |
Orbiter | Launch failure |
Failed to orbit; premature second-stage cutoff due to accelerometer failure. Later known as Pioneer 1.[3] Reached apogee of 113,800 kilometres (70,700 mi).[6] | ||||||
Luna E-1 No.2 | Luna E-1 No.2 | 11 October 1958 | Luna | ![]() |
Impactor | Launch failure |
Failed to orbit; carrier rocket exploded due to excessive vibration.[3][5] | ||||||
Pioneer 2
(Able III) |
Pioneer 2 | 8 November 1958 | Thor DM-18 Able I | ![]() |
Orbiter | Launch failure |
Failed to orbit; premature second-stage cutoff due to erroneous command by ground controllers; third stage failed to ignite due to broken electrical connection.[3] Reached apogee of 1,550 kilometres (960 mi).[7] | ||||||
Luna E-1 No.3 | Luna E-1 No.3 | 4 December 1958 | Luna | ![]() |
Impactor | Launch failure |
Failed to orbit; seal failure in hydrogen peroxide pump cooling system resulted in core-stage underperformance.[3][5] | ||||||
Pioneer 3 | Pioneer 3 | 6 December 1958 | Juno II | ![]() |
Flyby | Launch failure |
Failed to orbit; premature first-stage cutoff.[3] Reached apogee of 102,360 kilometres (63,600 mi).[8] | ||||||
Luna 1
(E-1 No.4) |
Luna 1 | 2 January 1959 | Luna | ![]() |
Impactor | Partial failure |
Carrier rocket guidance problem resulted in failure to impact Moon, flew past in a heliocentric orbit.[9] Closest approach 5,995 kilometres (3,725 mi) on 4 January.[10] First spacecraft to fly by the Moon. | ||||||
Pioneer 4 | Pioneer 4 | 3 March 1959 | Juno II | ![]() |
Flyby | Partial failure |
Second-stage overperformance resulted in flyby at greater altitude than expected, out of instrument range, with 58,983 kilometres (36,650 mi) of distance.[9] Closest approach at 22:25 UTC on 4 March. First U.S. spacecraft to leave Earth orbit.[11] | ||||||
E-1A No.1 | E-1A No.1 | 18 June 1959 | Luna | ![]() |
Impactor | Launch failure |
Failed to orbit; guidance system malfunction.[9] | ||||||
Luna 2
(E-1A No.2) |
Luna 2 | 12 September 1959 | Luna | ![]() |
Impactor | Successful |
Successful impact at 21:02 on 14 September 1959. First spacecraft to reach lunar surface.[12] The impact made the Soviet Union the 1st country to reach the surface of the Moon. | ||||||
Luna 3
(E-2A No.1) |
Luna 3 | 4 October 1959 | Luna | ![]() |
Flyby | Successful |
Returned first images of the far side of the Moon.[13] | ||||||
Pioneer P-3
Able IVB |
Pioneer P-3 | 26 November 1959 | Atlas-D Able | ![]() |
Orbiter | Launch failure |
Failed to orbit;[14] payload fairing disintegrated due to design fault.[9] | ||||||
Luna E-3 No.1 | Luna E-3 No.1 | 15 April 1960 | Luna | ![]() |
Flyby | Launch failure |
Failed to orbit; premature third-stage cutoff.[15] | ||||||
Luna E-3 No.2 | Luna E-3 No.2 | 16 April 1960 | Luna | ![]() |
Flyby | Launch failure |
Failed to orbit; rocket disintegrated ten seconds after launch.[15] | ||||||
Pioneer P-30
(Able VA) |
Pioneer P-30 | 25 September 1960 | Atlas-D Able | ![]() |
Orbiter | Launch failure |
Failed to orbit; second-stage oxidizer system malfunction resulting in premature cutoff.[16][15] | ||||||
Pioneer P-31
(Able VB) |
Pioneer P-31 | 15 December 1960 | Atlas-D Able | ![]() |
Orbiter | Launch failure |
Failed to orbit, exploded 68 seconds after launch, at an altitude of 12.2 kilometres (7.6 mi). Second stage ignited while first stage was still attached and burning.[17][15] | ||||||
Ranger 3
(P-34) |
Ranger 3 | 26 January 1962 | Atlas LV-3 Agena-B | ![]() |
Impactor | Spacecraft failure |
Ranger 3 lander | Lander | Spacecraft failure | ||||
Partial launch failure due to guidance problem; attempt to correct using spacecraft's engine resulted in it missing the Moon by 36,793 kilometres (22,862 mi).[18][19] | ||||||
Ranger 4
(P-35) |
Ranger 4 | 23 April 1962 | Atlas LV-3 Agena-B | ![]() |
Impactor | Spacecraft failure |
Ranger 4 lander | Lander | Spacecraft failure | ||||
Failed to deploy solar panels, ran out of power ten hours after launch; incidental impact on the far side of the Moon on 26 April. First spacecraft to impact the far side of the Moon.[18][20] The impact made the United States the 2nd country to reach the surface of the Moon. | ||||||
Ranger 5
(P-36) |
Ranger 5 | 18 October 1962 | Atlas LV-3 Agena-B | ![]() |
Impactor | Spacecraft failure |
Ranger 5 lander | Lander | Spacecraft failure | ||||
Solar panels erroneously disengaged from power system, failed 8+3⁄4 hours after launch when batteries were depleted.[18] Missed the Moon as course correction was not completed.[21] | ||||||
Luna E-6 No.2 | Luna E-6 No.2 | 4 January 1963 | Molniya-L | ![]() |
Lander | Launch failure |
Failed to depart Low Earth orbit;[22] guidance system power failure prevented upper-stage ignition.[23] | ||||||
Luna E-6 No.3 | Luna E-6 No.3 | 3 February 1963 | Molniya-L | ![]() |
Lander | Launch failure |
Failed to orbit; guidance failure.[23] | ||||||
Luna 4
(E-6 No.4) |
Luna 4 | 2 April 1963 | Molniya-L | ![]() |
Lander | Spacecraft failure |
Failed to perform mid-course correction,[23] remained in high Earth orbit until given escape velocity by orbital perturbation.[24] | ||||||
Ranger 6
(P-54) |
Ranger 6 | 30 January 1964 | Atlas LV-3 Agena-B | ![]() |
Impactor | Spacecraft failure |
Impacted on 2 February 1964, failed to return images due to power system failure.[25][26] | ||||||
Luna E-6 No.6 | Luna E-6 No.6 | 21 March 1964 | Molniya-M | ![]() |
Lander | Launch failure |
Failed to orbit; third stage underperformed due to oxidiser valve failure.[25] | ||||||
Luna E-6 No.5 | Luna E-6 No.5 | 20 April 1964 | Molniya-M | ![]() |
Lander | Launch failure |
Failed to orbit; power failure caused by broken connection resulted in premature third-stage cutoff.[25] | ||||||
Ranger 7 | Ranger 7 | 28 July 1964 | Atlas LV-3 Agena-B | ![]() |
Impactor | Successful |
Impacted on 30 July 1964 at 13:25:48 UTC.[27] | ||||||
Ranger 8 | Ranger 8 | 17 February 1965 | Atlas LV-3 Agena-B | ![]() |
Impactor | Successful |
Impacted on 20 February 1965 at 09:57:37 UTC.[28][29] | ||||||
Kosmos 60
(E-6 No.9) |
Kosmos 60 | 12 March 1965 | Molniya-L | ![]() |
Lander | Launch failure |
Upper stage failed to restart due to guidance system short circuit,[28] Failed to depart low Earth orbit.[30] | ||||||
Ranger 9 | Ranger 9 | 21 March 1965 | Atlas LV-3 Agena-B | ![]() |
Impactor | Successful |
Impacted on 24 March 1965 at 14:08:20 UTC.[28][31] | ||||||
Luna E-6 No.8 | Luna E-6 No.8 | 10 April 1965 | Molniya-L | ![]() |
Lander | Spacecraft failure |
Third stage failed to ignite due to loss of oxidiser pressure, failed to orbit.[28] | ||||||
Luna 5
(E-6 No.10) |
Luna 5 | 9 May 1965 | Molniya-M | ![]() |
lander | Spacecraft failure |
Loss of control after gyroscope malfunction,[28] failed to decelerate for landing and impacted the Moon at 19:10 UTC on 12 May 1965.[32] | ||||||
Luna 6
(E-6 No.7) |
Luna 6 | 8 June 1965 | Molniya-M | ![]() |
Lander | Spacecraft failure |
Engine failed to shut down after performing mid-course correction manoeuvre,[28] flew past the Moon in a heliocentric orbit.[33] | ||||||
Zond 3
(3MV-4 No.3) |
Zond 3 | 18 July 1965 | Molniya | ![]() |
Flyby | Successful |
Flew past the Moon on 20 July 1965 at a distance of 9,200 kilometres (5,700 mi).[34] Conducted technology demonstration for future planetary missions.[28] | ||||||
Luna 7
(E-6 No.11) |
Luna 7 | 4 October 1965 | Molniya | ![]() |
Lander | Spacecraft failure |
Attitude control failure shortly before landing prevented controlled descent; impacted the lunar surface 22:08:24 UTC on 7 October 1965.[28][35] | ||||||
Luna 8
(E-6 No.12) |
Luna 8 | 3 December 1965 | Molniya | ![]() |
Lander | Spacecraft failure |
Landing airbag punctured, resulting in loss of attitude control shortly before planned touchdown,[28] impacted Moon on 6 December 1965 at 21:51:30 UTC.[36] | ||||||
Luna 9
(E-6 No.13) |
Luna 9 | 31 January 1966 | Molniya-M | ![]() |
Lander | Successful |
First spacecraft to land successfully on the Moon. Touchdown on 3 February 1966 at 18:45:30 UTC.[37] Returned data until 6 February at 22:55 UTC.[38] | ||||||
Kosmos 111
(E-6S No.204) |
Kosmos 111 | 1 March 1966 | Molniya-M | ![]() |
Orbiter | Launch failure |
Upper stage lost attitude control and failed to ignite;[38] spacecraft never left low Earth orbit.[39] | ||||||
Luna 10
(E-6S No.206) |
Luna 10 | 31 March 1966 | Molniya-M | ![]() |
Orbiter | Successful |
Entered orbit at 18:44 UTC on 3 April 1966, becoming the first spacecraft to orbit the Moon.[40] Continued to return data until 30 May.[38] | ||||||
Surveyor 1 | Surveyor 1 | 30 May 1966 | Atlas LV-3C Centaur-D | ![]() |
Lander | Successful |
Landed in Oceanus Procellarum on 2 June 1966 at 06:17:36 UTC.[38] Returned data until loss of power on 13 July.[41] | ||||||
Explorer 33
(AIMP-D) |
Explorer 33 | 1 July 1966 | Delta E1 | ![]() |
Orbiter | Launch failure |
Magnetospheric probe; rocket imparted greater velocity than had been planned, leaving spacecraft unable to enter orbit.[38] Repurposed for Earth orbit mission which was completed successfully.[42] | ||||||
Lunar Orbiter 1 | Lunar Orbiter 1 | 10 August 1966 | Atlas SLV-3 Agena-D | ![]() |
Orbiter | Partial failure |
Orbital insertion at around 15:36 UTC on 14 August. Deorbited early due to lack of fuel and to avoid communications interference with the next mission, impacted the Moon at 13:30 UTC on 29 October 1966.[43] | ||||||
Luna 11
(E-6LF No.101) |
Luna 11 | 21 August 1966 | Molniya-M | ![]() |
Orbiter | Partial failure |
Entered orbit on 28 August 1966. Failed to return images; other instruments operated correctly.[38] Conducted gamma ray and X-ray observations to study the composition of the Moon, investigated the lunar gravitational field, the presence of meteorites in the lunar environment and the radiation environment at the Moon. Ceased operations on 1 October 1966 after power was depleted.[44] | ||||||
Surveyor 2 | Surveyor 2 | 20 September 1966 | Atlas LV-3C Centaur-D | ![]() |
Lander | Spacecraft failure |
One thruster failed to ignite during mid-course correction manoeuvre resulting in loss of control.[38] Impacted the Moon at 03:18 UTC on 23 September 1966.[45] | ||||||
Luna 12
(E-6LF No.102) |
Luna 12 | 22 October 1966 | Molniya-M | ![]() |
Orbiter | Successful |
Entered orbit on 25 October 1966 and returned data until 19 January 1967.[46] Completed photography mission intended for Luna 11.[38] | ||||||
Lunar Orbiter 2 | Lunar Orbiter 2 | 6 November 1966 | Atlas SLV-3 Agena-D | ![]() |
Orbiter | Successful |
Entered orbit at about 19:51 UTC on 10 November 1966 to begin photographic mapping mission. Impacted on the far side of the lunar surface following deorbit burn on 11 October 1967 at end of mission.[47] | ||||||
Luna 13
(E-6M No.205) |
Luna 13 | 21 December 1966 | Molniya-M | ![]() |
Lander | Successful |
Successfully landed in Oceanus Procellarum at 18:01 UTC on 24 December 1966.[38] Returned images from the surface and studied the lunar soil.[48] Operated until depletion of power at 06:31 UTC on 28 December.[38] | ||||||
Lunar Orbiter 3 | Lunar Orbiter 3 | 5 February 1967 | Atlas SLV-3 Agena-D | ![]() |
Orbiter | Successful |
Entered orbit at 21:54 UTC on 8 February 1967. Deorbited at end of mission and impacted the Moon on 9 October 1967.[49] | ||||||
Surveyor 3 | Surveyor 3 | 17 April 1967 | Atlas LV-3C Centaur-D | ![]() |
Lander | Successful |
Landed at 00:04 UTC on 20 April 1967 and operated until 3 May.[50][51] Visited by Apollo 12 astronauts in 1969, with some parts removed for return to Earth.[52] | ||||||
Lunar Orbiter 4 | Lunar Orbiter 4 | 4 May 1967 | Atlas SLV-3 Agena-D | ![]() |
Orbiter | Successful |
Entered orbit at 21:54 UTC on 8 May 1967, operated until 17 July. Decayed from orbit, with lunar impact occurring on 6 October 1967.[50][53] | ||||||
Surveyor 4 | Surveyor 4 | 14 July 1967 | Atlas LV-3C Centaur-D | ![]() |
Lander | Spacecraft failure |
Contact with spacecraft lost at 02:03 UTC on 17 July, two and a half minutes before scheduled landing.[50] NASA determined that the spacecraft may have exploded, otherwise it impacted the Moon.[54] | ||||||
Explorer 35
(AIMP-E) |
Explorer 35
(AIMP-E) |
19 July 1967 | Delta E1 | ![]() |
Orbiter | Successful |
Magnetospheric probe, studying the Moon and interplanetary space. Deactivated on 27 June 1973.[55] Presumed to have impacted the Moon during the 1970s.[56] | ||||||
Lunar Orbiter 5 | Lunar Orbiter 5 | 1 August 1967 | Atlas SLV-3 Agena-D | ![]() |
Orbiter | Successful |
Final mission in the Lunar Orbiter series, entered selenocentric orbit on 5 August at 16:48 UTC and conducted a photographic survey until 18 August. Deorbited and impacted the Moon on 31 January 1968.[57] | ||||||
Surveyor 5 | Surveyor 5 | 8 September 1967 | Atlas SLV-3C Centaur-D | ![]() |
Lander | Successful |
Landed in Mare Tranquillitatis at 00:46:44 UTC on 11 September. Last signals received at 04:30 UTC on 17 December 1967.[58] | ||||||
Soyuz 7K-L1 No.4L | Soyuz 7K-L1 No.4L | 27 September 1967 | Proton-K/D | ![]() |
Flyby | Spacecraft failure |
Technology demonstration for planned crewed missions. Failed to reach orbit after a blocked propellant line caused one of the first-stage engines to not ignite.[50] | ||||||
Surveyor 6 | Surveyor 6 | 7 November 1967 | Atlas SLV-3C Centaur-D | ![]() |
Lander | Successful |
Landed in Sinus Medii at 01:01:04 UTC on 10 November.[50] Made brief flight from lunar surface at 10:32 UTC on 17 November, followed by second landing after travelling 2.4 metres (7 ft 10 in). Last contact at 19:14 UTC on 14 December.[59] | ||||||
Soyuz 7K-L1 No.5L | Soyuz 7K-L1 No.5L | 22 November 1967 | Proton-K/D | ![]() |
Flyby | Launch failure |
Technology demonstration for planned crewed missions; unable to achieve orbit after second-stage engine failed to ignite.[50] | ||||||
Surveyor 7 | Surveyor 7 | 7 January 1968 | Atlas SLV-3C Centaur-D | ![]() |
Lander | Successful |
Final Surveyor mission.[60] Landed 29 kilometres (18 mi) from Tycho crater at 01:05:36 UTC on 10 January. Operated until 21 February 1968.[61] | ||||||
Luna E-6LS No.112 | Luna E-6LS No.112 | 7 February 1968 | Molniya-M | ![]() |
Orbiter | Launch failure |
Failed to orbit after third stage ran out of fuel.[61] | ||||||
Luna 14
(E-6LS No.113) |
Luna 14 | 7 April 1968 | Molniya-M | ![]() |
Orbiter | Successful |
Tested communications for proposed crewed missions and studied the mass concentration of the Moon. Entered orbit on 10 April at 19:25 UTC.[62] | ||||||
Soyuz 7K-L1 No.7L | Soyuz 7K-L1 No.7L | 22 April 1968 | Proton-K/D | ![]() |
Flyby | Launch failure |
Technology demonstration for planned crewed missions. Failed to orbit after second-stage engine incorrectly commanded to shut down. Spacecraft was recovered using its prototype launch escape system.[61] | ||||||
Zond 5
(7K-L1 No.9L) |
Zond 5 | 14 September 1968 | Proton-K/D | ![]() |
Flyby | Successful |
Two tortoises and other life forms on board a technology demonstration for planned crewed missions. Made a closest approach of 1,950 kilometres (1,210 mi) on 18 September, and circled the Moon before returning to Earth. Landed in the Indian Ocean on 21 September at 16:08 UTC, becoming the first Lunar spacecraft to be recovered successfully and carried the first Earth life to travel to and around the Moon.[63] | ||||||
Zond 6
(7K-L1 No.12L) |
Zond 6 | 10 November 1968 | Proton-K/D | ![]() |
Flyby | Spacecraft failure |
Technology demonstration for planned crewed missions. Flyby occurred on 14 November, with a closest approach of 2,420 kilometres (1,500 mi).[64] Reentered Earth's atmosphere on 17 November; however, recovery was unsuccessful after parachutes were prematurely jettisoned.[61] | ||||||
Apollo 8 | Apollo 8 | 21 December 1968 | Saturn V | ![]() |
Crewed orbiter | Successful |
First crewed mission to the Moon; entered orbit around the Moon with four-minute burn beginning at 09:59:52 UTC on 24 December. Completed ten orbits of the Moon before returning to Earth with an engine burn at 06:10:16 UTC on 25 December. Landed in the Pacific Ocean at 15:51 UTC on 27 December.[65] | ||||||
Soyuz 7K-L1 No.13L | Soyuz 7K-L1 No.13L | 20 January 1969 | Proton-K/D | ![]() |
Flyby | Launch failure |
Technology demonstration for planned crewed missions. Failed to orbit after one of the four second-stage engines shut down prematurely. Third-stage engine also shut down prematurely. The spacecraft was recovered using its launch escape system.[66] | ||||||
Luna E-8 No.201 | Luna E-8 No.201 | 19 February 1969 | Proton-K/D | ![]() |
Lander | Launch failure |
Lunokhod | Rover | Launch failure | ||||
First launch of the Lunokhod rover. Launch vehicle disintegrated 51 seconds after launch and exploded.[67] | ||||||
Soyuz 7K-L1S No.3 | Soyuz 7K-L1S No.3 | 21 February 1969 | N1 | ![]() |
Orbiter | Launch failure |
First launch of N1 rocket; intended to orbit the Moon and return to Earth. First stage prematurely shut down 70 seconds after launch; launch vehicle crashed 50 kilometres (31 mi) from launch site. Spacecraft landed some 35 kilometres (22 mi) from the launch pad after successfully using its launch escape system.[67] | ||||||
Apollo 10 | Apollo 10 | 18 May 1969 | Saturn V | ![]() |
Orbiter | Successful |
Apollo 10 Lunar Module | Orbiter | Successful | ||||
Dress rehearsal for Apollo 11. Lunar Module with two astronauts on board descended to a distance of 14.326 kilometres (8.902 mi) above the lunar surface.[68] | ||||||
Luna E-8-5 No.402 | Luna E-8-5 No.402 | 14 June 1969 | Proton-K/D | ![]() |
Lander | Launch failure |
Luna E-8-5 No.402 Return Craft | Sample Return | Launch failure | ||||
Intended to land on the Moon and return lunar soil sample. Did not reach Earth orbit after fourth stage failed to ignite.[66] | ||||||
Soyuz 7K-L1S No.5 | Soyuz 7K-L1S No.5 | 3 July 1969 | N1 | ![]() |
Orbiter | Launch failure |
Intended to orbit the Moon and return to Earth. All first-stage engines shut down 10 seconds after launch; launch vehicle crashed and exploded on the launch pad. Spacecraft landed safely 2 kilometres (1.2 mi) from the launch site after using launch escape sequence.[67] | ||||||
Luna 15
(E-8-5 No.401) |
Luna 15 | 13 July 1969 | Proton-K/D | ![]() |
Lander | Spacecraft failure |
Luna 15 Return Craft | Sample Return | Launch failure | ||||
Reached lunar orbit at 10:00 UTC on 17 July. Descent retro-rocket burn started at 15:47 UTC on 21 July. Contact lost three minutes after de-orbit burn; probably crashed on the Moon.[67] | ||||||
Apollo 11 | Apollo 11 | 16 July 1969 | Saturn V | ![]() |
Orbiter | Successful |
Apollo 11 Lunar Module | Lander/Launch Vehicle | Successful | ||||
First crewed landing on the Moon. The Lunar Module Eagle landed at 20:17 UTC on 20 July 1969. | ||||||
Zond 7
(7K-L1 No.11L) |
Zond 7 | 7 August 1969 | Proton-K/D | ![]() |
Flyby | Successful |
Technology demonstration for planned crewed missions. Lunar flyby on 10 August, with a closest approach of 1,200 kilometres (750 mi); returned to Earth and landed in Kazakhstan at 18:13 UTC on 14 August.[67] | ||||||
Kosmos 300
(E-8-5 No.403) |
Kosmos 300 | 23 September 1969 | Proton-K/D | ![]() |
Lander | Launch failure |
Kosmos 300 Return Craft | Sample return | Launch failure | ||||
Third attempt at lunar sample return. After reaching low Earth orbit, the fourth-stage engine failed to fire for trans-lunar injection due to oxidiser leak. Spacecraft re-entered Earth's atmosphere about 4 days after launch.[67] | ||||||
Kosmos 305
(E-8-5 No.404) |
Kosmos 305 | 22 October 1969 | Proton-K/D | ![]() |
Lander | Launch failure |
Kosmos 305 Return Craft | Sample Return | Launch failure | ||||
Fourth attempt at lunar sample return. After reaching low Earth orbit, the fourth-stage engine failed to fire for trans-lunar injection due to control system malfunction. Spacecraft re-entered Earth's atmosphere within one orbit after launch.[67] | ||||||
Apollo 12 | Apollo 12 | 14 November 1969 | Saturn V | ![]() |
Orbiter | Successful |
Apollo 12 Lunar Module | Lander/Launch Vehicle | Successful | ||||
Second crewed lunar landing. | ||||||
Luna E-8-5 No.405 | Luna E-8-5 No.405 | 6 February 1970 | Proton-K/D | ![]() |
Lander | Launch failure |
Luna E-8-5 No.405 Return Craft | Sample return | Launch failure | ||||
Failed to orbit | ||||||
Apollo 13 | Apollo 13 | 11 April 1970 | Saturn V | ![]() |
Orbiter | Spacecraft failure |
Apollo 13 Lunar Module | Lander/Launch Vehicle | Successful | ||||
Lunar landing aborted following Service Module oxygen tank explosion en route to the Moon; flew past the Moon (free-return trajectory) and returned the crew safely to Earth. | ||||||
Luna 16
(E-8-5 No.406) |
Luna 16 | 12 September 1970 | Proton-K/D | ![]() |
Lander | Successful |
Luna 16 Return Craft | Sample return | Successful | ||||
First robotic sampling mission. | ||||||
Zond 8
(7K-L1 No.14L) |
Zond 8 | 20 October 1970 | Proton-K/D | ![]() |
Flyby | Successful |
Technology demonstration for planned crewed missions; returned to Earth successfully. | ||||||
Luna 17
(E-8 No.203) |
Luna 17 | 10 November 1970 | Proton-K/D | ![]() |
Lander | Successful |
Lunokhod 1 | Rover | Successful | ||||
Luna 17 deployed Lunokhod 1. | ||||||
Apollo 14 | Apollo 14 | 31 January 1971 | Saturn V | ![]() |
Orbiter | Successful |
Apollo 14 Lunar Module | Lander/Launch Vehicle | Successful | ||||
Third crewed lunar landing. | ||||||
Apollo 15 | Apollo 15 | 26 July 1971 | Saturn V | ![]() |
Orbiter | Successful |
Apollo 15 Lunar Module | Lander/Launch Vehicle | Successful | ||||
Lunar Roving Vehicle | Rover | Successful | ||||
Fourth crewed lunar landing, and first to use the Lunar Roving Vehicle. | ||||||
PFS-1 | PFS-1 | 26 July 1971 | Saturn V | ![]() |
Orbiter | Successful |
PFS-1 was deployed from Apollo 15. | ||||||
Luna 18
(E-8-5 No.407) |
Luna 18 | 2 September 1971 | Proton-K/D | ![]() |
Lander | Spacecraft failure |
Luna 18 Return Craft | Sample return | Spacecraft failure | ||||
Failed during descent to lunar surface. | ||||||
Luna 19
(E-8LS No.202) |
Luna 19 | 28 September 1971 | Proton-K/D | ![]() |
Orbiter | Successful |
Entered an orbit around the Moon on 2 October 1971 after two midcourse corrections on 29 September and 1 October. | ||||||
Luna 20
(E-8-5 No.408) |
Luna 20 | 14 February 1972 | Proton-K/D | ![]() |
Lander | Successful |
Luna 20 Return Craft | Sample return | Successful | ||||
Luna 20 soft landed on the Moon in a mountainous area known as the Terra Apollonius (or Apollonius highlands) near Mare Fecunditatis (Sea of Fertility), 120 km from where Luna 16 had landed. | ||||||
Apollo 16 | Apollo 16 | 16 April 1972 | Saturn V | ![]() |
Orbiter | Successful |
Apollo 16 Lunar Module | Lander/Launch Vehicle | Successful | ||||
Lunar Roving Vehicle | Rover | Successful | ||||
5th crewed lunar landing. | ||||||
PFS-2 | PFS-2 | 16 April 1972 | Saturn V | ![]() |
Orbiter | Successful |
PFS-2 deployed from Apollo 16. | ||||||
Soyuz 7K-LOK No.1 | Soyuz 7K-LOK No.1 | 3 July 1972 | N1 | ![]() |
Orbiter | Launch failure |
Failed to orbit; intended to orbit the Moon and return to Earth. | ||||||
Apollo 17 | Apollo 17 | 7 December 1972 | Saturn V | ![]() |
Orbiter | Successful |
Apollo 17 Lunar Module | Lander/Launch Vehicle | Successful | ||||
Lunar Roving Vehicle | Rover | Successful | ||||
Sixth and last crewed lunar landing and last use of the Lunar Roving Vehicle; the orbiting command module included five mice. | ||||||
Luna 21
(E-8 No.204) |
Luna 21 | 8 January 1973 | Proton-K/D | ![]() |
Lander | Successful |
Lunokhod 2 | Rover | Successful | ||||
Deployed Lunokhod 2. | ||||||
Explorer 49
(RAE-B) |
Explorer 49 | 10 June 1973 | Delta 1913 | ![]() |
Orbiter | Successful |
Radio astronomy spacecraft, operated in selenocentric orbit to avoid interference from terrestrial radio sources. | ||||||
Mariner 10 | Mariner 10 | 3 November 1973 | Atlas SLV-3D Centaur-D1A | ![]() |
Flyby | Successful |
Interplanetary spacecraft, mapped lunar north pole to test cameras. | ||||||
Luna 22
(E-8LS No.206) |
Luna 22 | 29 May 1974 | Proton-K/D | ![]() |
Orbiter | Successful |
Inserted into a circular lunar orbit on 2 June 1974 | ||||||
Luna 23
(E-8-5M No.410) |
Luna 23 | 16 October 1975 | Proton-K/D | ![]() |
Lander | Partial failure |
Luna 23 Return Craft | Sample Return | Precluded | ||||
Tipped over upon landing, precluding any sample return attempt. Functioned for three days on surface. | ||||||
Luna E-8-5M No.412 | Luna E-8-5M No.412 | 16 October 1975 | Proton-K/D | Lander | Launch failure | |
Luna E-8-5M No.412 Return Craft | Sample Return | Launch failure | ||||
Failed to orbit. | ||||||
Luna 24
(E-8-5M No.413) |
Luna 24 | 9 August 1976 | Proton-K/D | ![]() |
Lander | Successful |
Luna 24 Return Craft | Sample Return | Successful | ||||
Final mission of the Luna programme. Entered orbit on 11 August 1976 and landed in Mare Crisium at 16:36 UTC on 18 August. Sample capsule launched at 05:25 UTC on 19 August and recovered 96+1⁄2 hours later.[69] Returned 170.1 grams (6.00 oz) of lunar regolith.[70] Final mission to the Moon from the Soviet Union. | ||||||
ISEE-3
(ICE/Explorer 59) |
ISEE-3 | 12 August 1978 | Delta 2914 | ![]() |
Flyby | Successful |
Five flybys in 1982 and 1983 en route to comet 21P/Giacobini–Zinner. | ||||||
Hiten
(MUSES-A) |
Hiten | 24 January 1990 | Mu-3S-II | ![]() |
Orbiter | Successful |
Hagoromo | 24 January 1990 | Mu-3S-II | ![]() |
Orbiter | Spacecraft failure | |
Designed for flyby, placed into selenocentric orbit during extended mission after failure of Hagoromo. Deorbited and impacted in USGS quadrangle LQ27 on 10 April 1993.[71] Hagoromo was deployed from Hiten. The impact made Japan the 3rd country to reach the surface of the Moon. | ||||||
Geotail | Geotail | 24 July 1992 | Delta II 6925 | ![]() ![]() |
Flyby | Successful |
Series of flybys to regulate high Earth orbit. | ||||||
WIND | WIND | 1 November 1994 | Delta II 7925-10 | ![]() |
Flyby | Successful |
Made two flybys on 1 December 1994 and 27 December 1994 to reach the Earth–Sun L1 Lagrangian point. | ||||||
Clementine
(DSPSE) |
Clementine | 25 January 1994 | Titan II (23)G Star-37FM | ![]() |
Orbiter | Successful |
Completed Lunar objectives successfully; failed following departure from selenocentric orbit. | ||||||
HGS-1 | HGS-1 | 24 December 1997 | Proton-K/DM3 | ![]() |
Flyby | Successful |
Communications satellite; made two flybys in May and June 1998 en route to geosynchronous orbit after delivery into wrong orbit. | ||||||
Lunar Prospector
(Discovery 3) |
Lunar Prospector | 7 January 1998 | Athena II | ![]() |
Orbiter | Successful |
The mission ended on July 31, 1999 | ||||||
Nozomi
(PLANET-B) |
Nozomi | 3 July 1998 | M-V | ![]() |
Flyby | Successful |
Two flybys en route to Mars. | ||||||
WMAP | WMAP | 30 June 2001 | Delta II 7425-10 | ![]() |
Flyby | Successful |
Flyby on 30 July 2001 to reach the Earth–Sun L2 Lagrangian point. | ||||||
SMART-1 | SMART-1 | 27 September 2003 | Ariane 5G | ![]() |
Orbiter | Successful |
Impacted Moon in USGS quadrangle LQ26 at end of mission on 3 September 2006. The impact made ESA member states the 4th to reach the surface of the Moon. | ||||||
STEREO | STEREO A | 25 October 2006 | Delta II 7925-10L | ![]() |
Flyby | Successful |
STEREO B | Successful | |||||
Both component spacecraft entered heliocentric orbit on 15 December 2006. | ||||||
ARTEMIS | ARTEMIS P1 | 17 February 2007 | Delta II 7925 | ![]() |
Orbiter | Operational |
ARTEMIS P2 | Orbiter | Operational | ||||
Two THEMIS spacecraft moved to selenocentric orbit for extended mission; entered orbit July 2011. | ||||||
SELENE | Kaguya | 14 September 2007 | H-IIA 2022 | ![]() |
Orbiter | Successful |
Okina | Orbiter | Successful | ||||
Ouna | Orbiter | Successful | ||||
Deployed Okina and Ouna satellites. Kaguya and Okina impacted the Moon at end of mission.[72] Ouna completed operations on 29 June 2009[73] but remains in selenocentric orbit. | ||||||
Chang'e 1 | Chang'e 1 | 24 October 2007 | Long March 3A | ![]() |
Orbiter | Successful |
Impacted Moon in USGS quadrangle LQ21 on 1 March 2009, at end of mission. The impact made China the 6th country to reach the surface of the Moon. | ||||||
Chandrayaan-1 | Chandrayaan-1 | 22 October 2008 | PSLV-XL | ![]() |
Orbiter | Successful |
Moon Impact Probe | Impactor | Successful | ||||
Succeeded through mission. Orbit lasted 312 days, short of intended 2 years; However mission achieved most of its intended objectives. Terminated in 2009, remains in selenocentric orbit; discovered water ice on the Moon.[74] Moon Impact Probe was deployed from the orbiter. It successfully impacted Moon's Shackleton Crater in the in USGS quadrangle LQ30 at 20:31 on 14 November 2008 releasing underground debris that could be analysed by the orbiter for presence of water/ice. With this mission, India became the first to hard land or impact on Lunar south pole and the fifth nation to reach the lunar surface. | ||||||
Lunar Reconnaissance Orbiter | Lunar Reconnaissance Orbiter | 18 June 2009 | Atlas V 401 | ![]() |
Orbiter | Operational |
Entered orbit on June 23, 2009 | ||||||
LCROSS | LCROSS | 18 June 2009 | Atlas V 401 | ![]() |
Impactor | Successful |
Observed impact of Centaur upper stage that launched it and LRO, then impacted itself. Impacts in USGS quadrangle LQ30. | ||||||
Chang'e 2 | Chang'e 2 | 1 October 2010 | Long March 3C | ![]() |
Orbiter | Successful |
Following completion of six month Lunar mission, departed selenocentric orbit for Earth–Sun L2 Lagrangian point;[75] subsequently flew by asteroid 4179 Toutatis.[76] | ||||||
GRAIL | Ebb
(GRAIL-A) |
10 September 2011[77][78] | Delta II 7920H | ![]() |
Orbiter | Successful |
Flow
(GRAIL-B) |
Orbiter | Successful | ||||
Impacted the Moon in USGS quadrangle LQ01 on 17 December 2012 at end of mission.[79] | ||||||
LADEE | LADEE | 7 September 2013 | Minotaur V | ![]() |
Orbiter | Successful |
Mission ended on 18 April 2014, when the spacecraft's controllers intentionally crashed LADEE into the far side of the Moon. | ||||||
Chang'e 3 | Chang'e 3 | 1 December 2013 | Long March 3B | ![]() |
Lander | Operational |
Yutu | Rover | Successful | ||||
Entered orbit on 6 December 2013 with landing at 13:12 UTC on 14 December. Yutu rover was deployed from Chang'e 3. | ||||||
Chang'e 5-T1 | Chang'e 5-T1 | 23 October 2014 | Long March 3C | ![]() |
Orbiter | Successful |
Chang'e 5-T1 Return Capsule | Orbiter | Successful | ||||
Demonstration of re-entry capsule for Chang'e 5 sample-return mission at lunar return velocity. | ||||||
Manfred Memorial Moon Mission | Manfred Memorial Moon Mission | 23 October 2014 | Long March 3C | ![]() |
Flyby / Impactor (post mission) | Successful |
Attached to third stage of CZ-3C used to launch Chang'e 5-T1. Impacted the Moon on 4 March 2022. The impact made Luxembourg the 8th country to reach the surface of the Moon. | ||||||
TESS | TESS | 18 April 2018 | Falcon 9 Full Thrust | ![]() |
Flyby | Successful |
Flyby on 17 May 2018 to designated high Earth orbit.[80] | ||||||
Queqiao | Queqiao | 21 May 2018 | Long March 4C | ![]() |
Orbiter | Operational |
Entered designated Earth–Moon L2 orbit on 14 June in preparation of Chang'e 4 far-side lunar lander in December 2018. | ||||||
Longjiang | Longjiang-1 | 21 May 2018 | Long March 4C | ![]() |
Orbiter | Spacecraft failure |
Longjiang-2 | Orbiter | Successful | ||||
Launched on the same rocket as Queqiao. Longjiang-1 never entered Moon orbit,[81] while Longjiang-2 operated in lunar orbit until 31 July 2019, when it impacted the lunar surface.[82] | ||||||
Chang'e 4 | Chang'e 4 | 7 December 2018 | Long March 3B | ![]() |
Lander | Operational |
'Yutu-2 | Rover | Operational | ||||
First spacecraft to soft land on the far side of the Moon (South Pole–Aitken basin). Landed 3 January 2019 and deployed the Yutu-2 rover.[83][84] | ||||||
Beresheet | Beresheet | 22 February 2019 | Falcon 9 | ![]() |
Lander | Spacecraft failure |
First Israeli and first privately funded lunar lander mission. Technology demonstration. Instrumentation included a magnetometer and laser retroreflector.[85][86] Spacecraft crashed into the lunar surface after main engine failure during descent from lunar orbit phase.[87] The impact made Israel the 7th country to reach the surface of the Moon. | ||||||
Chandrayaan-2 | Chandrayaan-2 Orbiter | 22 July 2019 | LVM3 | ![]() |
Orbiter | Operational |
Vikram | Lander | Spacecraft Failure | ||||
Pragyan | Rover | Failure lost with Lander | ||||
Entered orbit on 20 August 2019. Lander separated from orbiter but crashed during a landing attempt on 6 September 2019, attributed to a software glitch. Both lander and rover were lost. Orbiter remained operational.[88] | ||||||
Chang'e 5 | Chang'e 5 Orbiter | 23 November 2020 | Long March 5 | ![]() |
Orbiter | Operational |
Chang'e 5 Lander | Lander | Successful | ||||
Chang'e 5 Ascender | Launch Vehicle | Successful | ||||
Chang'e 5 Returner | Sample Return | Successful | ||||
First lunar sample return mission from China, which returned 1,731 g (61.1 oz) of lunar samples on 16 December 2020. The orbiter received a mission extension and is currently in a distant retrograde orbit (DRO) of the Moon.[89] | ||||||
CAPSTONE | CAPSTONE | 28 June 2022[90] | Electron | ![]() |
Orbiter | Operational |
Lunar orbiting CubeSat that will test and verify the calculated orbital stability planned for the Gateway space station. | ||||||
Danuri | Danuri | 4 August 2022[90] | Falcon 9 | ![]() |
Orbiter[91][92] | Operational |
Lunar Orbiter by the Korea Aerospace Research Institute (KARI) of South Korea. The orbiter, its science payload and ground control infrastructure are technology demonstrators. The orbiter will also be tasked with surveying lunar resources such as water ice, uranium, helium-3, silicon, and aluminium, and produce a topographic map to help select future lunar landing sites. | ||||||
Artemis 1 | Artemis 1 Orion MPCV CM-002 | 16 November 2022[93] | SLS Block 1 | ![]() |
Orbiter | Successful |
Uncrewed test of Orion spacecraft in lunar flyby and lunar Distant retrograde orbit. | ||||||
LunaH-Map and Lunar IceCube | LunaH-Map | 16 November 2022 | SLS Block 1 | ![]() |
Orbiter | En route |
Lunar IceCube | Orbiter | Operational | ||||
H-Map will search for evidence of lunar water ice inside permanently shadowed craters using its neutron detector while, IceCube will uses its infrared spectrometer to detect water and organic compounds in the lunar surface and exosphere. | ||||||
ArgoMoon | ArgoMoon | 16 November 2022 | SLS Block 1 | ![]() |
Flybys | Operational |
It is designed to image the Interim Cryogenic Propulsion Stage and will collect telemetry validating the nanotechnology on board the platform in the hostile environment of deep space. | ||||||
LunIR | LunIR | 16 November 2022 | SLS Block 1 | ![]() |
Flyby | Successful |
It is to flyby the Moon and collect its surface thermography. | ||||||
Near-Earth Asteroid Scout | Near-Earth Asteroid Scout | 16 November 2022 | SLS Block 1 | ![]() |
Flyby | Spacecraft failure |
It is a solar sail that will flyby a near-Earth asteroid. | ||||||
EQUULEUS | EQUULEUS | 16 November 2022 | SLS Block 1 | ![]() |
Flybys | Operational |
It will image the Earth's plasmasphere, impact craters on the Moon's far side, and small trajectory maneuvers near the Moon. | ||||||
OMOTENASHI | OMOTENASHI | 16 November 2022 | SLS Block 1 | ![]() |
Impactor | Spacecraft failure |
It was a lunar surface probe attempting to semi-hard land using solid rocket motors. Carrier and solid motor was to impact. Communication failure occurred and it's missed target to become a flyby. | ||||||
BioSentinel | BioSentinel | 16 November 2022 | SLS Block 1 | ![]() |
Flyby | Successful |
CubeSat spacecraft on a astrobiology mission that will use budding yeast to detect, measure, and compare the impact of deep space radiation on DNA repair over long time beyond low Earth orbit. | ||||||
CubeSat for Solar Particles | CubeSat for Solar Particles | 16 November 2022 | SLS Block 1 | ![]() |
Flyby | Successful |
CubeSat to orbit the Sun to study the dynamic particles and magnetic fields. | ||||||
Team Miles | Team Miles | 16 November 2022 | SLS Block 1 | ![]() |
Flyby | Successful |
CubeSat that will demonstrate navigation in deep space using innovative plasma thrusters. | ||||||
Hakuto-R Mission 1 | Hakuto-R | 11 December 2022 | Falcon 9 Block 5 | ![]() |
Lander | Spacecraft failure |
SORA-Q | 11 December 2022 | Falcon 9 Block 5 | ![]() |
Rover | Spacecraft failure | |
Lunar lander technology demonstration.[94] Contact lost during final stage of landing, presumed failure. | ||||||
Emirates Lunar Mission | Rashid | 11 December 2022 | Falcon 9 Block 5 | ![]() |
Rover | Spacecraft failure |
Lunar rover demonstration. Launched aboard ispace's Hakuto-R lander.[95] Lost with Hakuto-R. The impact made the United Arab Emirates the 9th country to reach the surface of the Moon. | ||||||
Lunar Flashlight | Lunar Flashlight | 11 December 2022 | Falcon 9 Block 5 | ![]() |
Flyby | Spacecraft failure |
Initially scheduled to be launched on the Artemis 1 mission, moved to a Falcon 9 Block 5 after not making it for the payload integration deadline. NASA announced later that it would not make its planned orbit or monthly flybys due to thruster issues.[96] | ||||||
Jupiter Icy Moons Explorer | Jupiter Icy Moons Explorer | 14 April 2023 | Ariane 5 ECA | ![]() |
Flyby | En route |
Will fly by the Moon in August 2024 en route to Ganymede. |
Future missions
There are several future lunar missions planned or proposed by various nations or organisations.
Robotic
Agency or company | Mission | Name of spacecraft | Launch date | Launch vehicle | Notes |
---|---|---|---|---|---|
![]() |
Mission One | Peregrine | June/July 2023[97] | Vulcan Centaur | Part of CLPS. Peregrine lander will deliver 25 payloads to Gruithuisen Gamma |
![]() |
Colmena | 5 Microrovers | |||
![]() |
Iris | CubeRover, technology demonstration | |||
![]() |
Luna 25 | 13 July 2023[98] | Soyuz-2.1b / Fregat | Lander will explore natural resources on Moon, part of Luna-Glob programme. | |
![]() |
Chandrayaan-3 | Rover | July 2023[99] | LVM3[100] | India's second attempt to soft land on Moon. |
Relay Satellite/transfer vehicle | |||||
Lander | |||||
![]() |
SLIM[101] | SLIM lander | August 2023[102] | H-IIA 202 | Pinpoint landing, roving[103][104][105] |
LEV-1 | Hopper, carries multiple instruments | ||||
![]() | LEV-2 | Rover in preparation for Lunar Cruiser.[106] | |||
![]() |
IM-1 | Nova-C | Q3 2023[107] | Falcon 9 | Lander, Payloads delivery for NASA's CLPS and for private customers.[108] |
![]() |
Doge-1[109] | Small commercial lunar orbiter | |||
![]() |
IM-2 | Nova-C | December 2023[110][111] | Falcon 9 | Second Nova-C. Payloads delivery for NASA's CLPS. |
Khon1 | Communication Satellite | ||||
Micro-nova | Hopper | ||||
![]() |
MAPP | Rover, communication technology demonstration | |||
![]() |
AstroAnt[112] | Micro rover, will travel on MAPP rover | |||
![]() |
Yaoki[113] | Small rover, mapping | |||
![]() |
SHEPRA-ES mission[114] | SHEPRA-ES | Lunar Flyby towards Geostationary orbit, payload delivery. | ||
![]() |
Lunar Trailblazer | Orbiter, lunar ice scouting. | |||
![]() |
Queqiao 2 | Queqiao relay satellite 2 | early 2024[115] | Long March 8 | Relay satellite to support future missions of the Chinese Lunar Exploration Program targeting south pole region.[116] |
![]() |
Tiandu-1[117] | 2 orbiters, technology demonstration of lunar constellation. | |||
Tiandu-2[117] | |||||
![]() |
Chang'e 6 | Lander | May 2024[118] | Long March 5 | Sample-return from the south pole Aitken basin on the far side of the Moon[119] |
Orbiter | |||||
Ascent Vehicle | |||||
![]() |
IM-3 | Nova-C | Q2 2024[111][120] | Falcon 9 | Third Nova-C. Lunar Vertex mission |
Khon2 | Communication Satellite | ||||
![]() |
CADRE | 4 small rovers, mapping | |||
Lunar vertex | NASA organised rover | ||||
![]() |
Griffin Mission 1[121] | November 2024 | Falcon Heavy | Will host the VIPER Rover | |
![]() |
VIPER rover[122] | Will prospect for lunar resources in the south pole region, especially for water ice. | |||
![]() |
PPE and HALO[123] | November 2024 | Falcon Heavy | Key elements of Lunar Gateway. | |
![]() |
Demo mission | Starship HLS[124] | Q4 2024 | Starship | Uncrewed demo mission of Starship HLS |
![]() |
DESTINY+ | 2024[125] | Epsilon S | Lunar flyby toward asteroid 3200 Phaethon | |
![]() |
Blue Ghost M1 | Blue Ghost | 2024[126] | Falcon 9 | Lunar lander, carrying NASA-sponsored experiments and commercial payloads to Mare Crisium.[127][128] |
![]() |
Hakuto-R Mission 2 | Hakuto-R | 2024[129] | Falcon 9 | Rover for collecting lunar resources and other commercial payloads |
![]() |
Ispace rover | ||||
![]() ![]() |
Harmony 1[130] | 2024[131] | TBD | Lunar communication and navigation constellation | |
![]() |
Luna 26 | 2024[132] | Soyuz-2 | Orbiter, part of the Luna-Glob programme.[133] | |
![]() |
SERIES 2 | 2025[134] | TBD | Lunar lander part of CLPS program | |
![]() |
Luna 27 | 2025[132] | Angara A5 | Lander, part of Luna-Glob programme. | |
![]() |
Beresheet 2[135] | Orbiter | 2025 | TBD | One orbiter, Two landers. |
Lander 1 | |||||
Lander 2 | |||||
![]() |
Blue Ghost M2[136] | Blue Ghost lander | 2026 | TBD | Second mission of Firefly Aerospace, part of CLPS, includes 2 stage variant of blue ghost. |
transfer vehicle/relay satellite | |||||
![]() |
Lunar Pathfinder | Lunar communications satellite to support future lunar missions. | |||
![]() |
Chang'e 7 | Orbiter | 2026[137] | Long March 5 | Payloads include an orbiter, south pole lander, rover, and a mini flying probe to look for the presence of water-ice.[137] |
Lander | |||||
Rover | |||||
Hopper | |||||
![]() |
Starship cargo mission | 2026 | SpaceX Starship | First SpaceX lunar cargo mission, yet to be announced by SpaceX itself. | |
![]() |
FLEX[138] | Large Lunar rover, can accommodate cargo and 2 astronauts. | |||
![]() |
Astrobotic mission 3[139] | 2026 | Falcon Heavy | Third lunar mission by Astrobotic, will land at south pole, Lander will be most likely Griffin judging by the launch vehicle. | |
![]() |
Chang'e 8 | Orbiter | 2028[140] | Long March 5 | South pole lander.[141] Testing technology for using local resources and manufacturing with 3D printing.[142] |
Lander | |||||
Rover | |||||
Hopper | |||||
![]() |
SpaceX GLS-1[143] | 2028 | Falcon Heavy | First resupply mission to Lunar Gateway. | |
![]() |
HERACLES[144] | Lander | 2030 | Ariane 64 | Robotic Lander system with rover, Robotic Sample Return |
![]() |
Ascent Element | ||||
![]() |
Rover |
Crewed
Agency or company | Name | Launch date | Launch vehicle | Notes |
---|---|---|---|---|
![]() |
Artemis 2 | November 2024[145] | SLS Block 1 | Crewed test of the Orion spacecraft on a free-return trajectory around the Moon. |
![]() |
Artemis 3 | December 2025[145][146] | SLS Block 1 | Deliver the "first woman and next man" to the Moon. |
![]() |
dearMoon project | 2020s[147] | Starship | Space tourism and art project; free-return trajectory and Earth re-entry of the Starship. |
![]() |
Artemis 4 | September 2028[145] | SLS Block 1B | First flight of Block 1B configuration. Deliver I-HAB and conduct second Artemis crewed lunar landing. |
![]() |
Artemis 5 | September
2029[148] |
SLS Block 1B | Crewed Gateway and Surface expedition. Delivery of ESPRIT and Lunar Terrain Vehicle. |
![]() |
M1 | 2029[149] | Yenisei | Proposed Crewed lunar flyby using the Orel spacecraft. |
![]() |
Artemis 6 | September
2030[148] |
SLS Block 1B | Lunar Landing with delivery of Gateway Airlock Module. |
![]() |
Chinese crewed lunar mission 1 | 2030[150] | Long March 10 | Two launches of the LM-10 to put a pair of astronauts on the Moon for a 6-hour stay.[116] |
Robotic
The following robotic space probe missions have been proposed but their full funding is unclear or not yet been requested:
Agency or company | Mission | Name of spacecraft | Proposed launch | Notes |
---|---|---|---|---|
![]() |
Lunar Polar Exploration Mission | LUPEX lander | 2025 | Lander and rover, part of the Chandrayaan programme; a proposal under study.[151] |
![]() |
LUPEX rover | |||
![]() | Garatéa-L | 2025[152] | Proposed lunar CubeSat, Partnership between UKSA and ESA. | |
![]() |
LSAS lander | 2025 | proposed commercial lander, will rideshare with a Geostationary satellite. | |
![]() | Chandryaan-5 | 2025-30 | On site sampling of lunar soil. Purposed in a time frame of 2025-30.[153] | |
![]() |
Parsec lunar satellites | 2025 | Parsec lunar communication constellation.[154] | |
![]() |
Lunar Trailblazer | 2026 | Under study for possible rover mission | |
![]() |
Lunar zebro | 2026 | Small swarming rover, radiation measurments | |
![]() |
ILRS 1-5 | 2026 - 2035 | 5 crucial missions planned for comprehensive establishment of ILRS to complete the in-orbit and surface facilities | |
![]() |
Luna 28 | 2027[132] | Proposed Sample-return mission, part of Luna-Glob program, may include small rover. | |
![]() |
Luna 29 | Luna 29 Lander | 2028 | Proposed Sample-return mission, part of Luna-Glob program, Will include Luna-Grunt rover. |
Luna-Grunt rover | ||||
![]() |
Phase 2 of the Korean lunar exploration program | 2030 [155] | Lander and rover | |
![]() |
Zeus | 2030 | Nuclear Propelled Space Tug, might deliver payloads to the moon | |
![]() | Chandryaan-6 | 2030-35 | Sample return mission, to be launch in a time frame of 2030-35.[153] | |
![]() | BOLAS | TBD | 2 tethered CubeSats on a very low lunar orbit.[156] | |
![]() | Autonomous Impactor for Lunar Exploration | TBD | Impactor for LEAP | |
![]() | Lunar Crater Radio Telescope | TBD | Radio telescope made by 4 rovers | |
![]() | Lunar space elevator | TBD | Creating a reusable, replaceable and expandable Lunar elevator to open up the resources present on the Moon | |
![]() |
LVICE² | TBD | Measuring the concentration of micrometeorites[157] |
Lunar missions by organization/company
Country | Agency or company | Successful | Partial Failure | Failure | Operational | Total | Total
(for country) |
---|---|---|---|---|---|---|---|
![]() |
NASA | 36 | 2 | 14 | 3 | 55 | 57 |
USAF | 1 | - | 1 | - | 2 | ||
![]() |
Lavochkin | 16 | 2 | 22 | - | 40 | 58 |
Energia | 2 | - | 16 | - | 18 | ||
![]() |
CNSA | 4 | - | - | 4 | 8 | 8 |
![]() |
ISAS | 2 | - | 2 | - | 4 | 5 |
JAXA | 1 | - | - | - | 1 | ||
![]() |
ISRO | 1 | 1 | - | 1 | 3 | 3 |
![]() |
ESA | 1 | - | - | - | 1 | 1 |
![]() |
LuxSpace | 1 | - | - | - | 1 | 1 |
![]() |
SpaceIL | - | - | 1 | - | 1 | 1 |
![]() |
KARI | 1 | - | - | 1 | 1 | 1 |
Unrealized concepts
2010s
- Resource Prospector – concept by NASA of a rover that would have performed a survey expedition on a polar region of the Moon. It was canceled in April 2018.[158]
See also
References
- "Why failure is the fuel for a trip to Moon". The Times of India. 11 September 2019. Archived from the original on 19 February 2021. Retrieved 11 September 2019.
- "Chandrayaan-2 landing: 40% lunar missions in last 60 years failed, finds Nasa report". Archived from the original on 8 September 2019. Retrieved 28 June 2022.
- Siddiqi, Asif A. (2002). "1958" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 17–19. Archived (PDF) from the original on 12 February 2013. Retrieved 12 July 2017.
- "Pioneer 0". US National Space Science Data Center. Archived from the original on 19 December 2021. Retrieved 3 December 2013.
- Wade, Mark. "Luna E-1". Encyclopedia Astronautica. Archived from the original on 22 December 2010. Retrieved 3 December 2013.
- "Pioneer 1". US National Space Science Data Center. Archived from the original on 5 April 2022. Retrieved 3 December 2013.
- "Pioneer 2". US National Space Science Data Center. Archived from the original on 9 February 2022. Retrieved 3 December 2013.
- "Pioneer 3". US National Space Science Data Center. Archived from the original on 19 April 2019. Retrieved 3 December 2013.
- Siddiqi, Asif A. (2002). "1959" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 21–24. Archived (PDF) from the original on 22 September 2020. Retrieved 12 July 2017.
- "Luna 1". US National Space Science Data Center. Archived from the original on 2 June 2019. Retrieved 3 December 2013.
- "Pioneer 4". US National Space Science Data Center. Archived from the original on 23 February 2017. Retrieved 3 December 2013.
- "Luna 2". US National Space Science Data Center. Archived from the original on 25 August 2019. Retrieved 3 December 2013.
- "Luna 3". US National Space Science Data Center. Archived from the original on 4 June 2021. Retrieved 3 December 2013.
- "Pioneer P-3". US National Space Science Data Center. Archived from the original on 19 June 2019. Retrieved 3 December 2013.
- Siddiqi, Asif A. (2002). "1960" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 25–27. Archived (PDF) from the original on 27 October 2020. Retrieved 12 July 2017.
- "Pioneer P-30". US National Space Science Data Center. Archived from the original on 26 June 2019. Retrieved 3 December 2013.
- "Pioneer P-31". US National Space Science Data Center. Archived from the original on 29 June 2019. Retrieved 3 December 2013.
- Siddiqi, Asif A. (2002). "1962" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 34–37. Archived (PDF) from the original on 8 March 2021. Retrieved 12 July 2017.
- "Ranger 3". US National Space Science Data Center. Archived from the original on 8 January 2017. Retrieved 3 December 2013.
- "Ranger 4". US National Space Science Data Center. Archived from the original on 29 June 2019. Retrieved 3 December 2013.
- "Ranger 5". US National Space Science Data Center. Archived from the original on 12 April 2016. Retrieved 3 December 2013.
- "Sputnik 25". US National Space Science Data Center. Archived from the original on 7 July 2020. Retrieved 3 December 2013.
- Siddiqi, Asif A. (2002). "1963" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 39–40. Archived (PDF) from the original on 8 March 2021. Retrieved 12 July 2017.
- "Luna 4". US National Space Science Data Center. Archived from the original on 10 February 2020. Retrieved 3 December 2013.
- Siddiqi, Asif A. (2002). "1964" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 41–45. Archived (PDF) from the original on 8 March 2021. Retrieved 12 July 2017.
- "Luna 4". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 3 December 2013.
- "Ranger 7". US National Space Science Data Center. Archived from the original on 20 July 2019. Retrieved 3 December 2013.
- Siddiqi, Asif A. (2002). "1965" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 47–52. Archived (PDF) from the original on 8 March 2021. Retrieved 12 July 2017.
- "Ranger 8". US National Space Science Data Center. Archived from the original on 15 September 2019. Retrieved 4 December 2013.
- "Cosmos 60". US National Space Science Data Center. Archived from the original on 6 July 2020. Retrieved 4 December 2013.
- "Ranger 9". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 4 December 2013.
- "Luna 5". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 4 December 2013.
- "Luna 6". US National Space Science Data Center. Archived from the original on 10 February 2020. Retrieved 4 December 2013.
- "Zond 3". US National Space Science Data Center. Archived from the original on 19 March 2021. Retrieved 4 December 2013.
- "Luna 7". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 4 December 2013.
- "Luna 8". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 4 December 2013.
- "Luna 9". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 4 December 2013.
- Siddiqi, Asif A. (2002). "1966" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 47–52. Archived (PDF) from the original on 6 June 2013. Retrieved 12 July 2017.
- "Cosmos 111". US National Space Science Data Center. Archived from the original on 23 April 2021. Retrieved 4 December 2013.
- "Luna 10". US National Space Science Data Center. Archived from the original on 27 July 2019. Retrieved 5 December 2013.
- "Surveyor 1". US National Space Science Data Center. Archived from the original on 27 September 2019. Retrieved 5 December 2013.
- "Explorer 33". US National Space Science Data Center. Archived from the original on 14 February 2020. Retrieved 5 December 2013.
- "Lunar Orbiter 1". US National Space Science Data Center. Archived from the original on 7 August 2019. Retrieved 5 December 2013.
- "Luna 11". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 6 December 2013.
- "Surveyor 2". US National Space Science Data Center. Archived from the original on 28 April 2019. Retrieved 6 December 2013.
- "Luna 12". US National Space Science Data Center. Archived from the original on 28 April 2019. Retrieved 6 December 2013.
- "Lunar Orbiter 2". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 6 December 2013.
- "Luna 13". US National Space Science Data Center. Archived from the original on 22 November 2019. Retrieved 6 December 2013.
- "Lunar Orbiter 3". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 17 December 2013.
- Siddiqi, Asif A. (2002). "1967" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 47–52. Archived (PDF) from the original on 11 March 2021. Retrieved 12 July 2017.
- "Surveyor 3". US National Space Science Data Center. Archived from the original on 4 September 2019. Retrieved 17 December 2013.
- "Surveyor Lunar Spacecraft". Boeing. Archived from the original on 17 December 2013. Retrieved 17 December 2013.
- "Lunar Orbiter 4". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 26 May 2014.
- "Surveyor 4". US National Space Science Data Center. Archived from the original on 28 April 2019. Retrieved 17 December 2013.
- "Explorer 35". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 26 May 2014.
- "Explorer 35". NASA. Archived from the original on 30 November 2022. Retrieved 22 January 2023.
- "Lunar Orbiter 5". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 26 May 2014.
- "Surveyor 5". US National Space Science Data Center. Archived from the original on 28 April 2019. Retrieved 26 May 2014.
- "Surveyor 6". US National Space Science Data Center. Archived from the original on 28 April 2019. Retrieved 26 May 2014.
- "Surveyor 7". US National Space Science Data Center. Archived from the original on 28 April 2019. Retrieved 26 May 2014.
- Siddiqi, Asif A. (2002). "1968" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 69–72. Archived (PDF) from the original on 27 October 2020. Retrieved 12 July 2017.
- "Luna 14". US National Space Science Data Center. Archived from the original on 17 April 2019. Retrieved 31 May 2014.
- "Zond 5". NASA Space Science and Data Coordinated Archive. Retrieved 20 March 2023.
- "Zond 6". US National Space Science Data Center. Archived from the original on 4 April 2019. Retrieved 31 May 2014.
- "Apollo 8". National Aeronautics and Space Administration. 8 July 2009. Archived from the original on 20 May 2014. Retrieved 31 May 2014.
- Siddiqi, Asif A. (2002). "1969" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 73–80.
- Siddiqi, Asif A. (2002). "1969" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 73–80. Archived (PDF) from the original on 27 October 2020. Retrieved 12 July 2017.
- "APOLLO 10 (AS-505)". Smithsonian Air and Space Museum. Archived from the original on 4 July 2017. Retrieved 4 April 2019.
- Siddiqi, Asif A. (2002). "1976" (PDF). Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes 1958–2000. Monographs in Aerospace History, No. 24. NASA History Office. pp. 115–116. Archived (PDF) from the original on 6 June 2013. Retrieved 12 July 2017.
- "Luna 24". US National Space Science Data Center. Archived from the original on 14 May 2019. Retrieved 14 December 2013.
- "Hiten". NASA Space Science Data Coordinated Archive (NSSDCA). Archived from the original on 8 December 2017. Retrieved 12 April 2019.
- "Japanese probe crashes into Moon". BBC. 11 June 2009. Archived from the original on 30 September 2009. Retrieved 8 May 2010.
- "月周回衛星「かぐや(SELENE)」 – SELENE通信 – お知らせ" (in Japanese). JAXA. 30 June 2009. Archived from the original on 3 October 2011. Retrieved 17 July 2009.
- Varanasi, P.; Tompkins, S.; Taylor, L. A.; Sunshine, J.; Staid, M.; Runyon, C.; Petro, N.; Nettles, J.; Mustard, J. (23 October 2009). "Character and Spatial Distribution of OH/H2O on the Surface of the Moon Seen by M3 on Chandrayaan-1". Science. 326 (5952): 568–572. Bibcode:2009Sci...326..568P. doi:10.1126/science.1178658. ISSN 0036-8075. PMID 19779151. S2CID 447133.
- "China's Moon orbiter Chang'e-2 travels 1.5 km into outer space". The Economic Times. 30 August 2011. Archived from the original on 4 February 2016. Retrieved 31 August 2011.
- "Chang'e 2: The Full Story". The Planetary Society. 25 August 2012. Archived from the original on 23 April 2016. Retrieved 29 October 2012.
- Gold, Scott (11 September 2011). "After delay, GRAIL moon mission launches". Los Angeles Times. Archived from the original on 8 November 2012. Retrieved 8 April 2013.
- Harwood, William. "NASA launches GRAIL lunar probes". CBS News. Archived from the original on 11 September 2011. Retrieved 11 September 2011.
- Blau, Patrick. "GRAIL Mission Design and Timeline". Spaceflight 101. Archived from the original on 19 July 2012. Retrieved 29 October 2012.
- Trajectory Design Enhancements to Mitigate Risk for the Transiting Exoplanet Survey Satellite (TESS) (PDF). ntrs.nasa.gov (Report). NASA. 13 September 2016. Archived (PDF) from the original on 1 January 2017. Retrieved 1 January 2017.
- How China's lunar relay satellite arrived in its final orbit Archived 17 October 2018 at the Wayback Machine. Luyuan Xu, The Planetary Society. 15 June 2018.
- @planet4589 (31 July 2019). "The Chinese Longjiang-2 (DSLWP-B) lunar orbiting spacecraft completed its mission on Jul 31 at about 1420 UTC, in a planned impact on the lunar surface" (Tweet). Retrieved 1 August 2019 – via Twitter.
- Rincon, Paul (7 December 2018). "China mission launches to far side of Moon". BBC News. Archived from the original on 8 December 2018. Retrieved 9 December 2018.
- "China Makes Historic 1st Landing on Mysterious Far Side of the Moon". Space.com. 3 January 2019. Archived from the original on 3 January 2019. Retrieved 3 January 2019.
- Grush, Loren (21 February 2019). "Watch SpaceX launch a trio of spacecraft, including a lander bound for the Moon". The Verge. Archived from the original on 21 February 2019. Retrieved 22 February 2019.
- "Beresheet". NASA Solar System Exploration. 19 February 2019. Archived from the original on 24 June 2019. Retrieved 4 April 2019..
- Foust, Jeff (12 April 2019). "SpaceIL says "chain of events" led to crash of lunar lander". SpaceNews. Archived from the original on 14 April 2019. Retrieved 12 April 2019.
- "Lander Vikram located: K Sivan". www.aninews.in. Archived from the original on 8 September 2019. Retrieved 8 September 2019.
- "China's Chang'e-5 orbiter is heading back to the moon". SpaceNews. 6 September 2021. Archived from the original on 30 August 2022. Retrieved 8 September 2021.
- Figliozzi, Gianine (8 June 2022). "CAPSTONE Mission Launch No Longer Targeting June 13". NASA. Archived from the original on 9 June 2022. Retrieved 9 June 2022.
- "NASA Funds CubeSat Pathfinder Mission to Unique Lunar Orbit". NASA (Press release). 13 September 2019. Archived from the original on 10 November 2021. Retrieved 12 October 2021.
- "Rocket Lab to Launch NASA Funded Commercial Moon Mission from New Zealand". Rocket Lab. 9 August 2021. Archived from the original on 8 August 2021. Retrieved 4 September 2021.
- Foust, Jeff (11 November 2022). "NASA moving ahead with Nov. 16 Artemis 1 launch attempt". SpaceNews. Retrieved 12 November 2022.
- "ispace Begins Final Assembly of Lunar Lander Flight Model Ahead of First Mission". ispace. 14 July 2021. Archived from the original on 14 July 2021. Retrieved 20 July 2021.
- "MBRSC Teams Up with Japan's ispace on Emirates Lunar Mission". ispace. 14 April 2021. Archived from the original on 14 April 2021. Retrieved 14 April 2021.
- "NASA Eyes New Lunar CubeSat Orbit, Propulsion Challenges Continue – Small Satellite Missions".
- Nate Doughty (19 April 2023). "ULA rocket taking Astrobotic's lunar lander to space pushes back departure date following explosion during testing". www.bizjournals.com. Retrieved 16 May 2023.
- Baylor, Michael (16 April 2023). "Soyuz-2.1b/Fregat-M - Luna 25 & Others". Next Spaceflight. Retrieved 16 April 2023.
- "ISRO's missions to moon, sun likely to take place in July". Hindustan Times. 6 May 2023. Retrieved 9 May 2023.
- Park, Si-soo (3 February 2022). "India targets August launch for Chandrayaan-3 lunar lander". SpaceNews. Retrieved 3 February 2022.
- "小型探査機による高精度月面着陸の技術実証(SLIM)について" (PDF) (in Japanese). 3 June 2015. Archived (PDF) from the original on 22 June 2015. Retrieved 23 June 2015.
- Park, Si-soo (3 April 2023). "Japan delays H2A launch in the wake of H3 failure". Retrieved 11 May 2023.
- "Small lunar-lander "SLIM" for the pinpoint landing technology demonstration" (PDF). 2015. Archived (PDF) from the original on 28 March 2017. Retrieved 23 June 2015.
- "The tiny rover payload in SLIM mission" (PDF). 2015. Archived (PDF) from the original on 22 June 2015. Retrieved 23 June 2015.
- "Japan to attempt uncrewed lunar landing in 2018". 22 April 2015. Archived from the original on 8 October 2016. Retrieved 26 April 2016.
- Hirano, Daichi (7 October 2022). "Palm-Sized Lunar Excursion Vehicle 2 (LEV-2)". JAXA. Archived from the original on 3 October 2022. Retrieved 29 October 2022.
- "Intuitive Machines reports first quarter 2023 financial results". Intuitive Machines (Press release). 11 May 2023. Retrieved 14 May 2023.
- Kanayama, Lee (13 April 2020). "NOVA-C selects landing site, Masten gains CLPS contracts". NASASpaceFlight. Archived from the original on 12 April 2021. Retrieved 27 September 2020.
- "Will Geometric Energy Corporation and SpaceX Use Artificial Intelligence in the Doge-1 Mission to the Moon?". www.wicz.com.
- "Upcoming Mission Events". NASA. Retrieved 6 April 2023.
- Crain, Timothy (18–20 July 2022). Commercial Capabilities to Support Lunar Exploration – Intuitive Machines (PDF). John Glenn Memorial Symposium. Case Western Reserve University: American Astronautical Society. Archived (PDF) from the original on 12 November 2022. Retrieved 12 November 2022.
- Johnson, Arianna. "MIT Will Return To The Moon For The First Time Since Apollo, Thanks To This Space Startup". Forbes.
- Machines, Intuitive (5 January 2023). "Intuitive Machines Adds Commercial Lunar Rover to its Second Mission to the Moon". Intuitive Machines.
- Foust, Jeff (27 September 2021). "Spaceflight offers lunar flyby rideshare mission".
- China N' Asia Spaceflight [@CNSpaceflight] (24 November 2022). "Update:
2024 Queqiao-2 data relay
2025 Chang'e-6 lunar sample return from far side
2026 Chang'e-7 lunar landing in south pole
2028 Chang'e-8 basic model of lunar research station" (Tweet) – via Twitter. - Jones, Andrew (8 September 2022). "China's Moon Missions Shadow NASA Artemis's Pace". IEEE Spectrum. Retrieved 8 September 2022.
- "China advances lunar exploration programdate=April 25, 2023". Retrieved 30 April 2023.
- Andrew Jones [@AJ_FI] (25 April 2023). "China's Chang'e-6 sample return mission (a first ever lunar far side sample-return) is scheduled to launch in May 2024, and expected to take 53 days from launch to return module touchdown. Targeting southern area of Apollo basin (~43º S, 154º W)" (Tweet) – via Twitter.
- "China's Moon Missions Shadow NASA Artemis's Pace - IEEE Spectrum". spectrum.ieee.org.
- "Three-peat: Intuitive Machines Selects SpaceX Falcon 9 Rocket for Third Moon Mission". Intuitive Machines (Press release). 10 August 2021. Archived from the original on 12 February 2022. Retrieved 10 August 2021.
- "Astrobotic selects Falcon Heavy to launch NASA's VIPER lunar rover". SpaceNews. 13 April 2021. Archived from the original on 19 April 2021. Retrieved 13 April 2021.
- Loff, Sarah (23 October 2019). "New VIPER Lunar Rover to Map Water Ice on the Moon". NASA.
- Potter, Sean (9 February 2021). "NASA Awards Contract to Launch Initial Elements for Lunar Outpost". NASA.
- Foust, Jeff (31 October 2022). "NASA predicts first Starship orbital launch as soon as December".
- Sommer, M.; Krüger, H.; Srama, R.; Hirai, T.; Kobayashi, M.; Arai, T.; Sasaki, S.; Kimura, H.; Moragas-Klostermeyer, G.; Strub, P.; Lohse, A.-K. (21 September 2020). Destiny+ Dust Analyzer – Campaign & timeline preparation for interplanetary & interstellar dust observation during the 4-year transfer phase from Earth to Phaethon. Europlanet Science Congress 2020. Copernicus Publications. Archived from the original on 9 October 2020. Retrieved 27 September 2020.
- "Firefly Completes Integration Readiness Review of its Blue Ghost Lunar Lander". Firefly Aerospace. 26 April 2022. Archived from the original on 1 May 2022. Retrieved 1 May 2022.
- "NASA Selects Firefly Aerospace for Artemis Commercial Moon Delivery in 2023". NASA (Press release). 4 February 2021. Archived from the original on 4 February 2021. Retrieved 4 February 2021.
- "Lunar Lander". Firefly Aerospace. 1 February 2021. Archived from the original on 5 February 2021. Retrieved 4 February 2021.
- "Key Updates for HAKUTO-R Announced as Mission 1 Lander Prepares to Enter Final Stage of Integration". ispace. 25 January 2022. Archived from the original on 25 January 2022. Retrieved 26 January 2022.
- Jones, Andrew (19 November 2021). "Plus Ultra aims to provide communications infrastructure for incoming wave of moon missions".
- Rainbow, Jason (21 January 2022). "Plus Ultra's lunar comsats to hitch rides on ispace moon landers". SpaceNews. Retrieved 26 April 2023.
- "Россия запустит космический аппарат на Луну 1 октября 2021 года" [Russia will launch a spacecraft to the moon on 1 October 2021]. RIA Novosti (in Russian). 17 March 2020. Archived from the original on 17 March 2020. Retrieved 18 March 2020.
- Russian Moon exploration program Archived 15 September 2018 at the Wayback Machine. Russian Research Institute (IKI). 2017.
- Solomon, Shoshanna (19 July 2021). "Israel's Helios hitches ride on Japan lunar lander in bid to make oxygen on Moon". The Times of Israel. Retrieved 20 July 2021.
- Mark R. Whittington (12 February 2023). "Beresheet 2: The latest in America's inclusive return to the moon".
- "NASA selects Firefly Aerospace for mission to moon's far side in 2026". Space.com. 17 March 2023.
- Jones, Andrew (28 November 2022). "China outlines pathway for lunar and deep space exploration". SpaceNews. Retrieved 29 November 2022.
- "A Big Rover Aims to Be Like 'UPS for the Moon'". Yahoo News.
- "Astrobotic Purchases Falcon Heavy Launch Services". Astrobotic Technology. 25 April 2023.
- Chen, Stephen (29 December 2021). "China speeds up moon base plan in space race against the US". South China Morning Post. Archived from the original on 21 August 2022. Retrieved 20 August 2022.
- China's Deep Space Exploration Roadmap Archived 14 February 2019 at the Wayback Machine. 2018.
- Jones, Andrew (29 December 2021). "China has moon's south pole in its sights with 3 missions launching this decade". Space.com. Archived from the original on 1 January 2022. Retrieved 1 January 2022.
- Foust, Jeff (24 February 2023). "NASA plans to start work this year on first Gateway logistics mission".
- Foust, Jeff (13 March 2023). "NASA planning to spend up to $1 billion on space station deorbit module". SpaceNews. Retrieved 13 March 2023.
- Foust, Jeff (9 November 2021). "NASA delays human lunar landing to at least 2025". SpaceNews. Archived from the original on 1 September 2022. Retrieved 9 November 2021.
- "#dearMoon". #dearMoon. Archived from the original on 12 January 2020. Retrieved 18 September 2018.
- Foust, Jeff (13 March 2023). "NASA planning to spend up to $1 billion on space station deorbit module".
- "Определен срок полета российского корабля "Орел" с экипажем на МКС" [The scheduled time for the first crewed flight of the Russian spacecraft Orel to the ISS has been determined]. RIA Novosti (in Russian). 13 February 2020. Archived from the original on 24 April 2021. Retrieved 24 April 2021.
- Jones, Andrew (15 November 2021). "Chinese crewed moon landing possible by 2030, says senior space figure". SpaceNews. Retrieved 8 September 2022.
- ISRO planning 7 interplanetary missions, Venus on the to-do list Archived 7 November 2020 at the Wayback Machine. Sidharth MP, DNA India. 18 May 2019.
- "Conheça a Garatéa-L, missão que pretende levar o Brasil à Lua em 2025" (in Brazilian Portuguese). 10 August 2022. Archived from the original on 14 August 2022. Retrieved 9 October 2022.
- Neeraj Srivastava; S. Vijayan; Amit Basu Sarbadhikari (27 September 2022), "Future Exploration of the Inner Solar Syetem: Scope and the Focus Areas", Planetary Sciences Division (PSDN), Physical Research Laboratory – via ISRO Facebook Panel Discussion, Mars Orbiter Mission National Meet
- "Parsec™ Service from Lockheed Martin". Lockheed Martin.
- https://www.korea.kr/news/policyNewsView.do?newsId=148885478 . Blue House, 문 대통령 "내년 달 궤도선·2030년 달 착륙…7대 우주강국 도약". 18 May 2021.
- Bi-Sat Observations of the Lunar Atmosphere Above Swirls (BOLAS): Tethered SmallSat Investigation of Hydration and Space Weathering Processes at the Moon. (PDF) Stubbs, T. J.; Malphrus, B. K.; Hoyt, R., etal. 49th Lunar and Planetary Science Conference; 19–23 March 2018 at The Woodlands, Texas, USA.
- "About the mission". esc Aerospace. 2023. Retrieved 27 March 2023.
- NASA scraps a lunar surface mission — just as it's supposed to focus on a Moon return Archived 3 November 2018 at the Wayback Machine Loren Grush, The Verge April 27, 2018